inspectionINSPECTION WORKSHEET (BINS-000970-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000181-2017 Case Module:Permit
Inspection Date:Fri Feb 15, 2019 Inspection Status:Partial Pass
Inspector:Mark Smith Inspection Type:Building Framing
Job Address:Parcel Number:21 Big Boom RD
Queensbury, NY 12804
309.14-1-89.1
Contact Type Company Name Name
Agent White, Richard
Contractor Bette & Cring, LLC
Applicant Bette & Cring, LLC
Granted Permission Bette & Cring, LLC
Architect Silvestri Architects, PC
Primary Owner Exit 18 Development LLC
Primary Owner Ed & Ed T Enterprises, LLC
Engineer Hutchins Engineering
Checklist Item Passed Comments
Building Inspector Notes NO 2/11/19 Framing Not Approved - Preliminary Framing
- Provide Dan Ryan's Inspection Report for the first floor
framing inspection for walls and ceiling.
- Provide floor and roof truss diagrams for framing
inspections.
- Engineer's approval on fastening of interior walls, corridor
walls, and shear walls. Framer has used power actuated
nails at all locations which is different from the approved
plans. I spoke with Dan Ryan the engineer today while on
site performing my inspection.
Feb 15, 2019 Page (1)
INSPECTION WORKSHEET (BINS-000970-2019)
Checklist Item Passed Comments
2/15/19 Framing for first and second floor main hall ceiling
approved. Third floor main hall ceiling not approved, it is still
missing joist hangers.sound proofing insulation must be
verified before sheet rock is installed.
Framing NO 2/11/19 Framing Not Approved - Preliminary Framing
- Provide Dan Ryan's Inspection Report for the first floor
framing inspection for walls and ceiling.
- Provide floor and roof truss diagrams for framing
inspections.
- Engineer's approval on fastening of interior walls, corridor
walls, and shear walls. Framer has used power actuated
nails at all locations which is different from the approved
plans. I spoke with Dan Ryan the engineer today while on
site performing my inspection.
2/15/19 first and second floor main hall ceiling only approved.
Third floor is missing joist hangers. Sound proofing insulation
must be verified before Sheetrock is installed.
Truss Specification Provided NO
Bracing Bridging NO
Hurricane Clips/Uplift Screws/Nail Holes Filled NO
Air Seal all Plates and Sills NO
Air Seal All Registers at Floor NO
Air Sealing all Joints Before Insulation NO
Joist hangers NO
Jack Posts Main Beams NO
Exterior sheeting nailed properly NO
Feb 15, 2019 Page (2)
INSPECTION WORKSHEET (BINS-000970-2019)
Checklist Item Passed Comments
12 O.C.NO
Headroom 6 ft. 8 in.NO
Notches Holes Bearing Walls NO
Metal Strapping for Notches Top Plate NO
Draft stopping 1,000 sq. ft. floor trusses NO
Anchor Bolts 6 ft. or less on center NO
Ice and water shield 24 inches from wall NO
Soffits-Insulation Baffel NO
Windows Habitable Space Bedrooms NO
24 in. (H)NO
20 in. (W)NO
5.7 sf above below grade NO
5.0 sf grade NO
Design Professional Sign-off, if required NO
Feb 15, 2019 Page (3)
Smith, Mark (Inspector)
INSPECTION WORKSHEET (BINS-000990-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000181-2017 Case Module:Permit
Inspection Date:Tue Feb 19, 2019 Inspection Status:Partial Pass
Inspector:John O'Brien Inspection Type:Building Insulation
Job Address:Parcel Number:21 Big Boom RD
Queensbury, NY 12804
309.14-1-89.1
Contact Type Company Name Name
Agent White, Richard
Primary Owner Ed & Ed T Enterprises, LLC
Granted Permission Bette & Cring, LLC
Contractor Bette & Cring, LLC
Primary Owner Exit 18 Development LLC
Architect Silvestri Architects, PC
Engineer Hutchins Engineering
Applicant Bette & Cring, LLC
Checklist Item Passed Comments
Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in
corridor floors.
- 1st Floor Corridor Ceiling North Wing only where 3 1/2"
Sound Insulation is Installed before elevator.
- 2nd Floor Corridor Ceiling at North & South Wings only
where 3 1/2" Sound Insulation is installed.
Window Sealing NO
U Factors = .3 cfm for windows, .5 cfm for doors NO
Feb 19, 2019 Page (1)
INSPECTION WORKSHEET (BINS-000990-2019)
Checklist Item Passed Comments
Tyvek or Similar Exterior Sealant NO
Proper Vent, Attic Vent NO
Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in
corridor floors.
- 1st Floor Corridor Ceiling North Wing only where 3 1/2"
Sound Insulation is Installed before elevator.
- 2nd Floor Corridor Ceiling at North & South Wings only
where 3 1/2" Sound Insulation is installed.
Blower Door Test NO
Combustion Air Supply for Furnace NO
Fresh air supply 3' from grade NO
Duct Insulation - if required in unheated spaces NO
Door / Window Sealed (No Insulation)NO
Air Barrier behind Knee Walls NO
Tub Shower R-20 with Vapor Barrier NO
All Ductwork Sealed Return and Supply NO
Duct Blaster Test for duct work, R-8 NO
All Return Air Hard Duct Work NO
House Wrap Taped at all Seams NO
Feb 19, 2019 Page (2)
O'Brien, John (Inspector)
INSPECTION WORKSHEET (006386-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:
Inspection Date:
Inspector:
Case Module:
Inspection Status:
Inspection Type:
CC-000181-2017
09/04/2018
John O'Brien
Permit
Passed
Building Inspector Visit
Job Address:Parcel Number:21 Big Boom RD
Queensbury, NY 12804
309.14-1-89.1
Contact Type Company Name Name
Primary Owner Exit 18 Development LLC ,
Primary Owner Ed & Ed T Enterprises, LLC ,
Agent White, Richard
Contractor Bette & Cring, LLC ,
Architect Silvestri Architects, PC ,
Engineer Hutchins Engineering ,
Granted Permission Bette & Cring, LLC ,
Applicant Bette & Cring, LLC ,
Checklist Item Passed Comments
Building Inspector Notes NO 9/4/18 As per my site visit I met Bette Cring project
superintendent Fred Palma. Footings to begin next
week the engineer Fred Dente will be on site this week
to address soil compaction. I also discussed with Fred
how to schedule inspections and giving at least 24
hours notice. I also explained to him if he will be pouring
multiple days we will block a time slot for his inspection
on those days. Fred provided the names of the
subcontractors already hired for the project which are
listed below.
Subcontractors:
Kingsley - Site
Jag - Concrete
Kohler - Framing
Sep 04, 2018 Page (1)
O'Brien, John (Inspector)
INSPECTION WORKSHEET (BINS-007559-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000181-2017Case Module:Permit
Inspection Date:10/25/2018Inspection Status:Partial Pass
Inspector:John O'BrienInspection Type:Building Foundation
Job Address:21 Big Boom RDParcel Number:309.14-1-89.1
Queensbury, NY 12804
Contact TypeCompany NameName
Primary OwnerEd & Ed T Enterprises, LLC\[Ed & Ed T Enterprises, LLC\]
ApplicantBette & Cring, LLC\[Bette & Cring, LLC\]
ArchitectSilvestri Architects, PC\[Silvestri Architects, PC\]
EngineerHutchins Engineering\[Hutchins Engineering\] ,
ContractorBette & Cring, LLC\[Bette & Cring, LLC\]
Primary OwnerExit 18 Development LLC\[Exit 18 Development LLC\] ,
AgentWhite, Richard
Granted PermissionBette & Cring, LLC\[Bette & Cring, LLC\]
Checklist ItemPassedComments
Building Inspector NotesNO10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8
A0.5
10/25/18 Foundation Insulation & Backfill Partial
Approval
- C7 to A4
FootingsYESPartial only as per specs with 3 rows #5 continuous #4 J
hooks tied in 32" OC
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
PiersNO
Monolithic SlabNO
Foundation / WallpourYES10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8
A0.5
Oct 25, 2018Page (3)
INSPECTION WORKSHEET (BINS-007559-2018)
Checklist ItemPassedComments
Reinforcement in PlaceYES10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
Reinforcement in PlaceYES10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8
A0.5
Footing Dowels or Keyway in placeYES
Foundation DampproofingNO
Foundation WaterproofingNO
Footing Drain Daylight or SumpNO
Footing Drain Stone - 12 inch widthNO
Footing Drain Stone - 6 inches above footingNO
Footing Drain stone - 6 mil polyNO
Backfill ApprovalNO10/25/18 Foundation Insulation & Backfill Partial
Approval
- C7 to A4
Plumbing Under SlabNO
PVC / Cast / CopperNO
Foundation Insulation Interior / ExteriorYES10/25/18 Foundation Insulation & Backfill Partial
Approval
- C7 to A4
Rough Grade 6 inch drop within 10 ft.NO
Poly Under SlabNO
O'Brien, John (Inspector)
Oct 25, 2018Page (4)
INSPECTION WORKSHEET (BINS-000232-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
CC-000181-2017Permit
Case Number:Case Module:
Wed Jan 9, 2019Partial Pass
Inspection Date:Inspection Status:
John O'BrienBuilding Foundation
Inspector:Inspection Type:
21 Big Boom RD309.14-1-89.1
Job Address:Parcel Number:
Queensbury, NY 12804
Contact TypeCompany NameName
AgentWhite, Richard
EngineerHutchins Engineering
ArchitectSilvestri Architects, PC
Granted PermissionBette & Cring, LLC
Primary OwnerEd & Ed T Enterprises, LLC
ApplicantBette & Cring, LLC
Primary OwnerExit 18 Development LLC
ContractorBette & Cring, LLC
Checklist ItemPassedComments
Jan 09, 2019Page (1)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
Building Inspector NotesNO10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
11/14/18 Piers(Entry Canopy) & Interior Footings Not Ready!
-Rescheduled for 1:00 PM tomorrow.
11/15/18 Entry Canopy Piers Approved
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
1/3/19 Bond Beams Partial Approval - Elevator Shaft
- Vertical Bars Verified at 48" oc
- Bond beam Approved at 2nd floor (2-#4 bars continuous
and corner bars installed)
NOTE: Unable to verify bond beams with reinforcing in lieu of
steel lintels at elevator door openings. The bond beams had
already been grouted. The engineer will have to approve
these locations not inspected by whatever means necessary
to verify reinforcing was installed. The structural masonry
(grout & reinforcing)needs to be inspected by the third party
inspector also. Please make arrangements for future
inspections.
1/7/19 Bond Beam Partial Approval - Second Floor elevator
door openings and continuation of vertical reinforcing at 48"
oc.
1/7/19 Bond Beam Partial Approval - Elevator Shaft
Jan 09, 2019Page (2)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
- Bond beam Approved at 2nd floor 2 courses above elevator
doors (2-#4 bars continuous and corner bars installed)
1/9/19 Bond Beams Approved - Elevator Complete
FootingsYESPartial only as per specs with 3 rows #5 continuous #4 J
hooks tied in 32" OC
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/30/18. Remainder of footings east wall rebar per plan
11/7/18 Elevator pit footing per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
PiersYES11/15/18 Entry Canopy Piers Approved
Monolithic SlabNO
Jan 09, 2019Page (3)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
Reinforcement in PlaceYES10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
11/15/18 Entry Canopy Piers Approved
1/3/19 Bond Beams Partial Approval - Elevator Shaft
- Vertical Bars Verified at 48" oc
- Bond beam Approved at 2nd floor (2-#4 bars continuous
and corner bars installed)
NOTE: Unable to verify bond beams with reinforcing in lieu of
steel lintels at elevator door openings. The bond beams had
already been grouted. The engineer will have to approve
these locations not inspected by whatever means necessary
to verify reinforcing was installed. The structural masonry
(grout & reinforcing)needs to be inspected by the third party
inspector also. Please make arrangements for future
inspections.
1/7/19 Bond Beam Partial Approval - Second Floor elevator
door openings and continuation of vertical reinforcing at 48"
oc.
1/7/19 Bond Beam Partial Approval - Elevator Shaft
- Bond beam Approved at 2nd floor 2 courses above elevator
doors (2-#4 bars continuous and corner bars installed)
1/9/19 Bond Beams Approved - Elevator Complete
Jan 09, 2019Page (4)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
Foundation / WallpourYES10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/30/18 7 to 11A rebar per plan
11/1/18. Front wall complete. East wall to laundry room
11/5/18 remainder of foundation wall
11/9/18 foundation wall for elevator pit
1/3/19 Bond Beams Partial Approval - Elevator Shaft
- Vertical Bars Verified at 48" oc
- Bond beam Approved at 2nd floor (2-#4 bars continuous
and corner bars installed)
NOTE: Unable to verify bond beams with reinforcing in lieu of
steel lintels at elevator door openings. The bond beams had
already been grouted. The engineer will have to approve
these locations not inspected by whatever means necessary
to verify reinforcing was installed. The structural masonry
(grout & reinforcing)needs to be inspected by the third party
inspector also. Please make arrangements for future
inspections.
1/7/19 Bond Beam Partial Approval - Second Floor elevator
door openings and continuation of vertical reinforcing at 48"
oc.
1/7/19 Bond Beam Partial Approval - Elevator Shaft
- Bond beam Approved at 2nd floor 2 courses above elevator
doors (2-#4 bars continuous and corner bars installed)
1/9/19 Bond Beams Approved - Elevator Complete
Jan 09, 2019Page (5)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
Reinforcement in PlaceYES10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
11/1/18 rebar per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
12/7/18. Pier for canopy and for north end floor haunches
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
Footing Dowels or Keyway in placeYES11/15/18 Entry Canopy Piers Approved
Foundation DampproofingNO
Foundation WaterproofingNO
Footing Drain Daylight or SumpNO
Footing Drain Stone - 12 inch widthNO
Footing Drain Stone - 6 inches above footingNO
Footing Drain stone - 6 mil polyNO
Backfill ApprovalNO10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
Jan 09, 2019Page (6)
INSPECTION WORKSHEET (BINS-000232-2019)
Checklist ItemPassedComments
Plumbing Under SlabNO11/9/18 plumbing under slab south side of building
PVC / Cast / CopperNO
Foundation Insulation Interior / ExteriorYES10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
10/29/18. Not ready
11/1/18 front entrance wall
11/5/18 remainder of front entrance wall interior
11/8/18 remainder of foundation insulation
Rough Grade 6 inch drop within 10 ft.NO
Poly Under SlabNO
O'Brien, John (Inspector)
Jan 09, 2019Page (7)