INSPECTION WORKSHEET (BINS-008460-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
CC-000181-2017Permit
Case Number:Case Module:
Wed Dec 5, 2018Partial Pass
Inspection Date:Inspection Status:
John O'BrienBuilding Foundation
Inspector:Inspection Type:
21 Big Boom RD309.14-1-89.1
Job Address:Parcel Number:
Queensbury, NY 12804
Contact TypeCompany NameName
Granted PermissionBette & Cring, LLC
ApplicantBette & Cring, LLC
AgentWhite, Richard
EngineerHutchins Engineering
ContractorBette & Cring, LLC
Primary OwnerExit 18 Development LLC
Primary OwnerEd & Ed T Enterprises, LLC
ArchitectSilvestri Architects, PC
Checklist ItemPassedComments
Dec 05, 2018Page (1)
INSPECTION WORKSHEET (BINS-008460-2018)
Checklist ItemPassedComments
Building Inspector NotesNO10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
11/14/18 Piers(Entry Canopy) & Interior Footings Not Ready!
-Rescheduled for 1:00 PM tomorrow.
11/15/18 Entry Canopy Piers Approved
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
Dec 05, 2018Page (2)
INSPECTION WORKSHEET (BINS-008460-2018)
Checklist ItemPassedComments
FootingsYESPartial only as per specs with 3 rows #5 continuous #4 J
hooks tied in 32" OC
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/30/18. Remainder of footings east wall rebar per plan
11/7/18 Elevator pit footing per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
PiersYES11/15/18 Entry Canopy Piers Approved
Monolithic SlabNOI
Reinforcement in PlaceYES10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
11/15/18 Entry Canopy Piers Approved
Foundation / WallpourYES10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/30/18 7 to 11A rebar per plan
11/1/18. Front wall complete. East wall to laundry room
11/5/18 remainder of foundation wall
11/9/18 foundation wall for elevator pit
Dec 05, 2018Page (3)
INSPECTION WORKSHEET (BINS-008460-2018)
Checklist ItemPassedComments
Reinforcement in PlaceYES10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
11/1/18 rebar per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
11/28/18 Interior Column and Pier Footings Partial Approval!
- 2 Column Footings @ 8 Line
- 2 Column Footings between 10.A & 11.A Lines
- Pier Footing at 5 Line
12/4/18 Interior Footings & Monolithic Slab Partial Approval
- Monolithic Slab to 8 line.
- Interior Footings between 4 & 8 Lines
- Exterior Footing @ 10A & E Line
Footing Dowels or Keyway in placeYES11/15/18 Entry Canopy Piers Approved
Foundation DampproofingNO
Foundation WaterproofingNO
Footing Drain Daylight or SumpNO
Footing Drain Stone - 12 inch widthNO
Footing Drain Stone - 6 inches above footingNO
Footing Drain stone - 6 mil polyNO
Backfill ApprovalNO10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
Dec 05, 2018Page (4)
INSPECTION WORKSHEET (BINS-008460-2018)
Checklist ItemPassedComments
Plumbing Under SlabNO11/9/18 plumbing under slab south side of building
PVC / Cast / CopperNO
Foundation Insulation Interior / ExteriorYES10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
10/29/18. Not ready
11/1/18 front entrance wall
11/5/18 remainder of front entrance wall interior
11/8/18 remainder of foundation insulation
Rough Grade 6 inch drop within 10 ft.NO
Poly Under SlabNO
O'Brien, John (Inspector)
Dec 05, 2018Page (5)
INSPECTION WORKSHEET (BINS-008300-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
CC-000181-2017Permit
Case Number:Case Module:
Tue Nov 27, 2018Partial Pass
Inspection Date:Inspection Status:
John O'BrienBuilding Foundation
Inspector:Inspection Type:
21 Big Boom RD309.14-1-89.1
Job Address:Parcel Number:
Queensbury, NY 12804
Contact TypeCompany NameName
Primary OwnerEd & Ed T Enterprises, LLC
Granted PermissionBette & Cring, LLC
EngineerHutchins Engineering
AgentWhite, Richard
ApplicantBette & Cring, LLC
ContractorBette & Cring, LLC
Primary OwnerExit 18 Development LLC
ArchitectSilvestri Architects, PC
Checklist ItemPassedComments
Nov 27, 2018Page (1)
INSPECTION WORKSHEET (BINS-008300-2018)
Checklist ItemPassedComments
Building Inspector NotesNO10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
11/14/18 Piers(Entry Canopy) & Interior Footings Not Ready!
-Rescheduled for 1:00 PM tomorrow.
11/15/18 Entry Canopy Piers Approved
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
FootingsYESPartial only as per specs with 3 rows #5 continuous #4 J
hooks tied in 32" OC
10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
10/30/18. Remainder of footings east wall rebar per plan
11/7/18 Elevator pit footing per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
PiersYES11/15/18 Entry Canopy Piers Approved
Monolithic SlabNO
Nov 27, 2018Page (2)
INSPECTION WORKSHEET (BINS-008300-2018)
Checklist ItemPassedComments
Reinforcement in PlaceYES10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
11/15/18 Entry Canopy Piers Approved
Foundation / WallpourYES10/22/18 Foundation Walls Partial Approval
- D7 to A4
10/25/18 Foundation Walls Partial Approval
- Partial South Rear Elevation Frost Walls. 4 A.05 to 8 A0.5
10/30/18 7 to 11A rebar per plan
11/1/18. Front wall complete. East wall to laundry room
11/5/18 remainder of foundation wall
11/9/18 foundation wall for elevator pit
Reinforcement in PlaceYES10/25/18 Footings Partial Approval
- Balance of North Front Elevation Footings
- West Side Elevation Footings
11/1/18 rebar per plan
11/20/18 Interior Pier Footings & Floor Haunches Partial
Approval.
- Interior Pier Footings A9, A10, D9 and D10
- Interior Pier A.08/5
- Floor Haunches 12 thru 17
11/27/18 Interior Column Footings Partial Approval
- 5 interior column Footings at 9, 10, & 11 lines
Footing Dowels or Keyway in placeYES11/15/18 Entry Canopy Piers Approved
Foundation DampproofingNO
Foundation WaterproofingNO
Footing Drain Daylight or SumpNO
Footing Drain Stone - 12 inch widthNO
Footing Drain Stone - 6 inches above footingNO
Nov 27, 2018Page (3)
INSPECTION WORKSHEET (BINS-008300-2018)
Checklist ItemPassedComments
Footing Drain stone - 6 mil polyNO
Backfill ApprovalNO10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
Plumbing Under SlabNO11/9/18 plumbing under slab south side of building
PVC / Cast / CopperNO
Foundation Insulation Interior / ExteriorYES10/25/18 Foundation Insulation & Backfill Partial Approval
- C7 to A4
10/29/18. Not ready
11/1/18 front entrance wall
11/5/18 remainder of front entrance wall interior
11/8/18 remainder of foundation insulation
Rough Grade 6 inch drop within 10 ft.NO
Poly Under SlabNO
O'Brien, John (Inspector)
Nov 27, 2018Page (4)