Loading...
ResCheck Y N REScheck Software Version 4.6.4 . Certificate o , tri : Compliance Certi ca e o a ac � Project Bardin Project n i TI c a .0 Energy Code: 2015 IECC L �PR 1 S Z�191 g IV 2 rii) EC IE 11 V Location: Lake George, New Yorka ;p go Construction Type: Single-family �� � ®� JE�NS � Q 0 Project Type: New Construction BUILDING CODES �, M Conditioned Floor Area: 2,804 ft2 _ Glazing Area 18% CD I Climate Zone: 6 (7377 HDD) 71 N Permit Date: N Permit Number: - O N Construction Site: Owner/Agent: Designer/Contractor: ;-,, CO Randy Bardin Frank Jelley NY NY 518-796-5611 Compliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 488 Your UA: 488 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Flat Ceiling or Scissor Truss 1,985 49.0 0.0 0.026 52 Wall 1:Wood Frame, 16"o.c. 3,420 21.0 0.0 0.057 159 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 489 0.260 127 Door 1: Glass 135 0.260 35 Basement Wall 1: Solid Concrete or Masonry 1,089 21.0 0.0 0.043 47 Wall height: 8.7' Depth below grade: 7.5' Insulation depth: 8.7' Basement Wall 2:Wood Frame 1,080 21.0 0.0 0.060 65 Wall height: 8.7' Depth below grade: 0.0' Insulation depth: 8.7' Mud Room Floor:All-Wood Joist/Tru5s ver Unconditioned Space - 95 30.0 0.0 0.033 3 Compliance Statement: The pi,, p d—��'b;)itld'ing•design described here is consistent with the building plans,specifications, and other calculations submitted with t e`perfxifi application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.4 and/ o cgmply with,the mandatory requi ents li to in th EScheck Inspection Checklist. Frank i QC/4/ Name-Title ' < ' Si nature date i/1¼Project Title: Bardin Project ` , Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Ba di', :. din Project.rck Page 1 of 9 REScheck Software Version 4.6.4 Irv. Inspection Checklist Energy Code: 2015 IECC Requirements: 97.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified #fi Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the building envelope.Thermal ['Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ii❑Complies Requirement will be met. 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR212 on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ❑Not Observable approved by the code official. Btu/hr Btu/hr ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 2 of 9 Section Plans Verified Field Verified Foundation Inspection Value Value Complies? Comments/Assumptions &Req.ID 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies Requirement will be met. [FO5]1 insulation installed per ❑Does Not manufacturer's instructions. ['Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ElComplies See the Envelope Assemblies [FO6]1 insulation depth of burial or "'Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ' ❑Complies Exception: Requirement is [FO1l]2 to protect exposed exterior ❑Does Not not applicable. insulation and extends a minimum of 6 in. below grade. [Not Observable ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies Exception: Requirement is [FO12]2 controls installed. ❑Does Not not applicable. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 3 of 9 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ❑Not Applicable [FR2]1 303.1.3 U-factors of fenestration products" ❑Complies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or taken from the default table. ❑Not Observable ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met. [FR2311 installed per manufacturer's ❑Does Not instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC [Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies Requirement will be met. [FR16]z sealed at housing/interior finish ❑Does Not and labeled to indicate <_2.0 cfm leakage at 75 Pa. ['Not Observable ❑Not Applicable 403.2.1 Supply and return ducts in attics ❑Complies Requirement will be met. [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= R-6 where< 3 inches.Supply and [Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies Requirement will be met. [FR15]3 ducts or plenums. ❑Does Not ['Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R- R- ❑Complies Requirement will be met. [FR17J2 above 105°F or chilled fluids ❑Does Not below 55°F are insulated to>_R- _; [Not Observable 3. ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies Requirement will be met. [FR24]1 piping. ElDoes Not ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies Requirement will be met. [FR18]2 >_R 3. ❑Does Not ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies Requirement will be met. [FR19)2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 4 of 9 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 5 of 9 Section Plans Verified Field Verified Insulation Inspection Value Value Complies? Comments/Assumptions &Req.ID, 303.1 All installed insulation is labeled ❑Complies Requirement will be met. [IN13]2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [INi]1 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per ,❑Complies Requirement will be met. 402.2.7 manufacturer's instructions and ❑Does Not [IN2]1 in substantial contact with the underside of the subfloor, or floor ❑Not Observable framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing,or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a; R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least l of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). ❑ Steel ID Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. ❑Does Not ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 6 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ['Not Observable 402.2.E ❑Not Applicable PPlicable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ElDoes Not [FI2]1 Blown insulation marked every 300 ft2. ['Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. [FI22]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. [Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [FI3]i insulation >_R-value of the ElDoes Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50= ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2,and ElDoes Not <=3 ach in Climate Zones 3-8. [Not Observable ❑Not Applicable 402.4.2 Wood-burning fireplaces have ElComplies [FI812 tight fitting flue dampers and ❑Does Not outdoor air for combustion. [Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not handlers are located within <=3 cfm/100 ft2 without air ['Not Observable conditioned space. handler @ 25 Pa. For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ElComplies Exception:All ducts and air [FI27]1 determine air leakage with ft2 ft2 ElDoes Not handlers are located within either: Rough-in test:Total ['Not Observable conditioned space. leakage measured with a pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ElComplies Requirement will be met. [FI24]1 by manufacturer at<=2%of ElDoes Not design air flow. ❑Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies Requirement will be met. [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to Not Observable code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ElComplies Exception: Requirement is [Fi10]2 on heat pumps. ElDoes Not not applicable. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 7 of 9 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 403.5.1 Circulating service hot water ❑Complies Requirement will be met. [FI11]2 systems have automatic or ❑Does Not accessible manual controls. ['Not Observable ❑Not Applicable 403.6.1 All mechanical ventilation system! ❑Complies Requirement will be met. [F125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits. Not Observable ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies Exception: Requirement is [FI26]2 through one-or two-pipe heating ❑Does Not not applicable. systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies Requirement will be met. [FI28]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ['Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [FI29)2 comply with IEEE 515.1 or UL '❑Does Not not applicable. 515.Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies Requirement will be met. [F130]2 have recirculation pumps that ElDoes Not pump water from a heated water supply pipe back to the heated Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. 403.5.4 Drain water heat recovery units ❑Complies Requirement will be met. [F13112 tested in accordance with CSA ['Does Not B55.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units< 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies Requirement will be met. [F16]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Does not apply to low-voltage ['Not Observable lighting. ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\Fj\Arch Design\Bardin\Bardin Project.rck Page 8 of 9 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.lD 404.1.1 Fuel gas lighting systems have ❑Complies Requirement will be met. [FI23]3 no continuous pilot light. ❑Does Not ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [Fl7]2 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies Requirement will be met. [FI18]3 mechanical and water heating ❑Does Not systems have been provided. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bardin Project Report date: 06/06/18 Data filename: C:\FJ\Arch Design\Bardin\Bardin Project.rck Page 9 of 9 a i20 IE CI Efficie15ncyCC Energy Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 21.00 Floor 30.00 Ceiling/ Roof 49.00 Ductwork(unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.26 Door 0.26 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments