Loading...
blower door test-WERK Envelope Leakage Test Testing Company:Technician: Name:—LoCascio Energy Solutions Name:Anthony LoCascio Address:20 Ogden Rd.Credentials:HERS Ratert#4242961 Queensbury ,NEW YORK 12804 Phone:5188573144 Email tony@locascioenergysolutions.com Building Information:Customer Information: Project ID:40 Sunny Name:PJ Callahan Address:40 Sunnyside East Rd Address:40 Sunnyside East Rd Queensbury,NY 12804 Queensbury,NY 12804 Geo-Tag Data:Latitude:43.374911 Longitude:-73.625989 Timestamp:2019-12-04 15:24:21 Measured Leakage:986.3 CFM50 40 Sunny RESNET Multi-Pt Env.Leakage Effective Leakage Area:50.5 in? Building Volume:30,540.0 f°Enclosure Surface Area:3,408.0 fFlowCoefficient(C):69.5 (+/-11.2%)Exponent (n):0.678 (+/-0.032) Correlation Coefficient:0.99967 Test Standard:RESNET 380 Multi-Point Test Mode:Depressurize Test Characteristics:Indoor Temp:66 °F Outdoor Temp:35 °F Altitude:391.0 ft Time Average Period:10 seconds Test Date and Time:2019-12-04 15:24:55 2000 ||2 Depressurize — =§é a 2 4 5 678910 20 30 40 50 6070 Building Pressure (Pa) Envelope Leakage Test (Page 2) Test Readings: ‘Target (Pa)Bldg (Pa)Adj Bldg (Pa)Fan (Pa)Flow (cfm)Config Baseline 24 -60.0 61.5 -59.5 ~40.8 1,159.0 Ring A -48.0 49.3 473 -30.7 1,008.6 Ring A -35.0 -35.9 -33.8 186.2 808.5 Ring B -23.0 -25.7 23.7 115.4 636.9 Ring B -10.0 13.6 11.6 41.2 383.0 Ring B Test Equipment: Flow Device:Model 3 110V Fan Serial #:3172 Pressure Gauge:DG1000 Serial #:3172 Calibration Date:2019-02-18 Deviations from Standard: *None Comments: Report generated by TEC Auto Test version 1.6.3 (2),©2019 by The Energy Conservatory,Inc.