BINS-001390-2019 03122019INSPECTION WORKSHEET (BINS-001390-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0585-2018 Case Module:Permit
Inspection Date:Tue Mar 12, 2019 Inspection Status:Partial Pass
Inspector:Mark Smith Inspection Type:Building Insulation
Job Address:Parcel Number:27 CARLTON DR
Queensbury, NY 12804
296.17-1-28
Contact Type Company Name Name
Applicant Williams, Nicole
Granted Permission Williams, Nicole
Primary Owner Williams, Thomas
Contractor Williams, Thomas
Primary Owner Williams, Nicole
Checklist Item Passed Comments
Building Inspector Notes NO 11/20/18 Insulation Partial Approval - Floor only R30
2/25/19 Insulation Partial Approval - Ceiling Only
- Spray Foam Partial Approval - Provide R Value from
Installer.
- Fiberglas Insulation needs to be removed to verify air
sealing has been done.
- Remove fiberglass insulation from around perimeter of
exterior windows and door. Window and door spray foam
required fiberglass insulation is no longer approved.
- Once the Air Sealing is approved the fiberglass insulation
can be reinstalled but it must be tight. There were many gaps
from what was installed. The front wall above the window
must be one solid pieces cut to fit each space not cut up
pieces. Plus there were gaps at top and bottom plates and
around electrical boxes.
3/12/19 insulation approved provide documentation starting
R value of ceiling insulation.
Mar 12, 2019 Page (1)
INSPECTION WORKSHEET (BINS-001390-2019)
Checklist Item Passed Comments
U Factors = .3 cfm for windows, .5 cfm for doors YES .30
Tyvek or Similar Exterior Sealant YES Zip system at new windows, existing siding at the rest of the
building
Proper Vent, Attic Vent NO
Insulation Residential Check Commercial Check NO 11/20/18 Insulation Partial Approval - Floor only R30
2/25/19 Insulation Partial Approval - Ceiling Only
- Spray Foam Partial Approval - Provide R Value from
Installer.
- Fiberglas Insulation needs to be removed to verify air
sealing has been done.
- Remove fiberglass insulation from around perimeter of
exterior windows and door. Window and door spray foam
required fiberglass insulation is no longer approved.
- Once the Air Sealing is approved the fiberglass insulation
can be reinstalled but it must be tight. There were many gaps
from what was installed. The front wall above the window
must be one solid pieces cut to fit each space not cut up
pieces. Plus there were gaps at top and bottom plates and
around electrical boxes.
Blower Door Test NO
Combustion Air Supply for Furnace NO
Fresh air supply 3' from grade NO
Duct Insulation - if required in unheated spaces NO
Door / Window Sealed (No Insulation)NO
Tub Shower R-20 with Vapor Barrier NO
Air Barrier behind Knee Walls NO
Mar 12, 2019 Page (2)
INSPECTION WORKSHEET (BINS-001390-2019)
Checklist Item Passed Comments
All Ductwork Sealed Return and Supply NO
Duct Blaster Test for duct work, R-8 NO
All Return Air Hard Duct Work NO
House Wrap Taped at all Seams NO
Mar 12, 2019 Page (3)
Smith, Mark (Inspector)