BINS-001259-2019 03042019INSPECTION WORKSHEET (BINS-001259-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0585-2018 Case Module:Permit
Inspection Date:Mon Mar 4, 2019 Inspection Status:Passed
Inspector:John O'Brien Inspection Type:Building Framing
Job Address:Parcel Number:27 CARLTON DR
Queensbury, NY 12804
296.17-1-28
Contact Type Company Name Name
Applicant Williams, Nicole
Primary Owner Williams, Nicole
Granted Permission Williams, Nicole
Primary Owner Williams, Thomas
Contractor Williams, Thomas
Checklist Item Passed Comments
Mar 04, 2019 Page (1)
INSPECTION WORKSHEET (BINS-001259-2019)
Checklist Item Passed Comments
Building Inspector Notes YES 10/24/18 Preliminary Framing Inspection Not Approved
- Discussed the following items with the homeowner Mr.
Williams.
1) Anchor the Floor System ledger boards with concrete
expansion anchors as discussed along with pressure treated
blocking under the ledger to existing concrete floor.
For additional bearing.
2) Add collar ties to existing 2"x4" rafters
3) Fur out all exterior walls to accept R21 insulation
4) Complete Framing at front window including concrete
anchors. Replace existing exterior sheathing at this location
as discussed.
5) Once the items listed above are complete call for a
framing recheck.
11/19/18 Framing Partial Approval - Floor only!
2/25/19 Framing Partial Approval
Remaining Items:
- Air Sealing all gaps in existing outside walls. Will need to
verify so you will need to take fiberglass insulation out to
verify. Not all of it but in a location in each exterior wall.
3/4/19 Air Sealing Approved-Ok to reinstall insulation and
Poly vapor barrier the call for recheck of insulation for
Wednesday morning if ready.
Framing YES 10/24/18 Preliminary Framing Inspection Not Approved
- Discussed the following items with the homeowner Mr.
Williams.
1) Anchor the Floor System ledger boards with concrete
expansion anchors as discussed along with pressure treated
blocking under the ledger to existing concrete floor.
For additional bearing.
2) Add collar ties to existing 2"x4" rafters
3) Fur out all exterior walls to accept R21 insulation
4) Complete Framing at front window including concrete
anchors. Replace existing exterior sheathing at this location
as discussed.
5) Once the items listed above are complete call for a
framing recheck.
11/19/18 Framing Partial Approval - Floor only!
2/25/19 Framing Partial Approval
Remaining Items:
- Air Sealing all gaps in existing outside walls. Will need to
verify so you will need to take fiberglass insulation out to
verify. Not all of it but in a location in each exterior wall.
Mar 04, 2019 Page (2)
INSPECTION WORKSHEET (BINS-001259-2019)
Checklist Item Passed Comments
Bracing Bridging YES 11/19/18 Framing Partial Approval - Floor only!
Joist hangers YES 11/19/18 Framing Partial Approval - Floor only!
Soffits-Insulation Baffel YES Hot Roof