BINS-001145-2019 02252019INSPECTION WORKSHEET (BINS-001145-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0585-2018 Case Module:Permit Inspection Date:Mon Feb 25, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:27 CARLTON DR Queensbury, NY 12804 296.17-1-28 Contact Type Company Name Name Applicant Williams, Nicole Primary Owner Williams, Nicole Granted Permission Williams, Nicole Primary Owner Williams, Thomas Contractor Williams, Thomas Checklist Item Passed Comments Building Inspector Notes NO 10/24/18 Preliminary Framing Inspection Not Approved - Discussed the following items with the homeowner Mr. Williams. 1) Anchor the Floor System ledger boards with concrete expansion anchors as discussed along with pressure treated blocking under the ledger to existing concrete floor. For additional bearing. 2) Add collar ties to existing 2"x4" rafters 3) Fur out all exterior walls to accept R21 insulation 4) Complete Framing at front window including concrete anchors. Replace existing exterior sheathing at this location as discussed. 5) Once the items listed above are complete call for a framing recheck. 11/19/18 Framing Partial Approval - Floor only! 2/25/19 Framing Partial Approval Remaining Items: Feb 25, 2019 Page (1) INSPECTION WORKSHEET (BINS-001145-2019) Checklist Item Passed Comments - Air Sealing all gaps in existing outside walls. Will need to verify so you will need to take fiberglass insulation out to verify. Not all of it but in a location in each exterior wall. Framing YES 10/24/18 Preliminary Framing Inspection Not Approved - Discussed the following items with the homeowner Mr. Williams. 1) Anchor the Floor System ledger boards with concrete expansion anchors as discussed along with pressure treated blocking under the ledger to existing concrete floor. For additional bearing. 2) Add collar ties to existing 2"x4" rafters 3) Fur out all exterior walls to accept R21 insulation 4) Complete Framing at front window including concrete anchors. Replace existing exterior sheathing at this location as discussed. 5) Once the items listed above are complete call for a framing recheck. 11/19/18 Framing Partial Approval - Floor only! 2/25/19 Framing Partial Approval Remaining Items: - Air Sealing all gaps in existing outside walls. Will need to verify so you will need to take fiberglass insulation out to verify. Not all of it but in a location in each exterior wall. Bracing Bridging YES 11/19/18 Framing Partial Approval - Floor only! Air Seal all Plates and Sills NO Air Sealing all Joints Before Insulation NO Joist hangers YES 11/19/18 Framing Partial Approval - Floor only! Soffits-Insulation Baffel YES Hot Roof Feb 25, 2019 Page (2) O'Brien, John (Inspector)