Loading...
BINS-001147-2019 02252019INSPECTION WORKSHEET (BINS-001147-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0585-2018 Case Module:Permit Inspection Date:Mon Feb 25, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:27 CARLTON DR Queensbury, NY 12804 296.17-1-28 Contact Type Company Name Name Applicant Williams, Nicole Primary Owner Williams, Thomas Contractor Williams, Thomas Granted Permission Williams, Nicole Primary Owner Williams, Nicole Checklist Item Passed Comments Building Inspector Notes NO 11/20/18 Insulation Partial Approval - Floor only R30 2/25/19 Insulation Partial Approval - Ceiling Only - Spray Foam Partial Approval - Provide R Value from Installer. - Fiberglas Insulation needs to be removed to verify air sealing has been done. - Remove fiberglass insulation from around perimeter of exterior windows and door. Window and door spray foam required fiberglass insulation is no longer approved. - Once the Air Sealing is approved the fiberglass insulation can be reinstalled but it must be tight. There were many gaps from what was installed. The front wall above the window must be one solid pieces cut to fit each space not cut up pieces. Plus there were gaps at top and bottom plates and around electrical boxes. Window Sealing NO Feb 25, 2019 Page (1) INSPECTION WORKSHEET (BINS-001147-2019) Checklist Item Passed Comments U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 11/20/18 Insulation Partial Approval - Floor only R30 2/25/19 Insulation Partial Approval - Ceiling Only - Spray Foam Partial Approval - Provide R Value from Installer. - Fiberglas Insulation needs to be removed to verify air sealing has been done. - Remove fiberglass insulation from around perimeter of exterior windows and door. Window and door spray foam required fiberglass insulation is no longer approved. - Once the Air Sealing is approved the fiberglass insulation can be reinstalled but it must be tight. There were many gaps from what was installed. The front wall above the window must be one solid pieces cut to fit each space not cut up pieces. Plus there were gaps at top and bottom plates and around electrical boxes. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Air Barrier behind Knee Walls NO Tub Shower R-20 with Vapor Barrier NO Feb 25, 2019 Page (2) INSPECTION WORKSHEET (BINS-001147-2019) Checklist Item Passed Comments All Ductwork Sealed Return and Supply NO Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Feb 25, 2019 Page (3) O'Brien, John (Inspector)