BINS-007019-2019 10302019INSPECTION WORKSHEET (BINS-007019-2019)
CC-0282-2019Permit Management
Case Number:Case Module:
10/30/2019Failed
Inspection Date:Inspection Status:
John O'BrienCommercial Final Inspection
Inspector:Inspection Type:
296.19-1-42
Job Address:Parcel Number:
79 Glenwood Ave
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantBBL Construction Services
ArchitectHCP Architects, LLP
ContractorBBL Construction Services
Granted PermissionAddiction Care Center of AlbanyAshley Bowery
Primary OwnerAddiction Care Center of AlbanyAshley Bowery
Checklist ItemPassedComments
Low flow toilet 1.3 gal/flushing cycleTrue
Handicapped RampsTrue
Building Inspector NotesTrue
10/30/19 Final Inspection Not Approved
Recheck at 2:00pm
Bldg Access All Sides 20ft Drivable SurfaceTrue
Public Toilet Room Handicapped AccessibleTrue
Hydraulic Elevators: Oil Seperator REQUIREDTrue
Int/Ext Balusters 4 inch Spacing Platform DecksTrue
Bldg Num or Tenant Address on Bld or DriveTrue
Attic Access Insulation = Attic R- ValueTrue
Gas Shut-off Exposed & Regulator (18) Above GradeTrue
Water Fountain or CoolerTrue
Public Sewer Sign-OffTrue
Handicapped Service Counters 34 inchTrue
Gas Furnace Shut OffTrue
Int/Ext Guardrails 42 inch Platform DecksTrue
Hydraulic Elevators: Non-comb. Plumbing REQUIREDTrue
Engineer or Architect ApprovalTrue
Chimney Rain Cap InstalledFalse
OK to Issue C/OFalse
Chimney / B Vent / Direct Vent LocationFalse
HVAC Vent Terminal 10' from Lot Line & OpeningsTrue
Attic Access GasketedTrue
Universal Symbol of Access displayedTrue
Final Electrical / Flex Gas Piping BondedTrue
Plumbing Vent Through Roof/Roof completeTrue
Relief Valve ,Heat Trap/Water Temp 110 deg or lessTrue
Special InspectionsTrue
H/C Toilets: flush handle on open side of bathroomTrue
Attic Access 30 x 20 x 30 (h)True
December 23, 2019Page 1 of 2
INSPECTION WORKSHEET (BINS-007019-2019)
Checklist ItemPassedComments
OK to Issue Temporary C/OFalse
Occupancy sensor lighting controlFalse- Install occupancy sensor in multipurpose room.
Handicapped UnitsTrue
Handicapped Bath/Parking Lot SignageTrue
HRV or ERV Installed per Bedroom RequirementsTrue
Stair rail 34 in – 38 in Step Risers 7 Treads 11TrueExisting stairs
Doors 36 inch wLever Hand Panic Hardware, if reqTrue
Site Plan Variance requiredTrue
Elevator Operation and Signage Shaft SealedTrue
Exits At Grade Or Platform 36 (w) x 44 (l)True
Floor Bathroom Watertight Other Floors OkayTrue
H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsFalseTrap wrap missing on one sink.
Ext Finish /Grade Complete/6 in 10ft or EquivalentTrue
Outside Spigots have Air GapTrue
December 23, 2019Page 2 of 2