Loading...
ComCheck COMcheck Software r n 4.1.1.0 Envelope Compliance Certificate Project Information Energy Code: 90.1 (2013) Standard Project Title: Childtime Learning Center Location: Glens Falls, New York Climate Zone: 6a Project Type: Alteration Vertical Glazing/Wall Area: 39% Construction Site: Owner/Agent: Designer/Contractor: 6 Willowbrook Road Ed Cox Kurt Schmitz Queensbury, NY 12804 Learning Care Group ADA Architects, Inc. 21333 Haggerty Road 17710 Detroit Avenue Suite 100 Lakewood,OH 44107 Novi, MI 48375 216-521-5134 267-897-0886 jcora@adaarchitects.cc ecox@learningcaregroup.com Building Area Floor Area 1-School/University :Nonresidential 8881 Envelope Assemblies R-Value Proposed Max.Allowed Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC NORTH North Wall:Concrete Block:8",Partially Grouted,Cells Empty,Normal Density,Furring:Wood,[Bldg.Use 1 - School/University],Exemption:No cavity will be created. Door 1:Glass(>50%glazing):Nonmetal Frame,Non-Entrance --- 0.310 0.280 0.320 0.400 Door,Clear,Non-Entrance Door,Non-Entrance Door,[Bldg.Use 1 -School/University] SOUTH Exterior Wall 2:Concrete Block:8",Partially Grouted,Cells Empty,Normal Density,Furring:Wood,[Bldg.Use 1 - School/University],Exemption:No cavity will be created. Door 1:Glass(>50%glazing):Nonmetal Frame,Non-Entrance --- --- 0.310 0.280 0.320 0.400 Door,Clear,Non-Entrance Door,Non-Entrance Door,[Bldg.Use 1 -School/University] (a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. X Envelope Compliance Statement Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 90.1 (2013)Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 1 of 11 .,":411r:41-<2x-risk-M 1-'7,7'— 77''l-1 fri- (4 p/..'t k-i,d..?‘ „Q --5/gin Name-Title Signature Date Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 2 of 11 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 90.1 (2013) Standard Requirements: 36.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. ectlon Plan Review ow Com l s? Corninerts/ ssum ens 6cReqi1.1 4.2.2, Plans and/or specifications provide all ❑Complies Requirement will be met. 5.4.3.1.1, `information with which compliance ❑Does Not 5.7 ca be determined for the building [PR1]i ennvelope and document where ['Not Observable exceptions to the standard are ❑Not Applicable claimed. Plans,specifications, and/or ❑Complies 8.4.1.1, 'calculations provide all information ❑Does Not 8.4.1.2 with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6]2 ;and equipment and document where ❑Not Applicable exceptions are claimed. Feeder ;connectors sized in accordance with !approved plans and branch circuits sized for maximum drop of 3%. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 3 of 11 t g d Ou dataPlans llerrf i F ktl erifiee[ C ?iI1 1, , nsppFpFm Names ' *04 o ' 'a te' 5 54a Below-grade wall insulation R- R- R- ❑Complies See the Envelope Assemblies eofi 3 s;value. ❑Does Not table for values. \; ;❑Not Observable ❑Not Applicable 5.5,3.5 ` Slab edge insulation R-value. R- : R- '❑Complies :See the Envelope Assemblies [FO3J2 ❑ Unheated ❑ Unheated ;❑Does Not '.table for values. ❑ Heated ❑ Heated ❑Not Observable °❑Not Applicable 5.5.3.5- 4 Slab edge insulation ft ft ❑Complies :See the Envelope Assemblies [F05]2 3depth/length. ❑Does Not `.table for values. 0 ;❑Not Observable 1 ;❑Not Applicable @ _ `ems \ 5 5.8.1.7 Exterior insulation protected \\� 1=- Complies [FO6] !against damage,sunlight, 3-" u N ❑Does Not moisture,wind, landscaping and `i k-4,4 \� fib, ❑Not Observable :equipment maintenance rr�� v� , `�'� z. \ . y�, ❑Not Applicable activities. "�� �,r ,„ , 5.8.1.7.3 'Insulation in contact with the " S ` �\ � , . ! ;;- ❑Complies [FO7]1 ground has <=0.3%waters / r% ❑Does Not ;absorption rate per ASTM C272. ;:4 " «-zz, ❑Not Observable ,. i ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) '2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 4 of 11 5eCt2011 a Y s e w 4� /: sp ,,, .,x .� /5 ?., %�� a/ r �: ou Xt ctrort; Pl.ans'Ver•r#red Preld er fed x 'Cc'm}9#res? _C'W,M,ernt'CAssur�7rptrons,`; 4Sr,ktegl4 r ,,�i4`1 �' ,,�` ies x. R -.ntwil ben.;..et t ten : ' 5.4.3.2 i Factory-built and site-assembled �� , ❑Complies Requirement will be met. [FR1I3 , Ifenestration and doors areill / ❑Does Not labeled or certified as meeting air „ le:14 \ ❑Not observable leakage requirements. �� �< k,,4r ❑Not Applicable • 5.4.3.4 Vestibules are installed where y /r 't y ❑Complies Exception: Requirement [FR4]3 }building entrances separate r ❑Does Not does not apply. conditioned space from the !exterior, W, ❑Not Observable ;exterior,and meet exterior s--; �y 4 «❑Not A licable envelope requirements. Doors ��' PP have self-closing devices,and are `�� >=7ftapart(>= 16ftapartfor adjoinging floor area >=40000 � �Nktil s 4 "' wie AA sq.ft.).Vestibule floor area <=7 it 50 sq.ft. or 2 percent of the �� adjoining conditioned floor area. .:. ,,, ,,�, f `.; • 5.5.4.3a Vertical; fenestration U-Factor. U U Complies See the Envelope Assemblies [FR8]1 Does Not 'table for values. ❑Not Observable ❑Not Applicable 5.5.4.3b •;Skylight fenestration U Factor. U U ❑Complies See the Envelope Assemblies [FR9]' ❑Does Not table for values. ❑Not Observable ❑Not Applicable • 5.5.4.4.1 ;Vertical fenestration SHGC value. : SHGC: SHGC: ❑Complies 'See the Envelope Assemblies [FR10]i ❑Does Not :table for values. flNot Observable ❑Not Applicable 5.5.4.4.2 Skylight SHGC value. SHGC: ' SHGC: ;❑Complies See the Envelope Assemblies [FR11]1 ❑Does Not table for values. :❑Not Observable ❑Not Applicable 5.8.2.1, Fenestration products rated (U- 4� � `` �We�4A£ ❑Complies Requirement will be met. 5.8.2.3 factor, SHGC, and VT)in ❑Does Not 5.8:2:4 ;accordance with NFRC or energy h / ❑Not Observable 5 ;code defaults are used. % � s , ❑Not Applicable z i of e 4; a 5.8.2.21 :.Fenestration and door products Q y \\\ . ❑Complies Requirement will be met. [FR13] are labeled,or a signed and y�� , , z ❑Does Not dated certificate listing the U- yam > z i [Mot Observable ;factor, SHGC,VT,and air leakage �`; w i y ` rate has been provided by the �° e , vi,' �� ❑Not Applicable manufacturer. �No v 5.5.3.E „;U-factor of opaque doors U- U ❑Complies See the Envelope Assemblies [FRI412 sassociated with the building ❑ Swinging Swinging ❑Does Not table for values. thermal envelope meets ❑ Nonswinging ❑ Nonswinging ❑Not Observable • t,requirements. ❑Not Applicable v V' `a ,ter ,, 'g 5.4.3.1 ;Continuous air barrier is ''t ` OComplies Exception: Requirement [FR15]1 wrapped,sealed,caulked, ❑Does Not does not apply. gasketed,and/or taped in an ,' 6` -a :approved manner,exce t in z � � ❑Not Observable PP P �' � `❑Not Applicable semiheated spaces in climate zones 1-6. �� Additional Comments/Assumptions: 1 High Impact(Tier 1) 2. Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 5 of 11 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 6 of 11 Section Rough 1n Electrical [nspect[on_ Compleies? Comments/ sustmptl bb s & i I is ��' 8.4.2 ` At least 50%of all 125 volt 15-and ❑Complies [EL10)2 ;20-Amp receptacles are controlled by ❑Does Not an automatic control device. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 7 of 11 5et o :. *� 0% I?'lans tert red Reif Aterifiec>i l iniiil do lettfti i; ' ,, Compiles?:� ' ildl'lrYC�Egs1,�a Ili lid . , @ ,u,,i i aipe i,: tom value :: ' N ,,, 3 i�� M� 5.5.3.1 :Roof R-value. For some ceiling : R- R- .❑Complies See the Envelope Assemblies [IN2]1 ;systems,verification may need to-IIIAbove deck ❑ Above deck ❑Does Not table for values. occur during Framing Inspection. '❑ Metal E❑ Metal ;❑Not Observable ' ❑ Attic ;❑ Attic :❑Not Applicable f : : 5.5.3.2 ;Above-grade wall insulation R- R- R- '❑Complies .See the Envelope Assemblies [IN6]1 value. ❑ Mass ;❑ Mass •❑Does Not table for values. ❑ Metal ;❑ Metal ;❑Not Observable ❑ Steel -❑ Steel ❑Not Applicable • ❑ Wood ;❑ Wood 5.8.1.2 :Above-grade wall insulation ❑Complies 9 [IN7]1 :installed per manufacturer's ,,Vli f ❑Does Not ;instructions. l• =�, �: " �>_<;i1;;^�R3�❑Not Observable `' far; :'"`> ", ,' ru: ❑Not Applicable a 53A Floor insulation R-value. R- R- ❑Complies :See the Envelope Assemblies }� �43 *' Mass Mass ❑Does Not :table for values. to `\ vv a ❑ ❑ .,,,s ❑ Steel ❑ Steel ❑Not Observable . igAnf' IllWood ❑ Wood ❑Not Applicable 15.8.L1.: ;;Building envelope insulation is ;_;t%! M't„'" I-. ❑Complies jlt,41O1 3labeled with R-value or insulation " / :r ❑Does Not certificate has been provided y„n " -- ❑Not Observable 'listing R-value and other relevant ` `'`'`�` '" 3 g � "�����;].-���s;;, ��� � AR Applicable • data. , G <:, k ,: a .AR 5 8 I,`99 Building envelope insulation ry " LiComplies [IN18] =extends over the full area of the ' e T \\ dflNot [IDoes Not component at the proposed rated l-!" ` :E,; :�\ z:= ''', ;. : V.;� Observable ❑Not Applicable y ice X/ �� ❑Com lies 5 8 1 4 i�'Eaves are baffled to deflect air to �% p [{I0 z j above the insulation. ig4e","'``" '.`°'', , "❑Does Not } ? s: : `'< : ' :❑Not Observable % S , .a1 x, ti ❑Not Applicable 5$ I S °' Insulation is installed in __,„,,„,„:„ n " , ti I� ,:.❑Complies [IN123 ,;substantial contact with the = r ,* �� ;N ".❑Does Not • inside surface separating ii / � ;conditioned space from �� �aR innk ""Na' ❑Not Observable �,,,,.. " , ❑Not Applicable :unconditional space. PY:�;.�� �,��,,,���"�* �,;.�\;; $8 16 Recessed equipment installed in ;rI ,4- ' 3 zv;1�\ ❑Complies [IN13] ` >=building envelope assemblies F `% r� p ❑Does Not i does not compress the adjacent R `�z - = �4 � �� ����� " `°�'� ❑Not Observable :a insulation. �� ;V AIlli ;, a ❑Not Applicable 5.8.1 7.1"'Attics and mechanical rooms WraVOIN#4P V, °=/ ,, ❑Complies • s ' ,•;, XST,1:* Does Not[IN15] :have insulation protected where � �° ^� ;,;�„, "=,`'r::�❑ • ;adjacent to attic or equipment , ��� '*i' �,�., , .a, ❑Not Observable access. cV o � ; ,. ❑Not Applicable 5,8.1.7.2 :Foundation vents do not interfere �.�: T;-z,,, ,❑Complies [IN16] with insulation. I . -I ' z �. �E '❑Does Not N.'" , '' •❑Not Observable> `FT ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) ,2 IMedium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 8 of 11 1 High Impact(Tier 1) 2 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 9 of 11 Section Final lcn pec i �rxn lies CommentslAssumpbaons Req.ID 5.4.3.3 ;Weatherseals installed on all loading DComplies Exception: Requirement does not apply. [FI1]i dock cargo doors in Climate Zones 4- ElDoes Not 8. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Childtime Learning Center Report date: 05/03/19 Data filename: M:\Learning Care Group\19168 Queensbury, NY\19168 LCG Queensbury NY ComCheck.cck Page 10 of 11