BINS-001518-2019 03202019INSPECTION WORKSHEET (BINS-001518-2019)
RC-0530-2018Permit Management
Case Number:Case Module:
03/20/2019Partial Pass
Inspection Date:Inspection Status:
Charles DyerBuilding Insulation
Inspector:Inspection Type:
289.10-1-36
Job Address:Parcel Number:
15 Genista Ln
Lake George, NY 12845
Contact TypeCompany NameName
ApplicantDanny Williams
ArchitectDanny Williams
ContractorDaniel Barber
Granted PermissionDaniel Barber
Primary OwnerDavid Judkins
Dawn Judkins
Checklist ItemPassedComments
Building Inspector NotesFalseInspection for start of air baffles, not ready 3/19/19
U Factors = .3 cfm for windows, .5 cfm for doorsTrue
Tub Shower R-20 with Vapor BarrierFalse
All Return Air Hard Duct WorkTrue
House Wrap Taped at all SeamsFalse
Door / Window Sealed (No Insulation)True
All Ductwork Sealed Return and SupplyTrue
Air Barrier behind Knee WallsFalse
Blower Door TestFalse
Duct Insulation - if required in unheated spacesFalse
Tyvek or Similar Exterior SealantTrueZip system
Combustion Air Supply for FurnaceFalse
Fresh air supply 3' from gradeFalse
Window SealingTrue
Duct Blaster Test for duct work, R-8False
Proper Vent, Attic VentTrue
Insulation Residential Check Commercial CheckFalse
Partial insulation only 3/20/19 @ ceiling area over main living area
R-38
January 17, 2020Page 1 of 1