Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
inspection slips
Residential Final Inspection Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Rd.,Queensbury,NY 12804 ‘NAME:WenLOCATION: a Bee,ae TYPE OF STRUCTURE: Date Inspection request received:4 Arrive: Inspector's Initials: Chimney Hi,/"B”Vent/Direct Vent Location (Fresh Air Intake 3 inch Plumb Vent through roof ‘Roof Complete Guard 30 in.or more @ stairs,decks,patios Guard at stairwell at 34 in.or more ‘Guard at deck,porches 36 in.or more Exterior Finish Complete Interiow/Exterior Railings 34 in.to 38 in, Platform at all exterior doors Interior Handrails stairs 2 or more risers Grade away from foundation 6 in.with 10 f. Handrail Termination at Newell Post or Wall8inchclearancetosillplate Gas Valve shut-off exposed /regulator 18”above grade (Gas Fumace shut-off within 30 ft.or within line of site (Oil Furnace shut-off at entrance to furnace area Fumace/Hot Water Heater operating ‘Low water shut-off boiler Relief Valve(s)installed Interior privacy//trim/doors /main entrance 36 in. ‘Bathroom /Kitchen watertight Safety glazing ‘Window in stairwells safety glazing Interior Smoke Detectors: Every level:1 Every Bedroom: ‘Outside every bedroom area: Inter Connected:1 Battery backup: Bathroom Fans,if'no window ‘Carbon Monoxide detector ‘Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 sf “Emergency egress below grade ‘Basement stairs closed rise >4 inches %hour fire door /door closer[Garage fireproofing ‘Duct work Sealed proj Attic access 30 in.x24 Building No./Address visible from road Final Electrical Site Plan /Variance required Final Survey Plot Plan. ‘As Built Septic System /Sewer Dept.Inspection Sticker Flood Plain Certification,ifrequired ‘Okay to issue C /C (Cert.Of Compliance) ‘Okay to issue Temporary C/O (Cert.OF Occupancy)zh Okay to issue Permanent C/O (Cert.Of Occupancy) am i fL4 PERMIT #: DATE: Comments Cen Dea Toe —OK, TL'Svellemingway\Building.Coves Inspection FORMS\Res.Final Insp.forin [doe edited January 28,£003 ?‘Town of Queensbury Fire Marshal 742 Bay Road Queensbury,NY 12804 "761-8205 |761-8206 fax 745-4437 Facto iit Gas ib n. Notice:New York State requires that all UL Listed,factory built appliances be installed according to the instructions and specifications contained in the Installation Manual accompanying the appliance.No deviation from the manufacturer's instructions or specifications is allowed. Permit #_Q2-4%Senet inpecton 7/5 [Of ‘Time,am pm anytime warsNameWEDAYattraMWcenLavereApplianceManufacturerMoilel Direct Vent___Factory Built Chimney Flue Size__Double Wall_Triple Wall_Tnsulated_eS Yes|No|NA ‘Comments Floor Protection Clearances to Combustibles (all sides) Firestop(s)Vertical Chase ‘Wall Penetration. Vent Clearances to ‘Combustibles Vent /Chimney Termination ‘Chimney height must be 3 feet above roof penetration;2 feet above any combustible construction within 10 feet Gas Shut-Off Valve V ‘Combustion Air Hearth Extension (if any) Mantel g Height above fp opening Witness Operation Vv Tank Placement (if LP) ‘White ~Baliaing Dept Yellow}Cantemer ink Fire Marshal Residential Final Inspection Office No.(518)761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive:am)part:3 ZOinim >?,742 Bay R.,Queensbury,NY 12804 Inspector'sInitial ™ NAME: z Werder PERMIT #:03-O7T73LOCATION:ca es Le DATE:5 =S=04TYPEOFSTRUCTURE:S<&>Comments Fresh Air Intake 3 inch Plumb Vent through roof Roof Complete is 7 Guard 30 in.or more @ stairs,decks,patios Y Guard at stairwell at 34 in.or more v, v v7, x Chimney Ht,/"B”VentiDirect Vent Location / Y v ‘Guard at deck,porches 36 in.or more Exterior Finish Complete Interior/Exterior Railings 34 in,to 38 in. Platform atall exterior doors Interior Handrails stairs 2 or more risers Grade away from foundation6in.with 10 f. Handrail Termination at Newell Post or Wall8inchclearancetosillplate7 Gas Valve shut-off exposed /regulator 18”above grade |, Gas Furnace shut-off within 30 ft.or within line of site|_V | ‘Oil Furnace shut-off at entrance to furnace area Fumnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed 4Interiorprivacy/trim/doors /main entrance 36 in.xy Bathroom/Kitchen watertight Vv, Safety glazing wv ‘Window in stairwells safety glazing See,Tnterior Smoke Detectors: Every level:1.Every Bedroom:yh M LiveeewiePeed Inter Connected 1 Battery backup Ae Bathroom Fans,if ne window 7 , ‘Carbon Monoxide detector Z ] Plumbing fixtures eyFoundationinelaon Jf Cone Ad Mec DED Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade 7Basementstairsclosedrise>4 inches Yhour fire door /door closer 4A UweGaragefireproofing SisPin,[Vaceaee Cates 3 Ci|eed Vee iwce Fiew-BEF Final Survey Plot Plan vw.Meeps ArReVAC— ‘As Built Septic System /Sewer Dept.Inspection Sticker Flood Plain Certification,if required ‘Okay to issue C/C (Cert.Of Compliance)BS‘Okay to issue Temporary C/O (Cert.Of Occupancy) ‘Okay to issue Permanent C/O (Cert.Of Occupancy)_|v TE3SueHemingway Burlding Codes Inspection FORMS\Res.Final In.form doo edled Tanvary 28,2003 Residential Final Inspection Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Rd.,Queensbury,NY 12804 ‘NAME:Dinan)Mion, ——UESe AAasTYPEOFSTRUCTURE: Date Inspection request received:Depart:Arrive: Inspector's Initial am/pm, PERMIT #: DATE: Zs NA Chimney Ht,/"B”Vent/Direct Vent Location Fresh Air Intake 3 inch Plumb Vent through roo ‘Roof Complete Guard 30 in,or more @ stairs,decks,patios Guard at stairwell at 34 in,or more ‘Guard at deck,porches 36 in,or more Exterior Finish Complete Interior/Exterior Railings 34 in,to 38 in,|Platform at all exterior doors Interior Handrails stairs 2 or more risers Grade away from foundation 6 in,with 10 ft Handrail Termination at Newell Post or Wall 8 inch clearance to sill plate Gas Valve shut-off exposed /regulator 18”above grade Gas Furnace shut-off within 30 fl.or within Tine of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed Interior privacy /trim/doors /main entrance 36in, Bathroom/Kitchen watertight Safety glazing ‘Window in stairwells safety glazing Interior Smoke Detectors: Byery level:1 Every Bedroom: Outside every bedroom area: Inter Connected:i Battery backup: Bathroom Fans,ifno window Carbon Monoxide detector Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade ‘Basement stairs closed rise >4inches %hour fire door /door closer Garage fireproofing Duct work Sealed proper) Aitic access 30 in.x26 in,x30m.Gt)In accessible area ‘Crawl Spaces 18”x 24”access,1 sq.f.-150 sq.f.vents Bujlding No./Address visible from road Ploal Electrical ‘Site Plan /Variance required V|Final Survey Plot Plan ‘As Built Septic System /Sewer Dept.Inspection Sticker Flood Plain Certification,ifrequired Okay to issue C/C (Cert.Of Compliance) Okay to issue Temporary C/O (Cert.Of Occupancy) ‘Okay to issue Permanent C/O (Cert.Of Occupancy) T:iSveHemingwaylBuilding Codes Inspection FORMS\Res,Final np.form 2doe edited January 28,2003 037 Comments am/pm. 2 Phone (518)761-8205 Town of Queensbury Fire Marshal's Office Queensbury,NY 12804 742 Bay Road Fax (518)745-4437 Fire Marshal's Inspection Report Request Received:pees Permit #, Nish cron1Chas cate 2Name: Location: ‘SCHEDULE INSPECTION ON:4-04LDCau)Pu ANYTIME d APPROVEDTNA[ves ‘NO. ~~COMMENTS Exits AISLE WIDTHS EXIT SIGNS ~NORMAL =BATTERY EMERGENCY LIGHTING FIRE EXTINGUISHERS Fu ‘SYSTEM IRE SPRINKLER SYSTEM ‘SUPPRESSION SYST! HOOD INSTALLATION 1 FINISHES =‘STORAGE COMPRESSED GAS ‘CLEARANCE TO SPRINKLERS: ‘CLEARANCE TO HEATING UNITS [CLEARANCETOELECTRICAL— REQUIRED SIGNAGE Winee SL 70TR-C EMERGENCY PLAN MAXIMUM OCCUPANCY SIGN HIMNEY MASONRY ROUGH IN at ou S544 FINAL CHIMNEY FACTORY BUILT __ROUGHIN FINAL, Aucnok Uuit 2 4ive Tabs __ROUGH IN One PR Reeneck ___FINAL FIREPLACE ee JOKTHISDATE ©, OKFORCO (_NOTeeaFINAL V|Facronrs Vv ORY BUILT __ROUGH IN INSPECTED BY _zinat.|aoe COMDEV/CHRISJWORD/LETTERS200 1/FIREMARSHALINSPECTIONREPORT 11022004 WHITE -BUILDING DEPARTMENT GOPY ‘YELLOW ~OCCUPANT COPY Framing /Firestopping Inspection Report Office No.(518)761-8256 Date Inspection request received:pes Queensbury Building &Code Enforcement Arrive:amiga)Sp LLLom742BayRoad,Queensbury,NY 12804 Inspector's Initials: NAME:We\>mAan rae OS ae LOCATION:__CctA Lye.RD =INSPECT ON:BeetTYPEOFSTRUCTURE: Y[N [NA Framing COMMENTS Tack Studs /Headers Bracing /Bridging Joist hangers Jack Posts /Main Beams Exterior sheeting nailed properly 12"0.C. Headroom 6 ft.8 in. Stairwells 36 iHeadroom6fi.8 Notches /Holes /Bearing Walls ‘Metal Strapping for Notches Top Plate 1 ¥(w)16 gauge (8)16D naits each side Draft stopping 1,000 sq.fi.floor trusses ‘Anchor Bolts 6 ft.or less on center Tee and snow shield 24 inches from wall Fire separation 1,2,3 hour|pare wall 2,3,4 hour nv Firestopping =e |V ]Coupeegé 2 Gye wee Penetration sealed 16 inch insulation in cavity min, Garage Fire Separation House side %inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space /Bedrooms 24 in.(H) 20 in.(W) 5.1 sf above /below grade5.0sfgrade LASuetfemingway\Building Codes.nspection,FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Fi Framing /Firestopping Inspection Report Date Inspection request received:t “Arrive:jepart:_©|Yimipm Inspector's Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Road,Queensbury,NY 12804 NAME:We ut, LOCATION:—_TYPE OF STRUCTURE:__ Framing N LNA-N|NA!Jack Studs /Headers Bracing /Bridging Joist hangers Jack Posts /Main Beams |Exterior sheeting nailed properly |,se2hO.e: |Headroom6ft.8 in. Stairwells 36 in.or more Headroom 6 ft.8 in. ‘Notches /Holes /Bearing Walls ‘Metal Strapping for Notches Top Plate 1%(w)16 gauge (8)16D nas each side ‘Draft stopping 1,000 sq.ft.floor trusses ‘Anchor Bolts 6 ft.or less on center Toe and snow shield 24 inches from wall Fire separation 1,2,3 hour Eye wall 2,3,hour restopping | Penetration sealed 16 inch insulation in cavity min, Garage Fire Separation House side 4 inch or 5/8 inch ‘Type X Garage side 5/8 inch Type X Ceiling/wall ‘Windows Habitable Space /Bedrooms 24 in.(H) 20 in.(W) 5.1 sf above/below grade 5.0 sf grade PERMIT #:63-093 INSPECT ON:6/4(04 COMMENTS LASueHemingway\Building Codes.Inspection.FORMS\Framing Firestopping tnspection Report.doe January 28,2003 ¥ Septic Inspection Report a 0 Arr) Office No.(518)761-8256 Date Inspection |received: Queensbury Building &Code Enforcement Arrive:lepart:742 Bay Ra.,Quey NY 12804 Inspector'sInitialia NAME: LOCATION: RECHECK:SX Comments and/or diagram Soil Type{Sgrd’/Loam /Clay—p Type of Water:Municipal (Well Wate” Waterline separation distanc ‘Well separation distance LO ZeasO Other wells: ‘Absorption Field:Total length Length of each trench _Depth of trenches Zz Size of Stone eZ x =|p|p|> p> Piping Sigg ye Building to tank ‘Tank to Distribution Box rsDistributionBoxtofield/Pit | Opening Sealed/Y /)N/Partial | ‘Location /Separations ‘Foundation to tank fi.Foundation to absorption |e ft. Separation of Pits i asConformsasperPlotPlanVYAN bobmABas Location of System on Property:Ze7E-A ee Bu eT Front Left Side Right Side Middle Front Middle Rear System Use Status Approved Partial Approved and needs to be re-inspected,please call the Building &Codes Office Disapproved L'SveHemingway'Building Codes.Inspection FORMS Septic Inspection Report.doc January 28,2003, Framing /Firestopping Inspection Report Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Road,Queensbury,NY 12804 NAME: LOCATION: TYPE OF STRUCTURE: Vannad Date Inspection request received:ingen «ZO PERMIT #: INSPECT ON:iG V|Framing COMMENTS Tack St@ds /Headers fracing /Bridging Tost hangers Jack Posts /Main Beams Exterior sheeting nailed properly 12°0.C, Headroom 6 fl.8 in. Stairwells 36 in.or more Headroom 6 fi.8 in. Notches/Holes /Bearing Walls Metal Strapping for Notches Top Plate 1%(w)16 gauge (8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses ‘Anchor Bolts 6 ft.or less on center Tee and snow shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side 4 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space /Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above /below grade 5.0 sf grade ‘LSuelFemingway/Building Codes.Inspection.FORMS\Framing Fitestopping Inspection Report.doc January 28,2003, eaPe.Rough Plumbing /Insulation Inspection Report Office No.(518)761-8256 Date Inspection request received:9.4 2-3/6. Queensbury Building &Code Enforcement Arrive:Pt depart: 742 Bay Road,Queensbury,NY 12804 Inspector’sInitials: PERMIT #;o2203-0 INSPECT ON:_ie?DJ,NA PVC:R-1,R-2,R-3,R-4 Drain /Vents Cast Iron r Drain /Vent /Comm.ye ents in Place Vv mbing /Nail Plates 1%inch min.Drain Size ‘Washing Machine Drain 2 inch min, Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes ‘Cleanout every 100 feet /change of direction Water Supply Piping Cooper Commercial Cooper,CPVC,Pex One and Two-Family jesidential Check /Commercial Check v 6 EILING K 4,0 roper Vent,Attic Vent Duct /Hot Water Piping InsulationIfrequiredunheatedspaces ‘Combustion Air Supply for Furnacearoperly/No duct tapeCue Aneg|V| COMMENTS: FRA mio ComPeCre BR peta we L’SueHemingwvay\Building Codes spection,FORMS\Rough Plumbing Insulation Report.doe November 17,2003, Ze ws Han Rough Plumbing /Insulation Toy Report Office No.(518)761-8256 Date Inspection requi ved;~lot Queensbury Building &Code Enforcement Arrive:Départ: 742 Bay Road,Queensbury,NY 12804 In NAME:P.bVidar ERMIT #:2003-073 LOCATION:INSPECT ON:__2/90/04 TYPE OF STRUC’ N__[NA <PVC:R-l,R-2,R3,R-4 Drain /Vents Cast Iron,Co rain /Vent /Comm. jumbing Vent /in Place)‘Rough Plumbing /Nail Plates LST nee ae1%inch min.Drain Size ee‘Washing Machi LL.COPRECTINaeaTest ». &a Omee.WS BreneatandVents°5 PSI or 10 feet above highest v SCH Ver XQ connection for 15 misCleanoutevery100feet/change of direction Water Supply Piping Cooper Commercial ZLCooper,CPVC,Pex One and Two-FamilyaInsulation/Residential Check /Commercial Check Sal a Yatra Proper Vent,Attic Vent oeDuct/Hot Water Piping Insulation Pot oo CauIfrequiredunheatedspacescolMESCombustionAirSupplyforFurnace: Duct work sealed properly /No duct WSOUATEN COMMENTS: |LSueHemingway\Building Codes Inspection.FORMS\Rough Plumbing Insulation Report doe November 17,2003, sage Foundation Inspection Report Office No.(518)761-8256 Date Inspection request received:9/17 /y Queensbury Building &Code Enforcement Arrive:am)part:pm 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: NAME:PERMIT #: LOCATION:INSPECT ON: ‘TYPE OF STRUCTURE: ment io Mofolithic Slab Reinforcement in Place ‘The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. ‘Materials for this purpose on site. Foundation /Walipour Reinforcement in Place Foundation Dampproofing Foundation /Waterproofing Type of Dampproofing /Waterproofing Footing Drain Daylight or Sump Footing Drain Stone:| 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Siab PVC/Cast/Copper Foundation Insulation Interior /Exterior R- Rough Grade 6 inch drop within 10 f.| {LSuetlemingway'Building.Codes Inspection FORMS\Foundation Inspection Report.doc January 28,2003 Rough Plumbing /Insulation Inspection Report Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Road,Queensbury,NY 12804 NAME: LOCATION: TYPE OF STRUCTURE: Arrive: Inspector'sInitials:Ce wap Date Inspection see peesatpxm(©Sienna PERMIT #:INSPECT ON:23 OTDGl]o> NA PVC:R-1,R-2,R-3,R-4 Drain/Vents Coprectio es —Of Cast Iron,Copper Drain /Vent /Comm..Plumbing Vent /Vents in Place ‘Rough Plumbing /Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft.above highest Connection for 15 minutes er Supply Piping Copper Commercial Copper,CPVC,Pex One &Two Family 7 Commercial Check 2 wrcs Proper Vent,Attic Vent Duct /Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Fumace Duct Work Sealed Properly f quae ee.lustauc S70b (©,CuasAreeNextToSpowerk L'SuelTemingway\Building Codes.inspection.FORMS\Rovgh Plumbing Insulation Report.doc January 28,2003, . ‘:awd Mns_ Rough Plumbing /Insulation Inspection Report Office No,(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Road,Queensbury,NY 12804 NAME: LOCATION:cS‘TYPE OF STRUCTURE:[aeeQhdpediswons JN NA PVC:R-1,R-2,R-3,RYDrain /Vents Re Cast Iron,Copper Dain 1 Vent /Comp. i’ Plumbing Vent /Venifin Place O $f1s‘Rough Plumbing /NAil Plates \ Head or Air Supply Test,7 Drain and Vent5PSIor10ft.abt est Connection for 15 miutes Water Supply Piping\eeCopperCommercial ‘Copper,CPVC,Pex One &Two Familyi[Ansulation /Residential heels Coromeraial Check Proper Vent,Attic Vent e psperVent,Attic Vent 3 ‘Duet /Hot Water Piping Insulation Ifrequired unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly COMMENTS: Boped rorPwwssare. R1D GROve EXD 1B Counsny « R=19 DAS WO Froog- Berewese PERMIT #Qe"INSPECT ON:_G7.(5-O. CaemnaLRigvomd SeaceWR FAA WD Boe Nor ComPLerE290FLooeBanal BEWOSD HOS aes as WeerCATS.7.3 {StsaeMusdGSTRSooPiVE— Garage €-\> wW oAUS LiSueHemingway/Building Codes.inspection FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Framing /Firestopping Inspection Report Qoo Pm Office No,(518)761-8256 Date Inspection request received:aeQueensburyBuilding&Code Enforcement Arrive:y Depart:imi 742 Bay Road,Queensbury,NY 12804 Inspector'sInitial LOCATION:INSPECT ON: TYRE OF STRUCTURE:|SENNAME:\Wey PERMIT #::-ie ODA r SS COMMENTS jack Studs Bracing /Bridging Joist hangers Jack Posts /Main Beams Exterior sheeting nailed properly /Headers |Creve Baivai we loqerJoWee Headroom6ft.8 in. Stairwells 36 in.or more Headroom 6 fi.8 in. Notches /Holes /Bearing Walls Y%a 12"0c.(re O-KEE HavoeR NeiueG \ x Metal Strapping for Notches Top Plate |1%(w)16 gauge (8)16D nails euch side_| Draft stopping 1,000 sq.ft.floor trusses _|\|| Anchor Bolts6ft.or less on center \ Ice and snow shield 24 inches from wall NY Fire separation 1,2,3 hour Tl fenetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side ¥3 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space /Bedrooms 24 in,(H) 20 in.(W) 5.7 sfabove /below grade 5.0 sf grade 1L\SueHemingway\Building Codes Inspection FORMS\Framing Fitestopping Inspection Report doc January 28,2003, / / Office No.(518)761-8256 Queensbury Building &Code Enforcement 742 Bay Road,Queensbury,NY 12804 oe eeLOCATION:\ Date Ingpection reqENT)ayf Inspector's Initiy Framing Tack Studs /Headers Bracing /Bridging Joist hangers |Jack Posts /Main Beams |Exterior sheeting nailed properly 12"0.C, Headroom6ft.8 in. Stairwells 36 in,or more Headroom6ft.8 in. Notches /Holes/Bearing Walls Metal Strapping for Notches Top Plate 1%(w)16 gauge (8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses ‘Anchor Bolts 6 fi.or less on center Tee and snow shield 24 inches from wall /Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %inch or 5/8 inch ‘Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space /Bedrooms 24 in.(H)/ 20 in.(W)/5.7 sf above /below grade 5.0 sf grade PERMIT #: INSPECT ON: COMMENTS [L)Suellemingway'Building.Codes.Inspection FORMS\Framing Firestopping Inspection Report doc January 28,2003 Foundation Inspection Report Office No,(518)761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive: 742 Bay Rd.,Queensbury,NY 12804 Inspector's NAME: LOCATION: TYPE OF STRI i ==Comments =a y TN [Na Footings Piers A Monolithic Siab Reinforeement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete.| ‘Materials for this purpose on site.| Foundation /Wallpour 1 Reinforcement in Place Foundation Dampproofing Foundation /Waterproofing [Type of Dampproofing /Waterproofing Footing Drain Daylight or Sump Footing Drain Stone:| 12 inch width 6 inches above footing6milpolyforwetareasunderslab UW [Backfill Approval e Vv Plumbing Under Stab PVC]Cast /Copper | Foundation Insulation Interior /Exterior i iR-| Rough Grade 6 inch drop within 10.|| |j LASueHemingway\Building Codes Inspection.FORMS\Foundation Inspection Report.do January 28,2003, 9-90 -7:30 Foundation Inspection Report Office No.(518)761-8256 Date Inspection request received:mepf.— Queensbury Building &Code Enforcement Arrive:am)Depart:famipm742BayRd.,Queensbury,NY 12804 __Inspector’s Initials: NAME:G rear,CD OO" LOCATION:INSPECT ON:_[O—/7Qo—TYPE OF STRI Comments eee Ly TN [NA Footings Piers Monolithic Siab Reinforcement in Place The contractor is responsible for providing protection from freezing | for 48 hours following the placement | |ofthe concrete Mteffals for this purpose on site,ne‘Eodidation /Wallpour vo Reinforcement in Place | Foundation Dampproofing Foundation /Waterproofing |Type of Dampproofing /Waterproofing |Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width6inchesabovefooting 6 mil poly for wet areas under slab Backfill Approval 3 Plumbing Under Stab PVC/Cast /Copper Foundation Insulation Interior /Exterior R- Rough Grade 6 inch drop within 10 f. LLASueHemingwayiBuilding,Codes.Inspection.FORMS\Foundation Inspection Report.dae January 28,2003, Foundation Inspection Report ola Office No.(518)761-8256 Date Inspection request received:(A Queensbury Building &Code Enforcement Arrive:am/pr Depary «PZamipm742BayRd.,Queensbury,NY 12804 Inspector's Initials:ey NAME:wW,i PERMIT#:O3—OVSLOCATION:e Ec en le.bo:INSPECT ON:__@/fo [07>TYPE OF STRUCTURE:ey Comments y [N [NA Footings Piers Reinforcement in Place ‘The contractor is responsible for providing protection from freezing/for 48 hours following the placement of the concrete. Materials for this purpose on site, |Foundation /Wallpour Reinforcement in Place Foundation Dampproofing Foundation /Waterproofing Type of Dampproofing /Waterproofing|Footing Drain Daylight or Sump [eae ] Footing Drain Stone: 12 inch width 6 inches above footing aasunderslab__| fill Approval E Plumbing Under Stab PVC/Cast /Copper |Foundation Insulation Interior /Exterior |eS | Rough Grade 6 inch drop within 10 | ease [eae] ‘L\SueHfemingway Building Codes Inspection.FORMS Foundation Inspection Report.doc January 28,2003, Va Wel?Foundation Inspection Report Office No.(518)761-8256 Date Inspection ie received: Queensbury Building &Code Enforcement Arrive:pmo Deva U:a742BayRd.,Queensbury,NY 12804 NAME:Qala seer PERMIT #: A ee oF=oCSLOCATION:INSPECT ON: ‘TYPE OF STRUCTURE:S55. Comments —= ¥N [NA hr (6 TCHS Piers ZL Reinforcement in Place Z—_cAcf v The contractor is responsibli providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose onsite, |Foundation /Wallpour Reinforcement in Place ||Foundation Dampproofing Foundation /Waterproofing Type of Dampproofing /Waterproofing |Footing Drain Daylight or Sump |Footing Drain Stone: |12 inch width Bfiohes sbave footing sib (sta fo Cesk“Approval SPlumbingUnderSlab G A® PVC/Cast /Copper Foundation Insulation Interior /Exterior R- [Rough Grade 6 inch drop within 10 ft. | *:\SueHemingway\Building.CosesInspection,FORMS\Foundation Inspection Report.doc January 28,2003, ‘Town of Queensbury Fire Marshal 742 Bay Road Queensbury,NY 12804 761-8205 /761-8206 fax 745-4437 Factory Bui i e ion Report Notice:New York State requires that all UL Listed,factory built appliances be installed according to the instructions and specifications contained in the Installation Manual accompanying the appliance.No deviation from the manufacturer's instructions or specifications is allowed. Permit#_O3~OFF schedule tnspection_“[25 Time.am pm anytime In POO Name_W)O\ODA.__Adtress_GeGad Ly Rd tatafinal__ Appliance Manufacturer ‘Mode!# Direct Vent___Factory Built Chimney ___Flue Size___Double Wall___Triple Wall_Insulated_ :Pi Yes/No|N/A Comments Floor Protection v Clearances to Combustibles (all sides) Firestop(s)Vertical Chase ANCHOR Gor OK.Wall Penetration. Vent Clearances to Combustibles Vent /Chimney Termination ‘Chimney height must be 3 feet above roof penetration;2 feet above any combustible construction within 10 feet Gas Shut-Off Vaive ‘Combustion Air Hearth Extension (if any) Mantel Height above fip opening Witness Operation Tank Placement (if LP) ‘White Batlaing Dept.FYettow|Pink —Fire Marshal