BINS-001668-2019 03282019INSPECTION WORKSHEET (BINS-001668-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000362-2015 Case Module:Permit
Inspection Date:Thu Mar 28, 2019 Inspection Status:Partial Pass
Inspector:John O'Brien Inspection Type:Building Insulation
Job Address:Parcel Number:3-23 Wedgewood DR Bldg. 1
Queensbury, NY 12804
302.9-1-28.1
Contact Type Company Name Name
Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Primary Owner SCHERMERHORN WEDGEWOOD
LLC
Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Granted Permission Schermerhorn Properties
Architect Rucinski-Hall Architecture
Checklist Item Passed Comments
Building Inspector Notes NO 3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
Window Sealing NO
U Factors = .3 cfm for windows, .5 cfm for doors NO
Mar 28, 2019 Page (1)
INSPECTION WORKSHEET (BINS-001668-2019)
Checklist Item Passed Comments
Tyvek or Similar Exterior Sealant NO
Proper Vent, Attic Vent NO
Insulation Residential Check Commercial Check NO 3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
Blower Door Test NO
Combustion Air Supply for Furnace NO
Fresh air supply 3' from grade NO
Duct Insulation - if required in unheated spaces NO
Door / Window Sealed (No Insulation)NO
Tub Shower R-20 with Vapor Barrier NO
Air Barrier behind Knee Walls NO
All Ductwork Sealed Return and Supply NO
Duct Blaster Test for duct work, R-8 NO
Mar 28, 2019 Page (2)
INSPECTION WORKSHEET (BINS-001668-2019)
Checklist Item Passed Comments
All Return Air Hard Duct Work NO
House Wrap Taped at all Seams NO
Mar 28, 2019 Page (3)
O'Brien, John (Inspector)