Loading...
BINS-001668-2019 03282019INSPECTION WORKSHEET (BINS-001668-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2015 Case Module:Permit Inspection Date:Thu Mar 28, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:3-23 Wedgewood DR Bldg. 1 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN Primary Owner SCHERMERHORN WEDGEWOOD LLC Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN Granted Permission Schermerhorn Properties Architect Rucinski-Hall Architecture Checklist Item Passed Comments Building Inspector Notes NO 3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Mar 28, 2019 Page (1) INSPECTION WORKSHEET (BINS-001668-2019) Checklist Item Passed Comments Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Tub Shower R-20 with Vapor Barrier NO Air Barrier behind Knee Walls NO All Ductwork Sealed Return and Supply NO Duct Blaster Test for duct work, R-8 NO Mar 28, 2019 Page (2) INSPECTION WORKSHEET (BINS-001668-2019) Checklist Item Passed Comments All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 28, 2019 Page (3) O'Brien, John (Inspector)