Wedgewood Apts concrete test report 114 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Fax: (518) 399-1913
CLIENT: REPORT NUMBER: : PAGE #: 1
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
1 :
PLACEMENT LOCATION OF LOAD # 2 :
PLACEMENT LOCATION OF LOAD # 3 :
1 2 0 3
4563 / 819904 4585 / 819905 4565 / 819906
11.00 / 11.00 #11.00 / 22.00 1 11.00 / 33.00 1.833
12.21 / 12.42 0 ##12.25 / 12.40 0 12.50 / 1.10 0
12.45 / 12.54 # 12 12.55 / 1.15 ##1.15 / 1.50 2.00
MAX: 1.50 )12 0.55 0 12 0.83 0 12 1.00 0
0.21 5.50 # 0.25 5.00 1 0.50 5.50 1
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.50
0.00 0.00 0.00
PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )5.50 1 5.00 0 5.50 1
ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 6.00 0 0.00 0 0.00 0361300
UNIT WEIGHT (PCF) (SPEC:-0.00 ) 136.85 0 0.00 0 0.00 0
- 90 ) 80 0 81 0 81 0
NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0
174195 - 174200 0 0 0 0 0 0
1:
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.174195 06/22/17 7 2480 X
COARSE AGGREGATE #2: LBS.174196 06/22/17 7 2370 X
COARSE AGGREGATE #3: LBS.174197 07/13/17 28 3670 0
FINE AGGREGATE: LBS.174198 07/13/17 28 3530 0
ADMIXTURE #1: OZS.174199 07/13/17 28 3620 0
ADMIXTURE #2: OZS.174200 01/00/00 SPARE 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
Tom Joslin Tom Joslin Tom Joslin Tom Joslin
APPLIED LOAD
11
06/15/17
1162.009
174195
70's: CLEAR
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DARREN VanDeWARKER
SCHEMERHORN CONSTRUCTION, INC.
536 BAY ROAD, SUITE 2
QUEENSBURY, NEW YORK 12804
WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY.
IF APPLICABLE:
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
CONCRETE TEMP. (F) (SPEC:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
LAB CYLINDER CONTROL NUMBERS:
WATER:
0
0
DESIGN STRENGTH & FORMULA:
3:
TIME CONC. BATCHED / ARRIVED:
31,100
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DISCREPANCIES & REMARKS:
0.0
4:
0.0
5:
6:
7:
8:
1: FILE
2: SUPPLIER 0
0
0
44,350
29,750
0
0
46,100
45,450
0
0
0
0
0
0
0
0.0
0
0
0
0
JOINTA-GALUSHA, LLC
CONTRACTOR NOTIFIED: LOAD 1,3: SLUMP
ULTIMATE
06/16/17
4.00
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
3000
BUILDING #6: FOOTING: SOUTH WALL, WEST HALF; WEST W ALL, SOUTH HALF
BUILDING #6: FOOTING: WEST WALL, NORTH HALF; NORTH WALL, WEST HALF
PLACEMENT LOCATION OF LOAD #
BUILDING #6: FOOTING: NORTH WALL, EAST HALF; EAST WALL, NORTH HALF
0.00
45
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
4 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Fax: (518) 399-1913
CLIENT: REPORT NUMBER: : PAGE #: 2
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
4 :
0 0 0
0 0 0
4 0 0 0
4904 / 819907 0 0 0 0 0 0
11.00 / 44.00 2 0.00 0 0.00 0 0.00 0 0.00 0
1.04 / 1.21 0 ## 0.00 0 0.00 0 0.00 0 0.00 0
1.51 / 2.10 # 0 0.00 0 0.00 ## 0.00 0 0.00 0.00
MAX: 1.50 )1 1.10 0 0 0.00 0 0 0.00 0
0.04 5.50 2 0.00 0.00 0 0.00 0.00 0
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00
0.00 0.00 0.00
PLACEMENT SLUMP (INCH) (SPEC: - 5.00 )5.50 1 0.00 0 0.00 0
ENTRAINED AIR ( % VOL) (SPEC: - 7.00 )0.00 0 0.00 0 0.00 0361300
UNIT WEIGHT (PCF) (SPEC:-0.00 ) 136.85 0 0.00 0 0.00 0
- 90 ) 82 0 0 0 0 0
NUMBER OF TEST SPECIMEN CAST:0 0 0 0 0
0 0 0 0 0 0 0 0
1:
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.0 01/00/00 0 0 X
COARSE AGGREGATE #2: LBS.0 01/00/00 0 0 X
COARSE AGGREGATE #3: LBS.0 01/00/00 0 0 X
FINE AGGREGATE: LBS.0 01/00/00 0 0 X
ADMIXTURE #1: OZS.0 01/00/00 0 0 X
ADMIXTURE #2: OZS.0 01/00/00 0 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
BUILDING #6: FOOTING: EAST WALL, SOUTH HALF; SOUTH WALL, EAST HALF
0
PLACEMENT LOCATION OF LOAD #
0
0.00
45
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
3000
0
JOINTA-GALUSHA, LLC
CONTRACTOR NOTIFIED: LOAD 4: SLUMP
ULTIMATE
06/16/17
4.00
0
0.0
0
0
0
0
0
0
0
0
0
0
0
8:
1: FILE
2: SUPPLIER
0
0
0
0
0
0
0
DISCREPANCIES & REMARKS:
0.0
4:
0.0
5:
6:
7:
0
0
DESIGN STRENGTH & FORMULA:
3:
TIME CONC. BATCHED / ARRIVED:
0
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
LAB CYLINDER CONTROL NUMBERS:
WATER:
CONCRETE TEMP. (F) (SPEC:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
IF APPLICABLE:
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DARREN VanDeWARKER
SCHEMERHORN CONSTRUCTION, INC.
536 BAY ROAD, SUITE 2
QUEENSBURY, NEW YORK 12804
WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY.
Tom Joslin Tom Joslin Tom Joslin Tom Joslin
APPLIED LOAD
11
06/15/17
1162.009
0
70's: CLEAR