Wedgewood Apts concrete test report 74 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Fax: (518) 399-1913
CLIENT: REPORT NUMBER: : PAGE #: 1
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
1 :
PLACEMENT LOCATION OF LOAD # 2 :
PLACEMENT LOCATION OF LOAD # 3 :
1 2 0 3
4587 / 819532 4560 / 819533 4903 / 819534
10.00 / 10.00 2 10.00 / 20.00 2 10.00 / 30.00 2.4
1.15 / 1.30 0 ##1.20 / 1.35 0 1.40 / 2.00 0
1.34 / 1.49 # 1 1.50 / 2.13 ##2.15 / 2.24 2.00
MAX: 1.50 )1 0.57 0 1 0.88 0 1 0.73 0
0.15 4.00 1 0.20 4.50 2 0.40 4.25 2
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.24
0.00 0.00 0.00
PLACEMENT SLUMP (INCH) (SPEC: - 5.00 ) 4.00 0 4.50 0 4.25 0
ENTRAINED AIR ( % VOL) (SPEC: - 7.00 ) 5.60 0 0.00 0 0.00 0374600
UNIT WEIGHT (PCF) (SPEC:-0.00 ) 141.88 0 0.00 0 0.00 0
- 90 ) 72 0 72 0 72 0
NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0
173787 - 173792 0 0 0 0 0 0
0
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.173787 06/07/17 7 2790 X
COARSE AGGREGATE #2: LBS.173788 06/07/17 7 2680 X
COARSE AGGREGATE #3: LBS.173789 06/28/17 28 3620 0
FINE AGGREGATE: LBS.173790 06/28/17 28 3720 0
ADMIXTURE #1: OZS.173791 06/28/17 28 3500 0
ADMIXTURE #2: OZS.173792 01/00/00 SPARE 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
Tom Joslin Tom Joslin Tom Joslin Tom Joslin
APPLIED LOAD
7
05/31/17
1162.009
173787
60's: CLEAR
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DARREN VanDeWARKER
SCHEMERHORN CONSTRUCTION, INC.
536 BAY ROAD, SUITE 2
QUEENSBURY, NEW YORK 12804
WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY.
IF APPLICABLE:
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
CONCRETE TEMP. (F) (SPEC:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
LAB CYLINDER CONTROL NUMBERS:
WATER:
0
0
DESIGN STRENGTH & FORMULA:
3:
TIME CONC. BATCHED / ARRIVED:
35,100
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DISCREPANCIES & REMARKS:
0.0
4:
0.0
5:
6:
7:
8:
1: FILE
2: SUPPLIER 0
0
0
46,700
33,650
0
0
45,450
44,000
0
0
0
0
0
0
0
0.0
0
0
0
0
JOINTA-GALUSHA, LLC
0
ULTIMATE
06/01/17
4.00
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
3000
BUILDING #3: FOOTING: WEST WALL, NORTH HALF
BUILDING #3: FOOTING: NORTH WALL
PLACEMENT LOCATION OF LOAD #
BUILDING #3: FOOTING: EAST WALL, NORTH HALF
0.00
45
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
4 William Street, Ballston Lake, New York 12019
Phone: (518) 399-1848 Fax: (518) 399-1913
CLIENT: REPORT NUMBER: : PAGE #: 2
INSPECTION DATE:
OUR FILE NUMBER:5
INSPECTOR & TEST SET: DAVE CASAW #5
ATT'N: AMBIENT WEATHER:
OUR FILE LOCATION:
4 :
PLACEMENT LOCATION OF LOAD # 5 :
0 0 0
4 5 0 0
4584 / 819535 4905 / 819536 0 0 0
10.00 / 40.00 3 10.00 / 50.00 3 0.00 0 0.00 0
2.10 / 2.25 0 ##2.40 / 3.04 0 0.00 0 0.00 0
2.30 / 2.52 # 3 3.10 / 3.21 ## 0.00 0 0.00 0.00
MAX: 1.50 )2 0.70 0 2 0.68 0 0 0.00 0
0.10 4.50 2 0.40 5.00 3 0.00 0.00 0
WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0
WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00
0.00 0.00 0.00
PLACEMENT SLUMP (INCH) (SPEC: - 5.00 ) 4.50 0 5.00 0 0.00 0
ENTRAINED AIR ( % VOL) (SPEC: - 7.00 )0.00 0 5.60 0 0.00 0037300
UNIT WEIGHT (PCF) (SPEC:-0.00 )0.00 0 141.28 0 0.00 0
- 90 ) 73 0 73 0 0 0
NUMBER OF TEST SPECIMEN CAST:0 0 6 0 0
0 0 173793 - 173798 0 0 0
0
CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39
P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED:
CEMENT:LBS.CYLINDER TEST UNIT
CEMENT:LBS. NUMBER DATE P.S.I.
GAL.
COARSE AGGREGATE #1: LBS.173793 06/07/17 7 2420 X
COARSE AGGREGATE #2: LBS.173794 06/07/17 7 2310 X
COARSE AGGREGATE #3: LBS.173795 06/28/17 28 3200 0
FINE AGGREGATE: LBS.173796 06/28/17 28 3150 0
ADMIXTURE #1: OZS.173797 06/28/17 28 3300 0
ADMIXTURE #2: OZS.173798 01/00/00 SPARE 0 X
ADMIXTURE #3: OZS.
AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
0 0 0 01/00/00 0 0 X
RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X
CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X
0 0 0 0 01/00/00 0 0 X
TOM JOSLIN, S.E.T. (NICET)0 0 0 0 01/00/00 0 0 X
MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X
PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE.
PER DRAWING: S-202, DETAIL: 5
GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS.
PLACEMENT AREA REINFORCEMENT:
PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW.
CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED.
PLACEMENT WEATHER PROTECTION:
BUILDING #3: FOOTING: EAST WALL, SOUTH HALF; SOUTH WALL, EAST HALF
BUILDING #3: FOOTING: SOUTH WALL, WEST HALF; WEST W ALL, SOUTH HALF
PLACEMENT LOCATION OF LOAD #
0
0.00
45
C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S
0.00
TEST AGE
3000
0
JOINTA-GALUSHA, LLC
0
ULTIMATE
06/01/17
4.00
0
0.0
0
0
0
0
39,600
0
0
0
0
0
0
8:
1: FILE
2: SUPPLIER
29,000
0
0
40,250
41,450
0
0
DISCREPANCIES & REMARKS:
0.0
4:
0.0
5:
6:
7:
0
0
DESIGN STRENGTH & FORMULA:
3:
TIME CONC. BATCHED / ARRIVED:
30,450
DAYS
UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064
DELIVERED LOAD NUMBER:
TRUCK NUMBER / TICKET NUMBER:
YARDAGE DELIVERED / SUBTOTAL:
LAB CYLINDER CONTROL NUMBERS:
WATER:
CONCRETE TEMP. (F) (SPEC:
SLUMP OF CONCRETE INTO PUMP:
TIME PLACEMENT BEGAN / ENDED:
CONCRETE AGE ( HOURS ) (SPEC:
SLUMP ON ARRIVAL (INCHES):
IF APPLICABLE:
PROJECT:
CONSTRUCTION TECHNOLOGY
MR. DARREN VanDeWARKER
SCHEMERHORN CONSTRUCTION, INC.
536 BAY ROAD, SUITE 2
QUEENSBURY, NEW YORK 12804
WEDGEWOOD APARTMENTS: BURKE DRIVE, QUEENSBURY, NY.
Tom Joslin Tom Joslin Tom Joslin Tom Joslin
APPLIED LOAD
7
05/31/17
1162.009
173793
60's: CLEAR