Loading...
BINS-003810-2019 06242019INSPECTION WORKSHEET (BINS-003810-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2016 Case Module:Permit Inspection Date:Mon Jun 24, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:8, 10, 14, 16, 20, 22, 26, 28 Wedgewood DR Bldg. 2 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Applicant Schermerhorn R.E. Holdings DARREN VANDERWARKER Primary Owner SCHERMERHORN WEDGEWOOD LLC Contractor Schermerhorn R.E. Holdings DARREN VANDERWARKER Architect Rucinski-Hall Architecture Granted Permission Schermerhorn R.E. Holdings DARREN VANDERWARKER Checklist Item Status Jun 24, 2019 Page (1) INSPECTION WORKSHEET (BINS-003810-2019) Checklist Item Status Building Inspector Notes Failed 3/21/19 Sound Batt Insulation Partial Approval. - First Floor Hall Ceiling at end units. 3/22/19 Sound Board Partial Approval - First Floor Hall Ceiling at end units. 4/11/19 Insulation Partial Approval - Ok to sheetrock lids in first floor apartment foyers. Insulation at in exterior wall and box area verified. 5/14/19 proper vent verified 6/12/19 Insulation Partial Approval - South Half of Building #2 - Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing - Ceiling R38 - Garage Ceiling R19 - Garage Exterior Walls R11 - Perimeter of windows and doors foamed 6/18/19 Sound Board on apartment common walls south half of building. 6/20/19 Insulation Partial Approval - Balance of Building #2 - Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing - Ceiling R38 - Garage Ceiling R19 - Garage Exterior Walls R11 - Perimeter of windows and doors foamed 6/24/19 Insulation Partial Approval- North Half - Balance of sound board Proper Vent, Attic Vent Passed 5/14/19 proper vent verified Insulation Residential Check Commercial Check Failed 3/21/19 Sound Batt Insulation Partial Approval. - First Floor Hall Ceiling at end units. 3/22/19 Sound Board Partial Approval - First Floor Hall Ceiling at end units. 4/11/19 Insulation Partial Approval - Ok to sheetrock lids in first floor apartment foyers. Insulation at in exterior wall and box area verified. 6/12/19 Insulation Partial Approval - South Half of Building #2 6/18/19 Sound Board on apartment common walls south half of building. 6/20/19 Insulation Partial Approval - Balance of Building #2 - Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing - Ceiling R38 - Garage Ceiling R19 - Garage Exterior Walls R11 - Perimeter of windows and doors foamed 6/24/19 Insulation Partial Approval- North Half Jun 24, 2019 Page (2) INSPECTION WORKSHEET (BINS-003810-2019) Checklist Item Status - Balance of sound board Blower Door Test Failed Door / Window Sealed (No Insulation)Passed - Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing - Ceiling R38 - Garage Ceiling R19 - Garage Exterior Walls R11 - Perimeter of windows and doors foamed Jun 24, 2019 Page (3) O'Brien, John