BINS-003810-2019 06242019INSPECTION WORKSHEET (BINS-003810-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000362-2016 Case Module:Permit
Inspection Date:Mon Jun 24, 2019 Inspection Status:Partial Pass
Inspector:John O'Brien Inspection Type:Building Insulation
Job Address:Parcel Number:8, 10, 14, 16, 20, 22, 26, 28 Wedgewood
DR Bldg. 2
Queensbury, NY 12804
302.9-1-28.1
Contact Type Company Name Name
Applicant Schermerhorn R.E. Holdings DARREN VANDERWARKER
Primary Owner SCHERMERHORN WEDGEWOOD
LLC
Contractor Schermerhorn R.E. Holdings DARREN VANDERWARKER
Architect Rucinski-Hall Architecture
Granted Permission Schermerhorn R.E. Holdings DARREN VANDERWARKER
Checklist Item Status
Jun 24, 2019 Page (1)
INSPECTION WORKSHEET (BINS-003810-2019)
Checklist Item Status
Building Inspector Notes Failed
3/21/19 Sound Batt Insulation Partial Approval.
- First Floor Hall Ceiling at end units.
3/22/19 Sound Board Partial Approval
- First Floor Hall Ceiling at end units.
4/11/19 Insulation Partial Approval
- Ok to sheetrock lids in first floor apartment foyers. Insulation at in exterior wall and box area verified.
5/14/19 proper vent verified
6/12/19 Insulation Partial Approval - South Half of Building #2
- Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing
- Ceiling R38
- Garage Ceiling R19
- Garage Exterior Walls R11
- Perimeter of windows and doors foamed
6/18/19 Sound Board on apartment common walls south half of building.
6/20/19 Insulation Partial Approval - Balance of Building #2
- Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing
- Ceiling R38
- Garage Ceiling R19
- Garage Exterior Walls R11
- Perimeter of windows and doors foamed
6/24/19 Insulation Partial Approval- North Half
- Balance of sound board
Proper Vent, Attic Vent Passed
5/14/19 proper vent verified
Insulation Residential Check Commercial Check Failed
3/21/19 Sound Batt Insulation Partial Approval.
- First Floor Hall Ceiling at end units.
3/22/19 Sound Board Partial Approval
- First Floor Hall Ceiling at end units.
4/11/19 Insulation Partial Approval
- Ok to sheetrock lids in first floor apartment foyers. Insulation at in exterior wall and box area verified.
6/12/19 Insulation Partial Approval - South Half of Building #2
6/18/19 Sound Board on apartment common walls south half of building.
6/20/19 Insulation Partial Approval - Balance of Building #2
- Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing
- Ceiling R38
- Garage Ceiling R19
- Garage Exterior Walls R11
- Perimeter of windows and doors foamed
6/24/19 Insulation Partial Approval- North Half
Jun 24, 2019 Page (2)
INSPECTION WORKSHEET (BINS-003810-2019)
Checklist Item Status
- Balance of sound board
Blower Door Test Failed
Door / Window Sealed (No Insulation)Passed
- Exterior Walls R21 Fiberglass & R3.6 Zip Sheathing
- Ceiling R38
- Garage Ceiling R19
- Garage Exterior Walls R11
- Perimeter of windows and doors foamed
Jun 24, 2019 Page (3)
O'Brien, John