Loading...
BINS-000940-2019 03132019INSPECTION WORKSHEET (BINS-000940-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2016 Case Module:Permit Inspection Date:Wed Feb 13, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:8, 10, 14, 16, 20, 22, 26, 28 Wedgewood DR Bldg. 2 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN Primary Owner SCHERMERHORN WEDGEWOOD LLC Architect Rucinski-Hall Architecture Granted Permission Schermerhorn R.E. Holdings VANDERWARKER, DARREN Checklist Item Passed Comments Building Inspector Notes NO 6/13/18 Ice & Water Shield Approved 1/15/19 Framing Partial Approval - Preliminary Framing - Please Provide a clearer plan showing hold down anchor locations for 1st & 2nd floor locations. It appears that some are missing. Ran into same problem on Bldg. #1 - Complete nailing all truss bracing at gable ends. Some areas missing nailing blocks and some are not nailed. -Provide Ethan Hall's Framing Inspection Report. Note: Darren I spoke with Ethan he is going to supply us a clearer hold down location layout for 1st & 2nd floor. 2/11/19 Preliminary Framing Partial Approval Remaining Items: - Provide Ethan Hall's Framing Inspection Report - Final Framing once trades are complete with work before insulation. Feb 13, 2019 Page (1) INSPECTION WORKSHEET (BINS-000940-2019) Checklist Item Passed Comments Framing NO 1/15/19 Framing Partial Approval - Preliminary Framing - Please Provide a clearer plan showing hold down anchor locations for 1st & 2nd floor locations. It appears that some are missing. Ran into same problem on Bldg. #1 - Complete nailing all truss bracing at gable ends. Some areas missing nailing blocks and some are not nailed. -Provide Ethan Hall's Framing Inspection Report. Note: Darren I spoke with Ethan he is going to supply us a clearer hold down location layout for 1st & 2nd floor. 2/11/19 Preliminary Framing Partial Approval Remaining Items: - Provide Ethan Hall's Framing Inspection Report - Final Framing once trades are complete with work before insulation. Bracing Bridging NO Air Seal All Registers at Floor NO Air Sealing all Joints Before Insulation NO Notches Holes Bearing Walls NO Metal Strapping for Notches Top Plate NO Ice and water shield 24 inches from wall YES 6/13/18 Ice & Water Shield Approved Design Professional Sign-off, if required NO Feb 13, 2019 Page (2) O'Brien, John (Inspector)