Loading...
BINS-002814-2019 05172019INSPECTION WORKSHEET (BINS-002814-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2015Case Module:Permit Inspection Date:Fri May 17, 2019Inspection Status:Partial Pass Inspector:Mark SmithInspection Type:Building Insulation Job Address:3-23 Wedgewood DR Bldg. 1Parcel Number:302.9-1-28.1 Queensbury, NY 12804 Contact TypeCompany NameName ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN Primary OwnerSCHERMERHORN WEDGEWOOD LLC ArchitectRucinski-Hall Architecture Granted PermissionSchermerhorn Properties Checklist ItemPassedComments May 17, 2019Page (1) INSPECTION WORKSHEET (BINS-002814-2019) Checklist ItemPassedComments Building Inspector NotesNO3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) 4/11/19 Insulation Partial Approval - Sound Insulation Installed in Upper portion of common walls in order to sheetrock backside of mechanical soffits. 4/23/19 proper vent approved for building #1 only. 5/14/19 insulation approved R 38 in ceiling R21 in walls Garage has R 19 in ceilings and R 11 in walls Ok to Sheetrock 5/17/19 1/2" sound deadening board on common walls and ceilings verified. Common wall have 2 layers of r 11 insulation. Common walls a garage have sound deadening board. U Factors = .3 cfm for windows, .5 cfm for doorsYES.31 Tyvek or Similar Exterior SealantYESZip system with foam 3.6 r value used at exterior walls Proper Vent, Attic VentYES4/23/19 building #1 approved for proper vent Insulation Residential Check Commercial CheckNO3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) May 17, 2019Page (2) INSPECTION WORKSHEET (BINS-002814-2019) Checklist ItemPassedComments 4/11/19 Insulation Partial Approval - Sound Insulation Installed in Upper portion of common walls in order to sheetrock backside of mechanical soffits. Blower Door TestNO Combustion Air Supply for FurnaceNO Fresh air supply 3' from gradeNO Duct Insulation - if required in unheated spacesNO Air Barrier behind Knee WallsNO All Ductwork Sealed Return and SupplyNO Duct Blaster Test for duct work, R-8NO All Return Air Hard Duct WorkNO House Wrap Taped at all SeamsNO Smith, Mark (Inspector) May 17, 2019Page (3)