BINS-002667-2019 05142019INSPECTION WORKSHEET (BINS-002667-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000362-2015Case Module:Permit
Inspection Date:Tue May 14, 2019Inspection Status:Partial Pass
Inspector:Mark SmithInspection Type:Building Insulation
Job Address:3-23 Wedgewood DR Bldg. 1Parcel Number:302.9-1-28.1
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN
Primary OwnerSCHERMERHORN WEDGEWOOD
LLC
ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN
Granted PermissionSchermerhorn Properties
ArchitectRucinski-Hall Architecture
Checklist ItemPassedComments
Building Inspector NotesNO3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
4/11/19 Insulation Partial Approval - Sound Insulation
Installed in Upper portion of common walls in order to
sheetrock backside of mechanical soffits.
4/23/19 proper vent approved for building #1 only.
5/14/19 insulation approved R 38 in ceiling R21 in walls
Garage has R 19 in ceilings and R 11 in walls
May 14, 2019Page (1)
INSPECTION WORKSHEET (BINS-002667-2019)
Checklist ItemPassedComments
Ok to Sheetrock
U Factors = .3 cfm for windows, .5 cfm for doorsYES.31
Tyvek or Similar Exterior SealantYESZip system with foam 3.6 r value used at exterior walls
Proper Vent, Attic VentYES4/23/19 building #1 approved for proper vent
Insulation Residential Check Commercial CheckNO3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
4/11/19 Insulation Partial Approval - Sound Insulation
Installed in Upper portion of common walls in order to
sheetrock backside of mechanical soffits.
Blower Door TestNO
Combustion Air Supply for FurnaceNO
Fresh air supply 3' from gradeNO
Duct Insulation - if required in unheated spacesNO
Air Barrier behind Knee WallsNO
All Ductwork Sealed Return and SupplyNO
May 14, 2019Page (2)
INSPECTION WORKSHEET (BINS-002667-2019)
Checklist ItemPassedComments
Duct Blaster Test for duct work, R-8NO
All Return Air Hard Duct WorkNO
House Wrap Taped at all SeamsNO
Smith, Mark (Inspector)
May 14, 2019Page (3)