Loading...
BINS-001948-2019 04112019INSPECTION WORKSHEET (BINS-001948-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2015Case Module:Permit Inspection Date:Thu Apr 11, 2019Inspection Status:Partial Pass Inspector:John O'BrienInspection Type:Building Insulation Job Address:3-23 Wedgewood DR Bldg. 1Parcel Number:302.9-1-28.1 Queensbury, NY 12804 Contact TypeCompany NameName ArchitectRucinski-Hall Architecture ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN Granted PermissionSchermerhorn Properties Primary OwnerSCHERMERHORN WEDGEWOOD LLC Checklist ItemPassedComments Building Inspector NotesNO3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) 4/11/19 Insulation Partial Approval - Sound Insulation Installed in Upper portion of common walls in order to sheetrock backside of mechanical soffits. Window SealingNO Apr 11, 2019Page (1) INSPECTION WORKSHEET (BINS-001948-2019) Checklist ItemPassedComments U Factors = .3 cfm for windows, .5 cfm for doorsNO Tyvek or Similar Exterior SealantNO Proper Vent, Attic VentNO Insulation Residential Check Commercial CheckNO3/6/19 Insulation Partial Approval. - 1st floor end units corridor ceiling sound insulation approved. 3/6/19 Insulation Partial Approval. - Wall insulation and vapor barrier installed in garage separation wall between the stairs for mechanical rooms at 4 units approved. - 1st floor end units corridor ceiling sound board approved. 3/28/19 Insulation Partial Approval - Exterior walls soffit area only! R19 no vapor barrier required due to Zip System sheathing with foam.(3.6 R value) 4/11/19 Insulation Partial Approval - Sound Insulation Installed in Upper portion of common walls in order to sheetrock backside of mechanical soffits. Blower Door TestNO Combustion Air Supply for FurnaceNO Fresh air supply 3' from gradeNO Duct Insulation - if required in unheated spacesNO Door / Window Sealed (No Insulation)NO Tub Shower R-20 with Vapor BarrierNO Air Barrier behind Knee WallsNO Apr 11, 2019Page (2) INSPECTION WORKSHEET (BINS-001948-2019) Checklist ItemPassedComments All Ductwork Sealed Return and SupplyNO Duct Blaster Test for duct work, R-8NO All Return Air Hard Duct WorkNO House Wrap Taped at all SeamsNO O'Brien, John (Inspector) Apr 11, 2019Page (3)