BINS-002158-2019 04232019INSPECTION WORKSHEET (BINS-002158-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000362-2015Case Module:Permit
Inspection Date:Tue Apr 23, 2019Inspection Status:Partial Pass
Inspector:Mark SmithInspection Type:Building Insulation
Job Address:3-23 Wedgewood DR Bldg. 1Parcel Number:302.9-1-28.1
Queensbury, NY 12804
Contact TypeCompany NameName
ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN
Granted PermissionSchermerhorn Properties
ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN
Primary OwnerSCHERMERHORN WEDGEWOOD
LLC
ArchitectRucinski-Hall Architecture
Checklist ItemPassedComments
Building Inspector NotesNO3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
4/11/19 Insulation Partial Approval - Sound Insulation
Installed in Upper portion of common walls in order to
sheetrock backside of mechanical soffits.
4/23/19 proper vent approved for building #1 only.
Apr 23, 2019Page (1)
INSPECTION WORKSHEET (BINS-002158-2019)
Checklist ItemPassedComments
Window SealingNO
U Factors = .3 cfm for windows, .5 cfm for doorsNO
Tyvek or Similar Exterior SealantNO
Proper Vent, Attic VentNO4/23/19 building #1 approved for proper vent
Insulation Residential Check Commercial CheckNO3/6/19 Insulation Partial Approval.
- 1st floor end units corridor ceiling sound insulation
approved.
3/6/19 Insulation Partial Approval.
- Wall insulation and vapor barrier installed in garage
separation wall between the stairs for mechanical rooms at 4
units approved.
- 1st floor end units corridor ceiling sound board approved.
3/28/19 Insulation Partial Approval
- Exterior walls soffit area only! R19 no vapor barrier required
due to Zip System sheathing with foam.(3.6 R value)
4/11/19 Insulation Partial Approval - Sound Insulation
Installed in Upper portion of common walls in order to
sheetrock backside of mechanical soffits.
Blower Door TestNO
Combustion Air Supply for FurnaceNO
Fresh air supply 3' from gradeNO
Duct Insulation - if required in unheated spacesNO
Door / Window Sealed (No Insulation)NO
Air Barrier behind Knee WallsNO
Apr 23, 2019Page (2)
INSPECTION WORKSHEET (BINS-002158-2019)
Checklist ItemPassedComments
Tub Shower R-20 with Vapor BarrierNO
All Ductwork Sealed Return and SupplyNO
Duct Blaster Test for duct work, R-8NO
All Return Air Hard Duct WorkNO
House Wrap Taped at all SeamsNO
Smith, Mark (Inspector)