Loading...
SEP-001899-2019 04102019INSPECTION WORKSHEET (SEP-001899-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2015Case Module:Permit Inspection Date:Wed Apr 10, 2019Inspection Status:Partial Pass Inspector:John O'BrienInspection Type:Septic Job Address:3-23 Wedgewood DR Bldg. 1Parcel Number:302.9-1-28.1 Queensbury, NY 12804 Contact TypeCompany NameName ArchitectRucinski-Hall Architecture Primary OwnerSCHERMERHORN WEDGEWOOD LLC ApplicantSchermerhorn R.E. HoldingsVANDERWARKER, DARREN ContractorSchermerhorn R.E. HoldingsVANDERWARKER, DARREN Granted PermissionSchermerhorn Properties Checklist ItemPassedComments Building Inspector NotesNO4/10/19 Septic System Partial Approval - 2 Septic Systems - Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree bend to distribution box. Type of Water: Municipal / Well WaterYESMunicipal Absorbtion Fields: Total LengthYES2 Septic Systems @ 420' Length of Each TrenchYES(2) 7 @ 60' Apr 10, 2019Page (1) INSPECTION WORKSHEET (SEP-001899-2019) Checklist ItemPassedComments Depth of TrenchesYESWest System 18"-30" East System 18"-24" Size of StoneYES#2 Building to TankYES4" sch40 Tank to Distribution BoxYES4" sdr35 pvc Distribution box to Field / PitYES4" pvc to 4" pvc perforated InletOutlet Pipes & BafflesYESNo filter as per engineer Engineer Report and As-BuiltNO- Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree Location of system on propertyNOWest Septic System Installed to the west side of building #1. East Septic System Installed to the east of building #1 and the leach field is behind building #3 System Use StatusNO4/10/19 Septic System Partial Approval - 2 Septic Systems - Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree bend to distribution box. Note: Once I receive the email and as-built drawing from the engineer the septic system can be backfilled. O'Brien, John (Inspector) Apr 10, 2019Page (2)