Loading...
SEP-008171-2018 11202018 INSPECTION WORKSHEET (SEP-008171-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal RC-0467-2018Permit Case Number:Case Module: Tue Nov 20, 2018Failed Inspection Date:Inspection Status: John O'BrienSeptic Inspector:Inspection Type: 1232 WEST MOUNTAIN RD288.-1-65 Job Address:Parcel Number: Queensbury, NY 12804 Contact TypeCompany NameName Primary OwnerDwyer, Christopher Granted PermissionDwyer, Christopher ApplicantDwyer, Christopher Checklist ItemPassedComments Building Inspector NotesNO11/20/18 As per my site visit this morning I met with Mr. Dwyer and the rep from Rotor Rooter who will camera the septic system. The camera revealed that there was just one Infiltrator line approximately 25' long. I told Mr. Dwyer he needs to install a compliant septic system for a 2 bedroom dwelling. He said he will be contracting George Drellos to file for permit and install system. The dwelling unit has water saving fixtures so 92' of leach field will be needed based on the soils and 110 gallons per day. The septic tank will need to be pumped again to verify whether it is a 1000 gallon septic tank. George Drellos is not sure if it is because it was pumped at the same time as the main house. Public Sewer Sign-OffNO Soil Type: SandNO Soil Type: LoamNO Nov 20, 2018Page (1) INSPECTION WORKSHEET (SEP-008171-2018) Checklist ItemPassedComments Soil Type: ClayNO Type of Water: Municipal / Well WaterNO Waterline separation distanceNO Well separation distanceNO Well Casing Lengt: 50ft +/-NO Absorbtion Fields: Total LengthNO Septic system field above flood plainNO Septic tanks & pump station anchored in floodNO zone Length of Each TrenchNO Depth of TrenchesNO Size of StoneNO Seepage Pits: NumberNO Size:NO Stone Size:NO Building to TankNO Nov 20, 2018Page (2) INSPECTION WORKSHEET (SEP-008171-2018) Checklist ItemPassedComments Tank to Distribution BoxNO Distribution box to Field / PitNO Opening Sealed:NO End CapNO InletOutlet Pipes & BafflesNO Manholes 12 or less below gradeNO \[Provide extension collar if Yes\]NO Locations / SeparationsNO Foundation to TankNO Foundation to AbsorptionNO Separation of PitsNO Conforms as per Plot PlanNO Engineer Report and As-BuiltNO ETU Maintenance Contract providedNO Location of system on propertyNO Nov 20, 2018Page (3) INSPECTION WORKSHEET (SEP-008171-2018) Checklist ItemPassedComments System Use StatusYES11/20/18 As per my site visit this morning I met with Mr. Dwyer and the rep from Rotor Rooter who will camera the septic system. The camera revealed that there was just one Infiltrator line approximately 25' long. I told Mr. Dwyer he needs to install a compliant septic system for a 2 bedroom dwelling. He said he will be contracting George Drellos to file for permit and install system. The dwelling unit has water saving fixtures so 92' of leach field will be needed based on the soils and 110 gallons per day. The septic tank will need to be pumped again to verify whether it is a 1000 gallon septic tank. George Drellos is not sure if it is because it was pumped at the same time as the main house. O'Brien, John (Inspector) Nov 20, 2018Page (4)