BINS-003073-2019 05292019INSPECTION WORKSHEET (BINS-003073-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0467-2018Case Module:Permit
Inspection Date:Wed May 29, 2019Inspection Status:Partial Pass
Inspector:John O'BrienInspection Type:Building Foundation
Job Address:1232 WEST MOUNTAIN RDParcel Number:288.-1-65
Queensbury, NY 12804
Contact TypeCompany NameName
Primary OwnerDwyer, Christopher
Granted PermissionDwyer, Christopher
ApplicantDwyer, Christopher
Checklist ItemPassedComments
Building Inspector NotesNO12/10/18 As per my inspection of the core drilled location in
the slab there is no insulation under the floor. The material
under the floor which is 4-6" thick is some type of the material
that is light brown in color. I have told Mr. Dwyer he needs to
have 2" Foam Board Insulation Installed at the perimeter of
the slab 1' vertical below grade and then 3' horizontal away
from the slab.
5/29/19 Foundation Insulation Partial Approval
- South & West Elevations (1' vertical 3' horizontal)
Ok to backfill these areas.
FootingsNO
PiersNO
Monolithic SlabNO
Reinforcement in PlaceNO
May 29, 2019Page (1)
INSPECTION WORKSHEET (BINS-003073-2019)
Checklist ItemPassedComments
Foundation / WallpourNO12/10/18 As per my inspection of the core drilled location in
the slab there is no insulation under the floor. The material
under the floor which is 4-6" thick is some type of the material
that is light brown in color. I have told Mr. Dwyer he needs to
have 2" Foam Board Insulation Installed at the perimeter of
the slab 1' vertical below grade and then 3' horizontal away
from the slab.
Reinforcement in PlaceNO
Footing Dowels or Keyway in placeNO
Foundation DampproofingNO
Foundation WaterproofingNO
Footing Drain Daylight or SumpNO
Footing Drain Stone - 12 inch widthNO
Footing Drain Stone - 6 inches above footingNO
Footing Drain stone - 6 mil polyNO
Backfill ApprovalNO5/29/19 Foundation Insulation Partial Approval
- South & West Elevations (1' vertical 3' horizontal)
Ok to backfill these areas.
Plumbing Under SlabNO
PVC / Cast / CopperNO
May 29, 2019Page (2)
INSPECTION WORKSHEET (BINS-003073-2019)
Checklist ItemPassedComments
Foundation Insulation Interior / ExteriorNO5/29/19 Foundation Insulation Partial Approval
- South & West Elevations (1' vertical 3' horizontal)
Ok to backfill these areas.
Rough Grade 6 inch drop within 10 ft.NO
Poly Under SlabNO
O'Brien, John (Inspector)
May 29, 2019Page (3)