Loading...
ResCheck REScheck Software Version 4.6.3 Compliance Certificate FILE COPY Project New Duplex Energy Code: 2015 IECC Location: Glens Falls, New York Construction Type: Single-family IS P N TO 6: ON P ;T Project Type: New Construction ` ITE ALL TIES OR T E Orientation: Bldg. faces 135 deg. from North T ON OF C 0 l�Tl �lTIG��I Conditioned Floor Area: 3,658 ft2 Glazing Area 13% Climate Zone: 6 (7635 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: Smoke Ridge Road Foothills Builders Ethan Peter Hall Queensbury, NY 12804 9 Mountainside Drive Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave Glens Falls, NY 12801 518-741-0268 ephall@nycap.rr.com Compliance: Passes using UA trade-off Compliance: 1.4%Better Than Code Maximum UA: 416 Your UA: 410 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA Perimeter R-Value R-Value Ceiling 1: Raised or Energy Truss 1,856 38.0 0.0 0.025 46 Wall 1:Wood Frame, 16"o.c. 560 21.0 3.6 0.046 21 Orientation: Front Window 1:Wood Frame:Double Pane with Low-E 60 0.290 17 Orientation: Unspecified Door 1: Solid Ball 20 0.300 6 Orientation: Unspecified Door 2:Solid S. y� 20 0.300 6 Orientation: Unspecified ' N ZO Wall 2:Wood Frame, 16"o.c. ;,y W U 500 21.0 3.6 0.046 22 Orientation: Right side Rf Window 2:Wood Frame:Double Pane with Low-E 00 30 0.290 9 Orientation: Unspecified - Wall 3:Wood Frame, 16"o.c. 1I n n 1,008 21.0 3.6 0.046 33 Orientation: Back �==f � Window 3:Wood Frame:Double Pane with Low-E O co 120 0.290 35 Orientation: Unspecified Window 4:Wood Frame:Double Pane with Low-E 60 0.290 17 Orientation: Unspecified Door 3: Solid 20 0.300 6 Orientation: Unspecified Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 1 of10 Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Door 4: Solid 20 0.300 6 Orientation: Unspecified Door 5: Glass 40 0.320 13 Orientation: Unspecified Door 6:Glass 40 0.320 13 Orientation: Unspecified Wall 4:Wood Frame, 16"o.c. 500 21.0 3.6 0.046 22 Orientation: Left side Window 5:Wood Frame:Double Pane with Low-E 30 0.290 9 Orientation: Unspecified • Wall 5:Wood Frame, 16"o.c. 173 21.0 0.0 0.057 9 Orientation: Right side Door 7:Solid 18 0.300 5 Orientation: Unspecified Wall 6:Wood Frame, 16"o.c. 173 21.0 0.0 0.057 9 Orientation: Left side Door 8: Solid 18 0.300 5 Orientation: Unspecified Basement Wall 1:Solid Concrete or Masonry 498 0.0 15.0 0.043 21 Orientation: Front Wall height:8.9' Depth below grade: 7.9' Insulation depth: 8.5' Basement Wall 2: Solid Concrete or Masonry 280 0.0 15.0 0.053 15 Orientation: Right side Wall height: 8.9' Depth below grade: 5.5' Insulation depth: 8.5' Basement Wall 3: Solid Concrete or Masonry 280 0.0 15.0 0.053 15 Orientation: Left side Wall height: 8.9' Depth below grade: 5.5' Insulation depth: 8.5' Basement Wall 4:Solid Concrete or Masonry 94 15.0 0.0 0.065 6 Orientation: Right side Wall height: 8.9' Depth below grade: 5.5' Insulation depth:8.5' Basement Wall 5: Solid Concrete or Masonry 94 15.0 0.0 0.065 6 Orientation: Left side Wall height: 8.9' Depth below grade:5.5' Insulation depth: 8.5' Floor 1: Slab-On-Grade:Unheated 56 10.0 0.684 38 Insulation depth:4.0' Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requireme I ed in t, E c In ection Checklist. Ethan Peter Hall-Architect $. ,wow " / J11' !iT/IlJ Name-Title Sig a f^,.; '{ .-`;��U y.'_ `II9 `A�``'\ Date a, ��Y life`- :- -Jr'.,..A.l ;.n�\. ti y f T\;. \ -P-7`.v. Z1-:,-;_ :-'-.10 / f.i./ Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 2 of10 { REScheck Software VersionChecklist 4.6.3 Energy Code: 2015 IECC Requirements: 97.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, 4 Construction drawings and j❑Complies Requirement will be met. 103.2 documentation demonstrate i ❑Does Not [PR1]1 energy code compliance for the Location on plans/spec:A- �.4 building envelope.Thermal Not Observable 1 envelope represented on ;❑Not Applicable construction documents. 103.1, !Construction drawings and ;❑Complies Requirement will be met. 103.2, documentation demonstrate I ❑Does Not 403.7 energy code compliance for Location on plans/spec:A- [PR3]1 lighting and mechanical systems. 1 ❑Not Observable 1 i.4 Systems serving multiple ( ;❑Not Applicable dwelling units must demonstrate ,compliance with the IECC { Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: °❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Location on plans/spec:A- *.P !Manual J or other methods Btu/hr Btu/hr [Not Observable ,1 approved by the code official. ❑Not Applicable ° Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 3 of10 Section Plans Verified Field Verified Complies? Comments/Assumptions # Foundation Inspection Value Value p p & Req.ID 402.1.2 Slab edge insulation R-value. ; R- R- DComplies See the Envelope Assemblies [F0111 ^0 Unheated 0 Unheated ODoes Not °table for values. iti, ❑ Heated ❑ Heated ❑Not Observable DNot Applicable i 1 402.1.2 Slab edge insulation ft ft '❑Complies t See the Envelope Assemblies [FO3]1 !depth/length. ❑Does Not I table for values. ,, ['Not Observable ❑Not Applicable ' 402.1.1 Conditioned basement wall R- R- DComplies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is used,verification ❑Not Observable may need to occur during `Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 ,Conditioned basement wall ❑Complies Requirement will be met. [FO5]1 `insulation installed per '❑Does Not manufacturer's instructions. ❑Not Observable Location on plans/spec:A- 1 , ;❑Not Applicable 402.2.9 Conditioned basement wall ft ft DComplies See the Envelope Assemblies - [FO6]1 insulation depth of burial or DDoes Not table for values. ` distance from top of wall. ❑Not Observable ,❑Not Applicable 303.2.1 ;A protective covering is installed ' DComplies I Exception: Requirement is [FO11]2 ;to protect exposed exterior ;❑Does Not not applicable. insulation and extends a ❑Not Observable �� ;minimum of 6 in. below grade. ;❑Not Applicable 403.9 ;Snow-and ice-melting system ;DComplies Exception: Requirement is [FO12]2 controls installed. ;❑Does Not not applicable. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: rl THigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 4 of10 2. i Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Door U-factor. U- U- a❑Complies See the Envelope Assemblies 402.3.4 .❑Does Not table for values. [FR1]1 - ❑Not Observable DNot Applicable 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies ;See the Envelope Assemblies 402.3.1, average). Does Not :table for values. 402.3.3, 402.3.6, . ENot Observable 402.5 ❑Not Applicable [FR2]1 f $ P �,CL1� P p 303.1.3 U-factors of fenestration products ❑Complies Requirement will be met. [FR4]1 are determined in accordance ;ODoes Not # with the NFRC test procedure or 4 Location on plans/spec:A- taken from the default table. j ❑Not Observable 1 ;DNot Applicable 402.4.1.1 Air barrier and thermal barrier DComplies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not Lt, instructions. ❑Not Observable Location1 on plans/spec:A ❑Not Applicable 402.4.3 ;Fenestration that is not site built ❑Complies Requirement will be met. 1 [FR20]1 is listed and labeled as meeting ? ❑Does Not 1 AAMA/WDMA/CSA 101/1.5.2/A440 ,or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code DNot Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies Exception: Requirement is [FR16]2 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate<_2.0 cfm ONot Observable leakage at 75 Pa. ❑Not Applicable 403.2.1 'Supply and return ducts in attics ❑Complies ;Requirement will be met. [FR12]1 insulated >=R-8 where duct is i ODoes Not >=3 inches in diameter and >= ,DNot Observable Location on plans/spec:A- R-6 where<3 inches.Supply and; 1 return ducts in other portions of 1 1❑Not Applicable the building insulated >= R-6 for diameter>=3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 ;Building cavities are not used as '❑Complies Requirement will be met. [FR15]3 iducts or plenums. I I❑Does Not fiP DNot Observable 1Location on plans/spec:A- ❑Not Applicable 403.4 IHVAC piping conveying fluids R- R- ❑Complies Exception: Requirement is [FR17]2 above 105°F or chilled fluids ❑Does Not not applicable. " ,below 55°F are insulated to>_R- 3 a ❑Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC ;❑Complies ;Exception: Requirement is [FR24]1 piping. '❑Does Not not applicable. " ['Not Observable DNot Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies Requirement will be met. [FR18]2 >_R-3. ❑Does Not °�" ❑Not Observable Location on plans/spec:A- 1 __ ;DNot Applicable 403.6 Automatic or gravity dampers are .❑Complies o Requirement will be met. [FR19]2 'installed on all outdoor air '❑Does Not intakes and exhausts. Location on plans/spec:A- ❑Not Observable 1 DNot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename: Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 5 of10 • Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 6 of10 C Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ''All installed insulation is labeled .00omplies Requirement will be met. [IN13]2 or the installed R-values IlDoes Not provided. ❑Not Observable ❑Not Applicable 402.1.1, `Wall insulation R-value. If this is a R- I R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not °table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). I❑ Steel '❑ Steel ❑Not Applicable kg °303.2 Wall insulation is installed per ,EIComplies Requirement will be met. [IN4]1 manufacturer's instructions. ;ElDoes Not 1 ❑Not Observable Location on plans/spec:A- DNot Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)— Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const, Dwg's\Duplex Model.rck Page 7 of10 Section v Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R-value. R- R- ❑Complies ;See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not ;table for values. 402.2.2, ' 402.2.E ❑ Steel ElSteel ❑Not Observable [FI1]1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ;❑Complies Location on plans/spec:A- 303.2 manufacturer's instructions. j❑Does Not 1 [F1271 Blown insulation marked every 300 ft2. ;ONot Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. [FI22]2 insulation include baffle adjacent I !❑Does Not to soffit and eave vents that '❑Not Observable Location on plans/spec:A- extends over insulation. 1 ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies ;Requirement will be met. [FI371 insulation R-value of the ❑Does Not adjacent assembly. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50= ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2,and DDoes Not <=3 ach in Climate Zones 3-8. ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies ;Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not !handlers are located within <=3 cfm/100 ft2 without air ❑Not Observable conditioned space. handler @ 25 Pa. For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Exception:All ducts and air [F127]1 determine air leakage with ft2 ft2 ❑Does Not handlers are located within either: Rough-in test:Total conditioned space. leakage measured with a ❑Not Observable pressure differential of 0.1 inch .❑Not Applicable w.g.across the system including the manufacturer's air handler enclosure if installed at time of ` test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated i ❑Complies Exception: Requirement is [FI24]1 by manufacturer at<=2%of ❑Does Not not applicable. design air flow. ❑Not Observable Location on plans/spec:A- ❑Not Applicable 1 1 403.1.1 ;Programmable thermostats ❑Complies Requirement will be met. [FI9]2 ;installed for control of primary I❑Does Not !heating and cooling systems and ❑Not Observable Location on plans/spec:A- initially set by manufacturer to '❑Not Applicable 1 code specifications. pp i 403.1.2 Heat pump thermostat installed ❑Complies Exception: Requirement is [FI10]2 !on heat pumps. ;❑Does Not not applicable. , ,DNot Observable ❑Not Applicable ____ 403.5.1 ,Circulating service hot water ❑Complies ;Exception: Requirement is [FI11]2 !systems have automatic or ❑Does Not i not applicable. accessible manual controls. ['Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system; DComplies Requirement will be met. [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy Location on plans/spec:A- ;and air flow limits. ;ONot Observable 1 ❑Not Applicable 403.2 ;Hot water boilers supplying heat '❑Complies Exception: Requirement is [FI26]2 through one-or two-pipe heating ; 'Oboes Not not applicable. systems have outdoor setback control to lower boiler water ;❑Not Observable temperature based on outdoor ❑Not Applicable ;temperature. 403.5.1.1 1 Heated water circulation systems DComplies Exception: Requirement is [F128]2 :have a circulation pump.The 1❑Does Not :not applicable. ;system return pipe is a dedicated return pipe or a cold water supply; ❑Not Observable pipe.Gravity and thermos- j❑Not Applicable ;syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and ;no demand for hot water exists. 403.5.1.2 Electric heat trace systems } '❑Complies Exception: Requirement is [F129]2 ;comply with IEEE 515.1 or UL ❑Does Not not applicable. ;515.Controls automatically ;adjust the energy input to the ❑Not Observable heat tracing to maintain the ;❑Not Applicable ;desired water temperature in the piping. 403.5.2 'Water distribution systems that ;DComplies Exception: Requirement is [FI30]2 have recirculation pumps that ❑Does Not not applicable. pump water from a heated water supply pipe back to the heated ;❑Not Observable water source through a cold ❑Not Applicable water supply pipe have a i demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold ;water piping to 1042F. 403.5.4 Drain water heat recovery units ❑Complies Requirement will be met. [FI31]2 tested in accordance with CSA ❑Does Not B55.1.Potable water-side Location on plans/spec:A- pressure loss of drain water heat i ['Not Observable 1 'recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- 'side pressure loss of drain water heat recovery units< 2 psi for individual units connected to three or more showers. 404.1 ;75%of lamps in permanent '❑Complies Requirement will be met. [FI6]1 fixtures or 75%of permanent :❑Does Not Mixtures have high efficacy lamps. Location on plans/spec:A- Does not apply to low-voltage ❑Not Observable 1 lighting. i DNot Applicable 404.1.1 Fuel gas lighting systems have i❑Complies Requirement will be met. [FI23]3 no continuous pilot light. ❑Does Not ' ❑Not Observable :Location on plans/spec:A- 1 ;❑Not Applicable r1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 9 of10 Section Plans Verified Field Verified ` # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID , 401.3 Compliance certificate posted. OComplies Requirement will be met. [FI7)2 DDoes Not 1 DNot Observable iONot Applicable 303.3 ;Manufacturer manuals for i0Complies Requirement will be met. [FI18]3 ;mechanical and water heating ;ODoes Not systems have been provided. DNot Observable ONot Applicable ; Additional Comments/Assumptions: 1 High Impact(Tier 1) f 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) —1 Project Title: New Duplex Report date: 05/11/18 Data filename:Y:\Foothills Builders\Smoke Ridge Duplexes\Const. Dwg's\Duplex Model.rck Page 10 of10 i20'15 IE CI EfficiencyCC Energy Certificate Insulation Rating R-Value Above-Grade Wall 24.60 Below-Grade Wall 15.00 Floor 10.00 Ceiling / Roof 38.00 Ductwork(unconditioned spaces): - Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.32 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments