Loading...
Signed Inspection Report (03-03-2020) (12).pdfINSPECTION WORKSHEET (SEP-001202-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:SEP-0657-2019 Case Module:Permit Inspection Date:Tue Mar 3, 2020 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Septic Job Address:Parcel Number:211 ASSEMBLY POINT RD Lake George, NY, 12845 226.19-2-18 Contact Type Company Name Name Granted Permission Steinbach, Erin Engineer Environmental Design Partner (EDP) Applicant Steinbach, Erin Contractor Crandall Excavating Primary Owner Steinbach, Erin Checklist Item Status Building Inspector Notes Passed 2/19/20 for placement of 1,000 gallon pump tank and Clarus fusion 450 ETU tank only prior to backfill. 3/3/20 Septic System Partial Approval - 12'x36' Absorption Pressure Bed Only! Remaining Items: - Submit Engineer's Final Report & Certified Septic System As-Built. - Witness operation of pumps and alarm system - Eric Murdock needs to submit Clarius System's final report and maintenance agreement. - Establish lawn - Final Electrical Inspection 3/3/20 Septic System Partial Approval Remaining Items: - Submit Engineer's Final Report & Certified Septic System As-Built. - Eric Murdock needs to submit Clarius System's final report and maintenance agreement. - Establish lawn - Final Electrical Inspection Mar 03, 2020 Page (1) INSPECTION WORKSHEET (SEP-001202-2020) Checklist Item Status - New Lake George water supply to residence needs to be installed. - Property Transfer Inspection Type of Water: Municipal / Well Water Failed Installed new Lake George water supply Waterline separation distance Failed Well separation distance Passed Neighbor's well 70' as per variance. Absorbtion Fields: Total Length Passed 12'x36' Absorption Pressure Bed Length of Each Trench Passed 3@36' Depth of Trenches Passed 12" System Use Status Failed 3/3/20 Septic System Partial Approval Remaining Items: - Submit Engineer's Final Report & Certified Septic System As-Built. - Eric Murdock needs to submit Clarius System's final report and maintenance agreement. - Establish lawn - Final Electrical Inspection - New Lake George water supply to residence needs to be installed. - Property Transfer Inspection Size of Stone Passed #2 Mar 03, 2020 Page (2) INSPECTION WORKSHEET (SEP-001202-2020) Checklist Item Status Building to Tank Passed Residence to Clarius Tank 4" sch40 pvc Clarius Tank to Pump Station 4" sch40 pvc Tank to Distribution Box Passed Pump tank to Field Manifold - 2" pvc sdr21 force-main Distribution box to Field / Pit Passed Manifold to pressure distribution lines - 1.5" pvc sdr21 Foundation to Tank Passed 18'+/- Foundation to Absorption Failed 92'+/- Conforms as per Plot Plan Failed - Provide certified septic system as-built plan. Engineer Report and As-Built Failed ETU Maintenance Contract provided Failed Location of system on property Failed Mar 03, 2020 Page (3) O'Brien, John