ResCheck t 4.6.4
ffl;h'L
VJ D Compliance Certificate
E C E 0 V E
Project Cerrone Builders Inc OCT U 4 �J11
Energy Code: 2015 IECC TOWN OF QUEENSBURY
Location: Glens Falls, New York BUILDING&CODES
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,755 ft2 296.14-2-22 RC-000626-2017
Glazing Area 13% Cerrone Builders Inc.
Climate Zone: 6 (7635 HDD) 42 Devin Court Lot 22
Permit Date: �
Permit Number: SFD W/FP 1755 s.f., Garage 458 s.f.
Construction Site: Owner/Agent: Designer/Contractor:
42 Devin Court VISION Engineering, LLC
Lot 22 206 Glen Street
Queensbury, NY 12804 Suite 56
Glens Falls, NY 12801
8 3 i t i
Compliance: 0.4%Better Than Code Maximum UA: 281 Your UA: 280
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Perimeter
Ceiling 1: Raised or Energy Truss 1,755 38.0 0.0 0.025 44
Floor 1:All-Wood joist/Truss:Over Outside Air 12 30.0 0.0 0.033 0
Wall 1: Wood Frame, 16" o.c. 1,809 21.0 0.0 0.057 89
Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 194 0.290 56
Door 1: Solid 18 0.140 3
Door 2: Solid 20 0.200 4
Door 3: Glass 18 0.240 4
Basement Wall 1: Solid Concrete or Masonry 1,568 0.0 15.0 0.046 71
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 2: Vinyl/Fiberglass Frame:Double Pane 9 0.400 4
Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 1 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
i
Compliance Statement: The proposed building design described here is consistent with the building pl ,specifications, and other
calculations submitted with the pe it application.The proposed bui ' g has been designed to the 2015 IECC requirements in
REScheck V rsi 4. .4 and to mply with the mandatory require e s listed in the RES Inspection CheckliW.
7z %W1/12
Name-Title ure Ute
Lu I
O o 7
ROl`FCC'.�J
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 2 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
cRE c eck Software Version 4.6.4
l�(J Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen, For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
a '
;
Plans Veri
,E➢efd V I ruffled
PlansVerified
Foundation inspection ieValueComplies? Comments/Assumptions
l eq.I
402.1.1 Conditioned basement wall R- R- ❑Complies ;.See the Envelope Assemblies
[F04]1 insulation R-value.Where interior R- R ❑Does Not ;table for values.
insulation is used,verification
may need to occur during ❑Not Observable
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[F05]1 Insulation installed per ` `f, ❑Does Not
manufacturer's instructions.
�, ❑Not Observable ;
2 ,, ❑Not Applicable
402.2.9 Conditioned basement wall ft ft ;❑Complies ;See the Envelope Assemblies
[F06]1 Jnsulation depth of burial or ❑Does Not ;table for values.
distance from top of wall.
❑Not Observable
❑Not Applicable
A protective covering is installedf,, , []Complies
to protect exposed exterior -]Does Not
i insulation and extends a
''- minimum of 6 in. below grade. -]Not Observable
❑Not Applicable
Snow-and ice-melting system °❑Complies
controls installed. ❑Does Not
m
i� j y ❑Not Observable
. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) A Medium Impact(Tier 2) `;Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 4 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
Section pians Verifieield Verified
# Framd F
ing/Rough»in inspection Value Value Complies? Commen"Assumptions
&iteq.ID
402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR111 ❑Not Observable
` ❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3,
❑
402.3.6, Not Observable
402.5 ❑Not Applicable
[FR2]1
303.1.3 U-factors of fenestration products " ❑Complies
[FR4]1 are determined in accordance ❑Does Not
with the NFRC test procedure or ❑Not Observable
taken from the default table.
❑Not Applicable
402.4.1.1 Air barrier and thermal barrier "" ❑Complies
[FR23]1 installed per manufacturer's El
Does Not
instructions. ❑Not Observable
❑Not Applicable
402.4.3 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/l.S.2/A440
or has infiltration rates per NFRC a ❑Not Observable
400 that do not exceed code ❑Not Applicable
limits.
�.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish " ❑Does Not
and labeled to indicate <_2.0 cfm ❑Not Observable
leakage at 75 Pa.
y
ryy &a El Not App licable
403.2.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is '6�"", ❑Does Not
>= 3 inches in diameter and >_Ike ❑Not Observable
R-6 where < 3 inches.Supply and
return ducts in other portions of []Not Applicable
the building insulated >= R-6 for F:
diameter>= 3 inches and R-4.2 ,
for< 3 inches in diameter. `•
403.3.3.5 i Building cavities are not used as [__[Complies
[FR15]3 ducts or plenums. ❑Does Not
+' ❑Not Observable
❑Not Applicable
403:4 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105°F or chilled fluids ❑Does Not
below 55°F are insulated to >_R- ❑Not Observable
3. ❑Not Applicable
403.4.1 Protection of insulation on HVAC A ❑Complies
[FR24]1 piping. a ❑Does Not
❑Not Observable
❑Not Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR1812 ?R-3. ❑Does Not
_; ❑Not Observable
❑Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR1912 installed on all outdoor air ❑Does Not
intakes and exhausts. g
❑Not Observable
❑Not Applicable
1 ,High Impact(Tier 1) ,; Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 5 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
Additional Comments/Assumptions:
E
11 High Impact(Tier 1) Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 6 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
F Section
# fr►sulatl In inns Verified Field Verified a
& Req.lD
Value Value Complies? C6mment; s
3113,1 All installed insulation is labeled �s = ❑Complies
t[N13]2 or the installed R-values � ❑Does Not
provided.
❑Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
[IN1]1 ❑ Steel ❑ Steel ❑Not Observable
❑Not Applicable
303.2, Floor insulation installed per '"❑Complies
402.2.7 manufacturer's instructions and []Does Not
[IN2]1 in substantial contact with the
underside of the subfloor, or floor ❑Not Observable
framing cavity insulation is in ❑Not Applicable
contact with the top side ofy
sheathing, or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/1 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable
[IN3]1 exterior, the exterior insulation
requirement applies(FR10). E] Steel ❑ Steel ❑Not Applicable
__..... ___ ....................
303.2 Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1!High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 7 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
€tlen Plans Verifiedi eld Verified# Finai Inspection Provisions Value' Value ccmp�lles rrr ersts/Assu patio s
& Re .11}
402.1.1, :Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel ❑ Steel ❑Not Observable
402.2.6
❑
[FI1]1 Not Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. El Does Not
[F12]1 Blown insulation marked every fr
300 ftp. ❑Not Observable
?❑Not Applicable
402'2 1= 'Vented attics with air permeable ;fin❑Complies
*21 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
extends over insulation. a ❑Not Observable
❑Not Applicable
402.2.4 Attic access hatch and door R- R ❑Complies
[F1311 insulation >_R-value of the ❑Does Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies
[F11711 ach in Climate Zones 1-2, and ❑Does Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
❑Not Applicable
_.._ .................................____.;:__.._..___._.___..____
403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[F1411 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
handler @ 25 Pa. For rough-in
:tests,verification may need to ❑Not Applicable 4
occur during Framing Inspection.
._......._.._....._..._.___.__._._
403.3.2 Ducts are pressure tested to cfm/100 cfm/100 '❑Complies
[F127]1 determine air leakage with ft2 ft2 ❑Does Not
i either: Rough-in test:Total
leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
w.g, across the system including
,the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g, across the entire system
:including the manufacturer's air
handler enclosure.
403.3.2.1 ;Air handler leakage designated ❑Complies
[F12411 by manufacturer at <=2%of ❑Does Not
design air flow. ❑Not Observable
❑Not Applicable
403.1.1 Programmable thermostats 'E❑Complies
[F1912 installed for control of primary aEl
Does Not
heating and cooling systems and
initially set by manufacturer to :__: ❑Not Observable ;
code specifications. ❑Not Applicable
403.1.2 Heat pump thermostat installed �` a❑Complies
t
[F]10]2 on heat pumps. Q ti, ❑Does Not }
1;❑Not Observable
❑Not Applicable
403,5.1Circulating service hot water �y �6 ,a❑Complies
[FI 1112 systems have automatic or ❑Does Not
accessible manual controls. a i
a� y' ❑Not Observable
-'
31
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 8 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
T
h Plans Verified field Verified
i In ,JnsPi 5, i'on Provisions Complies? Ct�m en#s/A
i "
Value Value Co
:All mechanical ventilation system " r d ❑Complies
l=i fans not part of tested and listed
[]Does Not
HVAC equipment meet efficacy
a,,x and air flow limits. [:]NotObservable
[]Not Applicable
Hot water boilers supplying heat ,S ❑Complies
� through one-or two-pipe heating ❑Does Not
,011 systems have outdoor setback ❑Not Observable
control to lower boiler water
temperature based on outdoor ❑Not Applicable
Rtemperature.
Heated water circulation systems ❑Complies
have a circulation pump.The e y � s „❑Does Not
system return pipe is a dedicated t p
; return pipe or a cold water supply [:]Not Observable
U1111-_',
N" pipe. Gravity and thermos ❑Not Applicable
�� syphon circulation systems are2 d, y not present.Controls for
=circulating hot water system _
pumps start the pump with signal `" s
for hot water demand within the
:_occupancy. Controls
Fa
automatically turnoff the pump d{f
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 :Electric heat trace systems ❑Complies
12912 comply with IEEE 515.1 or UL ❑Does Not
515.Controls automatically
adjust the energy input to the ❑Not Observable t
heat tracing to maintain the "❑Not Applicable
desired water temperature in the ,
piping. '
403.5.2 Water distribution systems that ?[]Complies
-[f130)z have recirculation pumps that °~ []Does Not
pump water from a heated water E.3 ..
supply pipe back to the heated []Not Observable
_water source through a cold �c����a
❑Not Applicable ;
water supply pipe have a
demand recirculation water •
NNI system. Pumps have controls gid,
l that manage operation of the
pump and limit the temperature
' l of the water entering the, cold
water piping to 1044F.
i
4,
,,Drain water heat recovery units ❑Complies
j tested in accordance with CSA ❑Does Not
655.1. Potable water-side
pressure loss of drain water heat []Not Observable £
recovery units < 3 psi for ❑Not Applicable ;
✓� individual units connected to one
'F fi or two showers. Potable water-
side pressure loss of drain water
heat recovery units< 2 psi for ;
individual units connected to K
F Y "three or more showers. f
404.1 75%of lamps in permanent ❑Complies
[F16)1 fixtures or 75%of permanent , % ❑Does Not
,fixtures have high efficacy lamps.
Does not apply to low-voltage ❑Not Observable
li htin �, " ❑Not Applicable
9 g•
404.1.1 Fuel gas lighting systems have ❑Complies ;
[17123)3 no continuous pilot light. , ❑Does Not
[]Not Observable r
[]Not Applicable
1 High Impact(Tier 1) Medium Impact(Tier 2) Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES - CER Page 9 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
motion Flans Verified Field Verified;
Final Inspection F�ravlsions value ValueC+ lies? Comments/Assurnptlons
& Req.il
401'3 ;Compliance certificate posted. Elco
mplies
iF17l ❑Does Not
yT ❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FU13 mechanical and water heating ❑Does Not
systems have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 ;High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 09/28/17
Data filename: C:\Users\lrobision\Dropbox\VISION Engineering, LLC\Active Projects VE\1284 - DES -CER Page 10 of 10
42 Devin Crt Lot 22\1284 RESCHECK.rck
2015 IECC Energy
Efficiency Certificate
Above-Grade Wall 21.00
Below-Grade Wall 15.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Window 0.29
Door 0.20
Heating System•
Cooling System:
Water Heater:
I'M NOW M1111011
Name: Date:
Comments