Loading...
inspection slip~Queensbury Building &Code Enforcement -Residential Final Inspection ) Office No.(518)761-8256 Arrive:am/pm Depart:b Los Date Inspection request received:Inspector's Initials: NAME:ews peer 2 [a-15 3LOCATION:e Mesa SS ye TYPE OF STRUCTURE:p Cilmi aa Comments: ‘Yes [No|NA}5-/34”Building Number Address visible from road on el‘Chimney Height /"B"Vent/Direct Vent Location E1p 4-2 Fresh Air Intake 3 inch Plumbing Vent through roof minimum 48 inches Roof Complete /Exterior Finish Complete Platform at ail exterior doors Handrail 4 or more risers ‘Guards at stairs,decks,patios more than 30 inches above grade ‘Guard at stairwell at 34 inches or more ‘Guard at deck,porches 36 inches or more Handrail Termination at Newell Post or Wall|InteriorfExterior Railings 34 inches to 38 inches ‘Deck Bracing /Handicapped Ramp Compliant ‘Grade away from foundation 6 inches with 10 festGinchclearancetosilpate ‘Gas Valve shut-off exposed /regulator 18 inches above grade Interior privacy /trim /doors /main entrance 36 inches Bathroom /Kitchen watertight Safety glazing /Window in stairwells safety glazing Interior Smoke Detectors /Carbon Monoxide Detectors Every level:Every Bedroom: Outside every bedroom area: Inter Connected:Battery backup: ‘Attic access 30 inches x 22 inches x 30 inches (heighi)in accessible area. ‘Crawl Spaces 18 inch x 24 inch access,1 sq,f.-150 sq.f.vents Bathroom Fans,ifno window Plumbing fitures Foundation insulation to floor /Sticker on Panel ‘Duct work sealed property /Blower Door Test Certification DatheFloortruss,draft stopping finished basement 7,000 sq.ft Emergency egress below grade ‘Gas Fumace shut-off within 30 feet or within ine of site ‘Oil Fumace shut-off at entrance to fumace area Fumace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed /Heat Trap/Water Temp 140 Enclosed Stairs Sheetrock Underside minimum #4"Gypsum Basement stairs closed rise >4 inches Garage Floor Pitched ‘Garage fireproofing /7 hour fre door /door closer ‘Gas Logs in Sealed or Glass Enclosure Final Electrical;Energy Saving Light Bulbs 60%wv Final Survey Plot Plan ‘Arc Fault Breaker Habitable Spaces /Tamper Proof Receptacles: Flex Gas Pipe Bonding ‘As Built Septic System /Sewer Dept.Inspection Sticker Site Plan /Variance required Flood Plain Certification,if required J iy‘Okay to issue C /C oF C/O [Temporary /Permanent]Ty LABuilding &Codes Forms\Building &Codes\Inspection Forms\Residential Final inspection Form_revised_100406.doo;RevisedJanuary7,2008;Revised 6/26/08;Revised 12/22/10,Revised 04/13/11