Signed Inspection Report (03-17-2020).pdfINSPECTION WORKSHEET (RPLUM-001416-2020)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0625-2018 Case Module:Permit
Inspection Date:Tue Mar 17, 2020 Inspection Status:Failed
Inspector:Mark Smith Inspection Type:Rough Plumbing
Job Address:Parcel Number:154 CLEVERDALE RD
Queensbury, NY, 12804
227.17-2-30
Contact Type Company Name Name
Primary Owner Stonewood Development of
Northeastern NY Inc
Granted Permission HOFFMAN, JEAN
Concrete Contractor R. C. Springer Concrete
Applicant HOFFMAN, JEAN
Engineer Environmental Design Partnership, LLC
Contractor Stonewood Development of
Northeastern NY Inc
Architect McLaughlin, Tim
Framing Contractor Top Notch Builders
Checklist Item Status
Mar 17, 2020 Page (1)
INSPECTION WORKSHEET (RPLUM-001416-2020)
Checklist Item Status
Building Inspector Notes Failed
3/9/20 rough plumbing not approved:
All connections and fittings for sanitary piping must be made at time of inspection. 3" vent must be through the
roof, or install dandy T type fitting so the connection can be verified at a later date. Sanitary lines should be
capped outside the foundation, or install dandy T type fitting so the connection can be verified at a later date. All
tub traps need to be in place at time of inspection. All connections from foundation to roof should be installed and
pressurized at time of inspection.
Supply piping connections must be completed before inspection. All shower valves and fittings should be
completed at time of inspection. 65 psi for 15 minutes.
3/17/20 plumbing not approved:
All connections and traps should be completed at time of inspection. Connect the two tub traps, 3" vent must be
capped out side of the building, 4" pipe n basement must be capped outside the foundation. Call for recheck when
ready.
OK to insulate.
Plumbing Vent Vents in Place Failed
3" vent must be capped out side of house
3" Vent Through Roof Failed
3" vent must be capped out side of house
Shower liner test (2" of water)Failed
Pressure Test Failed
System needs to be rechecked after all connections are made.
Drain Vent Failed
Air Head Failed
5 psi or 10 ft. above highest conn. for 15 minutes Failed
System needsto be rechecked after all connections are made.
Mar 17, 2020 Page (2)
INSPECTION WORKSHEET (RPLUM-001416-2020)
Checklist Item Status
Pressure Test Failed
50 P.S.I for 15 minutes Passed
Holding 50 psi for 15 minutes
Air Test Gas Piping 10 psi for 10 Minutes Failed
All Return Air Hard Duct Work Failed
Duct Insulation - if required in unheated spaces Failed
Duct Testing Outside Conditioned Space Failed
Duct work sealed properly Failed
Mar 17, 2020 Page (3)
Smith, Mark