Loading...
Signed Inspection Report (03-17-2020).pdfINSPECTION WORKSHEET (RPLUM-001416-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0625-2018 Case Module:Permit Inspection Date:Tue Mar 17, 2020 Inspection Status:Failed Inspector:Mark Smith Inspection Type:Rough Plumbing Job Address:Parcel Number:154 CLEVERDALE RD Queensbury, NY, 12804 227.17-2-30 Contact Type Company Name Name Primary Owner Stonewood Development of Northeastern NY Inc Granted Permission HOFFMAN, JEAN Concrete Contractor R. C. Springer Concrete Applicant HOFFMAN, JEAN Engineer Environmental Design Partnership, LLC Contractor Stonewood Development of Northeastern NY Inc Architect McLaughlin, Tim Framing Contractor Top Notch Builders Checklist Item Status Mar 17, 2020 Page (1) INSPECTION WORKSHEET (RPLUM-001416-2020) Checklist Item Status Building Inspector Notes Failed 3/9/20 rough plumbing not approved: All connections and fittings for sanitary piping must be made at time of inspection. 3" vent must be through the roof, or install dandy T type fitting so the connection can be verified at a later date. Sanitary lines should be capped outside the foundation, or install dandy T type fitting so the connection can be verified at a later date. All tub traps need to be in place at time of inspection. All connections from foundation to roof should be installed and pressurized at time of inspection. Supply piping connections must be completed before inspection. All shower valves and fittings should be completed at time of inspection. 65 psi for 15 minutes. 3/17/20 plumbing not approved: All connections and traps should be completed at time of inspection. Connect the two tub traps, 3" vent must be capped out side of the building, 4" pipe n basement must be capped outside the foundation. Call for recheck when ready. OK to insulate. Plumbing Vent Vents in Place Failed 3" vent must be capped out side of house 3" Vent Through Roof Failed 3" vent must be capped out side of house Shower liner test (2" of water)Failed Pressure Test Failed System needs to be rechecked after all connections are made. Drain Vent Failed Air Head Failed 5 psi or 10 ft. above highest conn. for 15 minutes Failed System needsto be rechecked after all connections are made. Mar 17, 2020 Page (2) INSPECTION WORKSHEET (RPLUM-001416-2020) Checklist Item Status Pressure Test Failed 50 P.S.I for 15 minutes Passed Holding 50 psi for 15 minutes Air Test Gas Piping 10 psi for 10 Minutes Failed All Return Air Hard Duct Work Failed Duct Insulation - if required in unheated spaces Failed Duct Testing Outside Conditioned Space Failed Duct work sealed properly Failed Mar 17, 2020 Page (3) Smith, Mark