Loading...
3.4 3.4 FINANCIAL\2020\Purchase Salt Storage Building—Highway—Sourcewell—3-23 RESOLUTION AUTHORIZING PURCHASE AND INSTALLATION OF SALT STORAGE BUILDING FROM HYBRID BUILDING SOLUTIONS AS PART OF HIGHWAY GARAGE CAPITAL PROJECT RESOLUTION NO. ,2020 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, by Resolution No.: 82,2016, the Queensbury Town Board authorized establishment of the Highway Garage Capital Project and Highway Garage Capital Project Fund #208 for the construction of a new Town Highway Garage (Project) and by Resolution No.: 167,2019 authorized engagement of C.T. Male Associates (C.T. Male) for architectural and engineering services relating to the Design, Bid and Construction Administration Phase of the Project, and WHEREAS, C.T. Male accordingly prepared bid documents and specifications for the Project and by Resolution No.: 414,2019 the Town Board authorized award of bids,and WHEREAS, C.T. Male also prepared specifications for the purchase and installation of a Salt Storage Building as part of the Project, and WHEREAS, the New York State Legislature adopted legislation allowing any political subdivision in New York State to "piggyback" off an existing County/State Bid and therefore in this instance, the Town of Queensbury is "piggybacking" with the cooperative, municipal purchasing program Sourcewell Contracting (formerly known as the National Joint Powers Alliance (NJPA}) for the Salt Storage Building, and WHEREAS, C.T. Male has advised that Hybrid Building Solutions is a participating member of Sourcewell Contracting and Hybrid Building Solutions is providing a contract price for the Salt Storage Building for the amount of$167,515 as set forth in C.T. Male's March 12, 2020 letter and Hybrid Building Solution's January 2, 2020 letter presented at this meeting, NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes the purchase and installation of a Salt Storage Building from Hybrid Building Solutions for the amount of $167,515 as set forth in C.T. Male's March 12, 2020 letter and Hybrid Building Solution's January 2, 2020 letter presented at this meeting, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs that payment shall be from Capital Construction Account No.: 208-1620-2899, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Budget Officer to amend the Town Budget, make any adjustments, budget amendments, transfers or prepare any documentation necessary to effectuate all terms of this Resolution, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to execute any needed Agreement and further documentation, and the Town Supervisor, Highway Superintendent, Facilities Manager, Purchasing Agent and/or Budget Officer to take such other and further actions as may be necessary to effectuate the terms of this Resolution. 2 C.T. MALE ASSOCIATES Engineering,Surveying,Architecture, Landscape Architecture &Geology, D.P.C. ��(�— 50 Century Hill Drive, Latham, NY 12110 :41M([�� 518.786.7400 FAX 518.786.7299 www.ctmale.com � March 12.2020 The Honorable John Strough,Supervisor Town of Queensbury 742 Bay Road Queensbury,NY 12804 Re: Hybrid Building Solutions Salt Storage Building Option Quotes New Highway Vehicle Storage Garage, 742 Bay Road, Queensbury,NY 12804 Supervisor Strough: As requested, C.T. Male Associates Engineering,Surveying,Architecture,Landscape Architecture& Geology, D.P.C. (C.T. Male) has assisted the town in the coordination and review of the direct purchase by the Town of a Salt Storage Building from Hybrid Building Solutions. Based on communications with their sales representative the attached Building Option Quotes were provided. After a further review with both the Highway Superintendent and Building and Ground, of the options and costs associated with each, we are all in agreement that the highest available interior clearances is the best approach. Review of the submitted quotes to the Town by Hybrid Building Solutions,dated January 2,2020,the third option is being recommended for purchase by the Town. 42 feet wide by 70 feet long Calhou Superstrutures CC ($167,515.00) - engineered to meet a snow load of 60 lbs and snow load of 105 mph. (2015 IBC Codes) - Includes material and labor to install: o 9'-8" Frost Depth Pre-cast concrete wall o Fabric Structure o 8 foot legs to increase sidewall and building clear height. o Standard Non-FR cover and optional endwalls. o Hilti Anchor bolts and epoxy connection o All equipment,delivery and travel expenses. o Site-Specific stamped engineered plans provided for foundation and building o 20 year Warranty Please let me know if you need anything further from C.T. Male Associates in order to proceed with your purchase of the recommended structure. Sincerely, C.T.MALE SSOCIATES ola . oleo,R.A. Project Architect/Project Manager Civil Engineering • Environmental Services • Survey Services • Land Services •Architecture • Energy&Building Systems Services • Electrical Engineering 1111.11111111 llllr• BUILDING SOLUTIONS 9780 Brauer Road,Clarence Center, New York 14032 Office: 716-741-7416 Fax: 716-706-1403 www.hybridbuildings.co NYS Certified WBE January 2, 2020 Nick Lobosco, R.A. Project Archietect C.T. Male Associates 50 Century Hill Drive Latham, New York 12110 Queensbury Sand/Salt Storage Building Options Dear Nick: Please accept the following Sourcewell pricing for our buildings. We have recently negotiated better pricing with our vendors and are passing that savings onto the Town. • feet wide by 70 feet long Calhoun Super Structures CC,engineered to meet a snow load of 60 lbs. and a , d load of 105 mph. Engineering based on 2015 IBC codes Install 9'8" • t depth pre-cast concrete wall Install of building • • frost depth pre-cast wall by contractor Building sits on 4 foot le: to increase sidewall and building height. Fabric finis to wall Installation by OSHA Certifies, .ctory Trained crew with prevailing wages Standard Non-FR cover Standard Non-FR end wall with two 48"x • sassive vents Hilti Anchor Bolts and Epoxy used to attach buil•'• to ••ndation All Equipment, Delivery and Travel Expenses Ind , -• Site specific stamped engineered plans pro '•ed for foundat ►s and building 20-year Warranty $165,623.00 42 feet wide • 0 feet long Calhoun Super Structures CC,engineered to meet a snow loa• • 60 lbs. and a w'•• load of 105 mph. Engineering based on 2015 IBC codes I . 9'8"frost depth pre-cast concrete wall I snI ta ilding on frost depth pre-cast wall by contractor Building sits on legs to increase sidewall and building height. Fabric fir___30ed o wall Installation by OSHA Certifie , tory Trained crew with prevailing ges Standard Non-FR cover Standard Non-FR end wall with two 48"x 48" is Hilti Anchor Bolts and Epoxy used to uilding to founn as All Equipment, Delivery an el Expenses Included --` Site specific sta engineered plans provided for foundation and building 20-y arranty $166,601.00 42 feet wide by 70 feet long Calhoun Super Structures CC,engineered to meet a snow load of 60 lbs. and a wind load of 105 mph. Engineering based on 2015 IBC codes Install 9'8"frost depth pre-cast concrete wall Install of building on frost depth pre-cast wall by contractor Building sits on 8 foot legs to increase sidewall and building height. Fabric finished to wall Installation by OSHA Certified, Factory Trained crew with prevailing wages Standard Non-FR cover Standard Non-FR end wall with two 48"x 48" passive vents Hilti Anchor Bolts and Epoxy used to attach building to foundation All Equipment, Delivery and Travel Expenses Included Site specific stamped engineered plans provided for foundation and building 20-year Warranty $167,515.00 Requirements: All utilities lines must be clearly marked Building Pad prepared 15 feet surrounding building must be clear for safe operation of equipment We look to the Town to provide us assistance in digging the footers Not included in Proposal: -Electrical requirements -Bollards -Excavation for footers (we look to the Town for assistance) -Bonding and additional insurance -Testing Insurance Carried by Hybrid Building Solutions, LLC $5 million liability $1 million Commercial Auto Inland Marine Insurance for Equipment New York State Workers Compensation &Disability