ResCeck REScheck Software Version 4.6.2
V
CNJ
Compliance Certificate MAY � 5 �
TT RK N,., Iaw � I
� ,
(
� �l
Project CerrDne Builders IncWw �
Energy Code: 2010. New York Energy Conservation � 9r
Location: Warren County, New York a '�
Construction Type: Single-family
Project Type: New Construction ;
Conditioned Floor Area: 1,,245 ft2 <�� �rIV71,
Glazing Area 13% ✓y3 w C)rr,
Climate Zone: 6 (7635 HDD)
Permit Date: ti 7� r
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
West Mtn Phase 2 Lot 10 VISION Engineering, LLC
Queensbury, NY 12804 206 Glen Street
Ste 56
Glens Falls, NY 12801
Compliance: 0.0%Better Than Code Maximum UA: 221 Yamw Uk 221
The%Better or worse Than Code Index refuects how close to compliance the house is based on code trade-oft rules.
It DOES NOT provide an estimate or energy use or dost relative to a mora muri horne.
Envelope Assemlbhe
Ceiling 1: Flat Ceiling or Scissor Truss 1,2.48 38.0 0.0 0,030 37
Wall 1: Wood Frame, 16" o.c. 1,332 21.0 0.0 0,057 64
Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 126 0,320 40
Door 1: Solid 18 0.140 3
Door 2: Solid 20 0.200 4
Door 3: Glass 40 0.320 13
Basement Wall 1: Solid Concrete or Masonry 1,155 0.0 13.0 0,050 57
Wall height: 7.8'
Depth below grade: 7.0'
Insulation depth: 7.8'
Window 2: Vinyl/Fiberglass Frame:Double Pane with Low-E 7 0.400 3
Compliance Statement. The proposedbuilding design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed bu'ding has been designed to meet the 2010 New York Energy
Conservatio ,Construction Code requirements in REScheck Versio 4 6.2 and to comply with the mandatory requ rer ks Il ted in
the RE the spection C ecklist.
"11,
Name- 0e v signature Date
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:1Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 1 of 7
Project Title: Cerrone Builders Inc Report date: 05103/16
Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 2 of 7
REScheck Software Version 4.6.2
Inspection Checklist
Energy Code: 2010 New York Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the REScheck software
Text in the"Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
&Re .ID
103.2 Construction drawings and ❑Complies
[PR1)1 documentation sufficiently ❑Does Not
demonstrates energy code
compliance for the building ❑Not Observable
envelope. ❑Not Applicable
103.2, Construction drawings and ❑Complies
403.7 documentation sufficiently ❑Does Not
[PR311 demonstrates energy code
;4 compliance for lighting and ❑Not Observable
mechanical systems.Systems ❑Not Applicable
serving multiple dwelling units
must demonstrate compliance
with the commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ElComplies
[1311212 sized per ACCA Manual S based Btu/hr Btu/hr []Does Not
A on loads per ACCA Manual J or Cooling: Cooling:
other approved methods. Btu/hr Btu/hr ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 3 of 7
Section
# Foundation Inspection Complies? Comments/Assumptions
& Req.ID
303.2.1 Exposed foundation insulation ❑Complies
[FOS1]2 protection. []Does Not
❑Not Observable
❑Not Applicable
403.8 Snow melt controls. ❑Complies
[F01212 ❑Does Not
U' ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 4 of 7
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Re .ID
402.4.4 Fenestration that is not site built DComplies
[FR20]1 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/l.S.2/A440
or has infiltration rates per NFRC ❑Not Observable
400 that do not exceed code []Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures DComplies
[FR16]2 sealed at housing/interior finish ❑Does Not
14 and labeled to indicate&It;=2.0
cfm leakage at 75 Pa. ❑Not Observable
❑Not Applicable
403.2.2 All joints and seams of air ducts, DComplies
[FR13]1 air handlers,filter boxes,and ❑Does Not
.9 building cavities used as return
.ducts are sealed. DNot Observable
ONot Applicable
403.2.3 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
M' ❑Not Observable
❑Not Applicable
403.3 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 QF or chilled fluids ❑Does Not
below 55 QF are insulated to R-3.
DNot Observable
❑Not Applicable
403.4 Circulating service hot water R- R- ❑Complies
[FRl8]2 pipes are insulated to R-2. ❑Does Not
J ❑Not Observable
_❑Not Applicable
403.5 Automatic or gravity dampers are DComplies
[FR19]2 installed on all outdoor air ❑Does Not
4 intakes and exhausts. []Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) j
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:\Users\DWR Desktop\Desktop11125 Lot 10.rck Page 5 of 7
Section
# Insulation Inspection Complies? Comments/Assumptions
&Re .ID
303.1 All installed insulation labeled or ❑Complies
[iN13)2 installed R-values provided. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact{Tier 3)
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 6 of 7
Section Plans Verified Field Verified
& Re .ID
402.4.2, Building envelope tightness ACH 50= ACH 50= ❑Complies
402.4.2.1 verified by blower door test result ❑Does Not
[FI17]1 of<7 ACH at 50 Pa.This
Q) requirement may instead be met ❑Not Observable
via visual inspection,in which ❑Not Applicable
case verification may need to
occur during Insulation
Inspection.
403.2.2 Duct tightness via post- cfm cfm ❑Complies
[FI4]1 construction with maximum ❑Does Not
V, leakage of 8 cfm to outdoors,or
12 cfm across systems.For ❑Not Observable
rough-in tests,verification may ❑Not Applicable
need to occur during Framing
Inspection,with maximum
leakage of 6 cfm across systems
and 4 cfm without air handler. _
403.1.1 Programmable thermostats ❑Complies
[Fl9]2 installed on forced air furnaces. []Does Not
❑Not Observable
❑Not Applicable _
403.1.2 Heat pump thermostat installed ❑Complies —
[FI10]2 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
403.4 Circulating service hot water ❑Complies
[FIl1]2 systems have automatic or ❑Does Not
4 accessible manual controls. []Not Observable
❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
[F1712 ❑Does Not
❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
J equipment have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 05/03/16
Data filename: C:\Users\DWR Desktop\Desktop\1125 Lot 10.rck Page 7 of 7
2010 New York
Eriergy Conservation
Construction Code
Ermirgy Efficiency
Certificate
Above-Grade Wall 21.00
Below-Grade Wall 13.00
Floor 01.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces);
Window 0.32
Door 0.32
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments