ResCheck REScheck Software Version 4.6.2 FILE COPY
Compliance Certificate
315.10-1-39 RC-000369-2016
Project Cerrone Builders Inc Cerrone Builders Inc.
46 Alessia Drive, Lot 7
Energy Code: 2010 New York Energy Conservation W. Mtn. Rd. Sub_ SFD w/gar• 2891 s.f.
Location: Warren County, New York
Construction Type: Single-family - xC3 r
Project Type: New Construction LT10-
1
Conditioned Floor Area: 2,891 ft2
Glazing Area 1,1% N �Q�r1
Climate Zane: 6 (7635 HDD) U
Permit Date: BUILC
PermitNumber: G1U� }`BURY
BUILDING ODES J
Construction Site: Owner/Agent: Designer/Contractor:_"
West Mtn Phase 2 Lot 7 Vision Engineering, LLC
Queensbury, NY 12804 206 Glen Street
Suite 56
Glens Falls, NY 12801
Compliance: Passes using UA trade-off
Compliance: 1.8%Better Than Code Maximum UA: 447 Your UA: 439
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home-
Envelope Assemblies
Gross Area Cavity Cont.
Per meter
Wall 1:Wood Frame, 16" o.c. 1,620 21.0 0.0 0.057 80
Window 1:Vinyl Frame:Double Pane with Low-E 126 0.340 43
Door 1: Solid 34 0.280 10
Door 2: Glass 40 0.340 14
Door 3: Solid 18 0.140 3
Wall 2:Wood Frame, 16" o.c. 1.,635 21,0 0.0 0,057 84
Window 2: Vinyl Frame:Double Pane with Low-E 170 0.340 58
Ceiling 1: Raised or Energy Truss 1,352 38,0 0.0 0.025 34
Ceiling 2: Flat Ceiling or Scissor Truss 167 38.0 0.0 0.030 5
Ceiling 3: Cathedral Ceiling 114 21.0 0.0 0.048 5
Basement Wall 1: Solid Concrete or Masonry 1,426 0.0 11.0 0.059 83
Wall height: 8.8'
Depth below grade: 7.0'
Insulation depth: 8,8'
Window 3: Vinyl/Fiberglass Frame:Double Pane with Low-E 17 0.340 6
Floor 1: All-Wood JoistfTruss:Over Outside Air 5 30.0 0.0 0.033 0
Floor 2: All-Wood JoistfTruss:Over Unconditioned Space 410 30.0 0.0 0.033 14
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLCIActive Projects VE11147 - DES - Page 1 of 7
Cerrone WM Lot 7\1147 RESCHECK.rck
Compliance Statement: The proposed building design described here i consistent with the building plans, specifications, and other
calculations submitted with the permit appl' tion.The proposed b din has been designed to 10 New York Energy
Conservation Const uction Code require nts in REScheck Ver si 4.6. and to comply wi a mandatory requir ents listed in
theREScheck sp do v(Ctiecklist.
Name-Title lgnature Date
vV
ly
f ill
W
ko. (ll (Y
M
i
OF
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:IUsers\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE11147 - DES - Page 2 of 7
Cerrone WM Lot 7\1147 RESCHECK.rck
REScheck Software Version 4.6.2
Inspection Checklist
Energy Code: 2010 New York Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
Re1D Pre-Inspection/Plan Review Value Value — Complies Comments/Assumptions
Req
.11D
Construction drawings and �� ❑Complies
[PR111 documentation sufficiently ❑Does Not
demonstrates energy code
compliance for the building ❑Nat Observable
❑Not Applicable
envelope.
103.2, Construction drawings and 4Y�❑Complies
403.7 documentation sufficiently ❑Does Not
[PR31L demonstrates energy code []Not Observable
y compliance for lighting and
mechanical systems. Systems ❑Not Applicable
serving multiple dwelling units
must demonstrate compliance
with the commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ❑Complies
[PR2]2 sized per ACCA Manual 5 based Btu/hr Btu/hr ❑Does Not
is on loads per ACCA Manual J or Cooling: Cooling: []Not Observable
other approved methods. Btu/hr Btu/hr
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 i Medium Impact{Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:\Users\DWR DesktoptDropbox\VISION Engineering, LLC\Active Projects VE11147 - DES- Page 3 of 7
Cerrone WM Lot 711147 RESCHECK.rck
Section
# Foundation InspectionCorn plies? ! Comments/Assumptions
&Req.ID
303.2.1 Exposed foundation insulation ❑Complies
[FO11]2 protection. ❑Does Not
[]Not Observable
_ ❑Not Applicable
403.8 `Snow melt controls. ❑Complies
[FO1212 ❑Does Not
[-]Not Observable
❑Not Applicable
Additional Comments/Ass urnptions:
1 High impact(Tier 1) 2_Medium Impact(Tier 2) 3 !Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:IUsers\DWR Des ktop\DropboxWISION Engineering, LLC1Active Projects VE11147 - DES - Page 4 of 7
Cerrone WM Lot 711147 RESCHECK.rck
Section plans Verified Field Verified
# Framing/Rough-in Inspection Value Value ' Complies? Comments/Assumptions
& Re .Ib { _ __
402.4.4 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/I.S.2/A440
or has infiltration rates per NFRC [:]Not Observable
400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate&It;= 2.0
cfm leakage at 75 Pa. ❑Nat Observable
❑Not Applicable
403.2.2 All joints and seams of air ducts, ❑Complies
[FR13]1 air handlers,filter boxes, and ❑Does Not
building cavities used as return
ducts are sealed. ❑Not Observable
❑Nat Applicable
403.2.3 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
❑Nat Observable
❑Not Applicable
403.3 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 4F or chilled fluids ❑Does Not
below 55 9F are insulated to R-3.
[]Not Observable
[]Not Applicable
403.4 Circulating service hot water R- R- ❑Complies
[FR18]z pipes are insulated to R-2. ❑Does Not
❑Not Observable
❑Nat Applicable
403.5 Automatic or gravity dampers are [ Complies i—
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts.
❑Nat Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1} 2 Medium Impact(Tier 2} 3 J Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:IUsers\DWR Des ktop\DropboxWISION Engineering, LLC1Active Projects VE11147 - DES- Page 5 of 7
Cerrone WM Lot 711147 RESCHECK.rck
Section
# Insulation Inspection Complies? Comments/Assumptions
&Req.113
303.1 All installed insulation labeled or ❑Complies
[IN13)2 installed R-values provided. ❑Does Not
' ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
—1t High Impact(Tier 1) 2 1 Medium Impact(Tier 2) � 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:1UserslDWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE11147 - DES - Page 6 of 7
Cerrone WM Lot 7'1147 RESCHECK.rck
a
section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies' Comments/Assumptions
& Req.11)
402.4.2, Building envelope tightness ACH 50 = ACH 50 = ❑Complies
402.4.2.1 verified by blower door test result ❑Does Not
[1=117]' of<7 ACH at 50 Pa.This
requirement may instead be met ❑Not Observable
via visual inspection, in which ❑Not Applicable
case verification may need to
occur during Insulation
Inspection.
403.2.2 Duct tightness via post- cfm cfm ❑Complies
[F14]1 construction with maximum ❑Does Not
leakage of 8 cfm to outdoors, or
12 cfm across systems. For ❑Not Observable
rough-in tests,verification may ❑Not Applicable
need to occur during Framing
Inspection, with maximum
leakage of 6 cfm across systems
and 4 cfm without air handler.
403.1..1 Programmable thermostats T � ❑Complies
[FI9]2 installed on forced air furnaces. ❑Does Not
❑Not Observable
_ ❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10]2 on heat pumps. ❑Does Not
❑Not Observable
❑Nat Applicable
403.4 Circulating service hot water ❑Complies
[FI11]2 systems have automatic or ❑Does Not
accessible manual controls.
❑Not Observable
❑Not Applicable
401,3 Compliance certificate posted. i ❑Complies
[FI7]2 ❑Does Not
❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
equipment have been provided.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �
Project Title: Cerrone Builders Inc Report date: 06/13/16
Data filename: C:IUsers\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1147 - DES- Page 7 of 7
Cerrone WM Lot 711147 RESCHECK.rck
2010 New York
Energy conservation
Construction Code
Energy Efficiency
Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Walt 11.00
Floor 30.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass& Door Rating U-Factor SHGC
Window 0.34
Door 0.34
CoolingHeating &
Heating System:
Cooling System:
Water Heater:
Name: Date: