Loading...
ResCheck REScheck Software Version 4.6.3 LiCompliance Certificate Project Renovations to the Bielak Residence Energy Code: 2015 IECC Location: Lake George, New York 227.17-1-46 RC-0164-2019 Construction Type: Single-family Bielak, Gerard Project Type: Addition 99 Seelye Rd Climate Zone: 6 (7377 HDD) Permit Date: Res. Add/Alt 2645 total s.f. Permit Number: - Construction Site: Owner/Agent: Designer/Contractor: 99 Seeley Road Gerard and Peggy Ann Bielak Ethan Peter Hall Queensbury, NY 12804 99 Seeley Road Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave Glens Falls, NY 12801 FILE I1 L 1 E CO® 518-741-0268 ephall@nycap.mcom Compliance: Passes using UA trade-off Compliance: 3.2%Better Than Code Maximum UA: 532 Your UA: 515 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. REVIEWED FOR It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. ENERGY CODE COMPLIANCE Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Flat Ceiling or Scissor Truss 136 49.0 0.0 0.026 4 Ceiling 2: Flat Ceiling or Scissor Truss 494 49.0 0.0 0.026 13 Ceiling 3: Flat Ceiling or Scissor Truss REVIEWED FOR 199 49.0 0.0 0.026 5 Ceiling 4: Flat Ceiling or Scissor Truss ENERGY CODE COMPLI8 NCE49.0 0.0 0.026 21 Ceiling 5: Cathedral Ceiling 411 49.0 0.0 0.022 9 Wall 1:Wood Frame, 16"o.c. 762 21.0 0.0 0.057 35 Window 1: Wood Frame:Double Pane with Low-E 11 0.290 3 Window 2: Wood Frame:Double Pane with Low-E 28 0.290 8 Window 3: Wood Frame:Double Pane with Low-E 11 0.290 3 Door 1: Glass 18 0.320 6 Door 2: Solid 40 0.300 12 Door 3: Solid 18 0.300 5 Door 4: Solid 20 0.300 6 Wall 2:Wood Frame, 16"o.c. 267 21.0 0.0 0.057 15 Window 4: Wood Frame:Double Pane with Low-E 7 0.290 2 Wall 3: Wood Frame, 16"o.c. 496 21.0 0.0 0.057 25 Window 5:Wood Frame:Double Pane with Low-E 30 0.290 9 Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition-29 Mar 2019.rck Page 1 of10 Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Window 6: Wood Frame:Double Pane with Low-E 24 0.290 7 Wall 4: Wood Frame, 16"o.c. 856 21.0 0.0 0.057 37 Window 7: Wood Frame:Double Pane with Low-E 60 0.290 17 Window 8: Wood Frame:Double Pane with Low-E 144 0.290 42 Wall 5: Wood Frame, 16"o.c. 363 21.0 0.0 0.057 20 Door 5: Solid 20 0.300 6 Wall 6: Wood Frame, 16"o.c. 230 21.0 0.0 0.057 10 Window 9: Wood Frame:Double Pane with Low-E 51 0.290 15 Wall 7: Wood Frame, 16"o.c. 363 21.0 0.0 0.057 10 Door 6: Solid 128 0.200 26 Door 7: Solid 64 0.200 13 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space 1,056 38.0 0.0 0.026 27 Floor 2:All-Wood Joist/Truss:Over Outside Air 136 38.0 0.0 0.026 4 Floor 3: Slab-On-Grade:Unheated 102 10.0 0.684 70 Insulation depth: 4.0' Basement Wall 1: Solid Concrete or Masonry 666 0.0 15.0 0.045 30 Wall height: 7.9' Depth below grade: 6.9' Insulation depth: 7.7' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications,and other calculations submitted with the permit application.The proposed building has been designed to Ins the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requirements -+ in the��w J me ection Checklist. !�Jw Ethan Peter Hall-Architect �/ kfra Name-Title Signa. Date Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 2 of10 REScheck Software Version 4.6.3 Inspection Checklist Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the ['Not Observable Location on plans/spec:A- building envelope.Thermal 1 envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2, documentation demonstrate ElDoes Not 403.7 energy code compliance for ['Not Observable Location on plans/spec:A- [PR3]1 lighting and mechanical systems. 1 Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: ❑Not Observable Location on plans/spec:A- Manual J or other methods Btu/hr Btu/hr 1 approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 I Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 3 of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.2 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [FO1]1 ❑ Unheated ❑ Unheated ❑Does Not table for values. ❑ Heated ❑ Heated ❑Not Observable ❑Not Applicable 402.1.2 Slab edge insulation ft ft ❑Complies See the Envelope Assemblies [FO3]1 depth/length. ❑Does Not table for values. ['Not Observable ❑Not Applicable 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies Requirement will be met. [FO5]1 insulation installed per ❑Does Not manufacturer's instructions. ['Not Observable Location on plans/spec:A- _,,, ['Not Applicable 1 402.2.9 Conditioned basement wall ft ft ;❑Complies See the Envelope Assemblies [FO6]1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable :Not Applicable 303.2.1 A protective covering is installed ❑Complies Exception: Requirement is [F011]2 to protect exposed exterior ❑Does Not not applicable. insulation and extends a minimum of 6 in. below grade. [Not Observable ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies Exception: Requirement is [FO12]z controls installed. ❑Does Not not applicable. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) l 2 Medium Impact(Tier 2) 113 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 4 of10 • Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID _ 402.1.1, Door U-factor. U- U- DComplies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ❑Not Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- DComplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ❑Not Applicable [FR2]1 303.1.3 U-factors of fenestration products DComplies Requirement will be met. [FR4]1 are determined in accordance DDoes Not with the NFRC test procedure or Location on plans/spec:A- taken from the default table. ['Not Observable 1 ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier DComplies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not instructions. Location on plans/spec:A- ❑Not Observable ;1 ❑Not Applicable 402.4.3 Fenestration that is not site built DComplies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures DComplies Exception: Requirement is [FR16]2 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate <_2.0 cfm leakage at 75 Pa. [Not Observable ❑Not Applicable 403.2.1 Supply and return ducts in attics DComplies Exception: Ducts located [FR12]1 insulated >= R-8 where duct is DDoes Not completely inside the >= 3 inches in diameter and >= building envelope. R-6 where< 3 inches.Supply and! ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for<3 inches in diameter. 403.3.3.5 Building cavities are not used as DComplies Requirement will be met. [FR15]3 ducts or plenums. DDoes Not [Not Observable Location on plans/spec:A- ❑Not Applicable ,,;1 403.4 HVAC piping conveying fluids R- R- DComplies Exception: Requirement is [FR17]2 above 105°F or chilled fluids DDoes Not not applicable. below 55°F are insulated to?...-R- _, 3. [Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC DComplies Exception: Requirement is [FR24]1 piping. ❑Does Not not applicable. _ ['Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- DComplies Requirement will be met. [FR18]2 >_R-3. ❑Does Not d; ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 403.6 Automatic or gravity dampers are DComplies Requirement will be met. [FR19]2 installed on all outdoor air DDoes Not intakes and exhausts. ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 11THigh Impact(Tier 1) L2 TMedium Impact(Tier 2) 1 3 1Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 5 of10 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 6 of10 • Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled ❑Complies Requirement will be met. [IN13]2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per ❑Complies Requirement will be met. 402.2.7 manufacturer's instructions and ❑Does Not [IN2]i in substantial contact with the Location on plans/spec:A- < - underside of the subfloor, or floor; ['Not Observable 1 framing cavity insulation is in ❑Not Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass [Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). ❑ Steel III Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. ❑Does Not ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable Additional Comments/Assumptions: 1 1High Impact(Tier 1) 12 IMedium Impact(Tier 2) 13 JLow Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID T_ 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel [Not Observable 402.2.E[FI1 ❑ 1 ppNot A licable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [FI2]1 Blown insulation marked every Location on plans/spec:A- 300ft2. 1 ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. [FI22]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that Location on plans/spec:A- extends over insulation. ❑Not Observable ;1 ❑Not Applicable 402.2.4 Attic access hatch and door R- R- '❑Complies Requirement will be met. [FI311 insulation >_R-value of the ❑Does Not adjacent assembly. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50= ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable Location on plans/spec:A- , Not Applicable 1 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not handlers are located within <=3 cfm/100 ft2 without air ['Not Observable conditioned space. handler @ 25 Pa. For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 :❑Complies Exception:All ducts and air [FI27]1 determine air leakage with ft2 ft2 ❑Does Not handlers are located within either: Rough-in test:Total ['Not Observable conditioned space. leakage measured with a pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies Requirement will be met. [F124]1 by manufacturer at<=2%of ❑Does Not design air flow. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies Requirement will be met. [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and ['Not Observable Location on plans/spec:A- initially set by manufacturer to 1 code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies Requirement will be met. [FI10]2 on heat pumps. ❑Does Not ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies Exception: Requirement is [FI11]2 systems have automatic or ❑Does Not not applicable. accessible manual controls. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 'Medium Impact(Tier 2) I 3 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition - 29 Mar 2019.rck Page 8 of10 • Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system ❑Complies Requirement will be met. [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy ['Not Observable Location on plans/spec:A- and air flow limits. 1 ENot Applicable 403.2 Hot water boilers supplying heat .; ❑Complies Exception: Requirement is [FI2612 through one-or two-pipe heating ODoes Not not applicable. systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor :Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies 'Exception: Requirement is [F128]2 have a circulation pump.The ❑Does Not not applicable. system return pipe is a dedicated return pipe or a cold water supply, Not Observable pipe.Gravity and thermos- ENot Applicable syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [F129]2 comply with IEEE 515.1 or UL ❑Does Not not applicable. 515.Controls automatically adjust the energy input to the ['Not Observable heat tracing to maintain the ENot Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies Exception: Requirement is [F130]2 have recirculation pumps that ❑Does Not not applicable. pump water from a heated water supply pipe back to the heated ['Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. 403.5.4 Drain water heat recovery units ❑Complies Requirement will be met. [FI31]2 tested in accordance with CSA ❑Does Not B55.1. Potable water-side [Not Observable Location on plans/spec:A- pressure loss of drain water heat 1 recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units< 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies Requirement will be met. [FI6]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. ['Not Observable Location on plans/spec:A- Does not apply to low-voltage 1 lighting. ENot Applicable 404.1.1 Fuel gas lighting systems have ❑Complies Requirement will be met. [FI23]3 no continuous pilot light. ❑Does Not r,r [Not Observable Location on plans/spec:A- 1 ENot Applicable 1 I High Impact(Tier 1) I 2 Medium Impact(Tier 2) I 3 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [FI7]2 ❑Does Not ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies Requirement will be met. [FI18]3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11'High Impact(Tier 1) 1 2 1 Medium Impact(Tier 2) 1 3 [Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Addition -29 Mar 2019.rck Page 10 of10 • 20,Eite 15 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 15.00 Floor 38.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.20 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments REScheck Software Version 4.6.3 Compliance Certificate f 1,1 Project Renovations to the Bielak Residence I1 �I{ � M AR 2 I Energy Code: 2015 IECC 2G� Location: Lake George, New York 227.17-1,46 1LL9 Construction Type: Single-family RC-0164-2019 `A lS URY Project Type: Alteration Bielak, Gerard 'U.. . i ENT Climate Zone: 6 (7377 HDD) 99 Seelye Rd Permit Date: Res. Add/Alt Permit Number: 2645 total s.f. Construction Site: Owner/Agent: Designer/Contractor: 99 Seeley Road Gerard&Peggy Ann Bielak Ethan Peter Hall Queensbury, NY 12804 99 Seeley Road Rucinski Hall Architecture Queensbury, NY 12804 134 Dix Ave Glens Falls, NY 12801 518-741-0268 ephall@nycap.rr.com Compliance: Passes using prescriptive requirer:grits fnr altcratic„projects ENERGY CODE CO PLACE Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Window 1:Wood Frame:Double Pane with Low-E 159 0.290 46 Window 2:Wood Frame:Double Pane with Low-E 50 0.290 14 Window 3:Wood Frame:Double Pane with Low-E 65 0.290 19 Window 4: Wood Frame:Double Pane with Low-E 15 0.290 4 Window 5: Wood Frame:Double Pane with Low-E 39 0.290 11 Window 6:Wood Frame:Double Pane with Low-E 18 0.290 5 Window 7:Wood Frame:Double Pane with Low-E 22 0.290 6 Window 8:Wood Frame:Double Pane with Low-E 22 0.290 6 Window 9:Wood Frame:Double Pane with Low-E 24 0.290 7 Window 10:Wood Frame:Double Pane with Low-E 32 0.290 9 Window 11:Wood Frame:Double Pane with Low-E 16 0.290 5 Door 1: Glass 40 0.320 13 Door 2: Glass 40 0.320 13 Door 3: Glass 40 0.320 13 Door 4: Glass 53 0.320 17 Door 5: Glass 20 0.320 6 Door 6: Glass 36 0.320 12 Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 1 of10 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requirements list 'n the RE ec sp ion Checklist. �n/ Ethan Peter Hall-Architect G% /�/lvi. lag Name-Title Signatur Date Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration - 29 Mar 2019.rck Page 2 of10 REScheck Software VersionChecklist 4.6.3 Energy Code: 2015 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and EComplies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the Location on plans/spec:A- _ building envelope.Thermal ['Not Observable 1 envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for Location on plans/spec:A- [PR3]1 lighting and mechanical systems. 1 Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is. Heating: Heating: ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Not Observable Location on plans/spec:A- Manual J or other methods Btu/hr Btu/hr 1 approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) I3 [Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 3 of10 Section # Foundation Inspection Complies? Comments/Assumptions & Req.ID 303.2.1 A protective covering is installed to ❑Complies Exception: Requirement is not applicable. [F01l]2 protect exposed exterior insulation DDoes Not and extends a minimum of 6 in. below grade. ['Not Observable ONot Applicable 403.9 Snow-and ice-melting system controls ❑Complies Exception: Requirement is not applicable. [FO12]2 installed. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 I High Impact(Tier 1) 12 'Medium Impact(Tier 2) -I 3 'Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 4 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Glazing U-factor(area-weighted U- U- OComplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ❑Not Applicable [FR211 303.1.3 U-factors of fenestration products ❑Complies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ['Not Observable Location on plans/spec:A- taken from the default table. 1 ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met. [FR23]1 installed per manufacturer's ❑Does Not instructions. Location on plans/spec: A- ❑Not Observable :1 ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/1.5.2/A440 or has infiltration rates per NFRC or Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies Exception: Requirement is [FR1612 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate 52.0 cfm leakage at 75 Pa. ['Not Observable ❑Not Applicable 403.2.1 Supply and return ducts in attics ` ❑Complies Exception: Ducts located [FR12]1 insulated >= R-8 where duct is ❑Does Not completely inside the >= 3 inches in diameter and >_ building envelope. R-6 where< 3 inches.Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies Requirement will be met. [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable 403.4 HVAC piping conveying fluids R- R- ❑Complies Exception: Requirement is [FR17]2 above 105°F or chilled fluids ❑Does Not not applicable. below 55°F are insulated to>_R- .- 3 [Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC ❑Complies Exception: Requirement is [FR24]1 piping. ❑Does Not not applicable. ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- !❑Complies Exception: Requirement is [FR18]2 >R-3. ❑Does Not not applicable. ['Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies Requirement will be met. [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable Location on plans/spec:A- 1 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) l 2 'Medium Impact(Tier 2) 1 3 iLow Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 5 of10 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration - 29 Mar 2019.rck Page 6 of10 Section Insulation Inspection Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled or the ❑Complies Requirement will be met. [IN13]2 installed R-values provided. ❑Does Not ❑Not Observable ONot Applicable Additional Comments/Assumptions: High Impact(Tier 1) 1 2j Medium Impact(Tier 2) 13 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 7 of10 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.lD 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [FI3]1 insulation R-value of the ElDoes Not adjacent assembly. Location on plans/spec:A- ❑Not Observable 1 ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. Location on plans/spec: A- ❑Not Observable 1 ❑Not Applicable 403.2.3 Duct tightness test result of<=4 ! cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not handlers are located within <=3 cfm/100 ft2 without air conditioned space. handler @ 25 Pa. For rough-in ['Not Observable tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Exception:All ducts and air [FI27]1 determine air leakage with ft2 ft2 Oboes Not handlers are located within either: Rough-in test:Total ['Not Observable conditioned space. leakage measured with a pressure differential of 0.1 inch ❑Not Applicable w.g.across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies Exception: Requirement is [FI24]1 by manufacturer at<=2%of ❑Does Not not applicable. design air flow. [Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies Exception: Requirement is [Fl9]2 installed for control of primary ❑Does Not not applicable. heating and cooling systems and initially set by manufacturer to Not Observable code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies Exception: Requirement is [FI10]2 on heat pumps. ❑Does Not not applicable. ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ElComplies Exception: Requirement is [FI11]2 systems have automatic or ❑Does Not not applicable. accessible manual controls. ❑Not Observable ❑Not Applicable 403.6.1 All mechanical ventilation system ❑Complies Exception: Requirement is [FI25]2 fans not part of tested and listed ❑Does Not not applicable. HVAC equipment meet efficacy and air flow limits. ❑Not Observable ONot Applicable 403.2 Hot water boilers supplying heat ❑Complies Exception: Requirement is [FI26]2 through one-or two-pipe heating ❑Does Not not applicable. systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. 1 High Impact(Tier 1) 12 'Medium Impact(Tier 2) 13 'Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 8 of10 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.5.1.1 Heated water circulation systems ❑Complies Exception: Requirement is [F128]2 have a circulation pump.The ❑Does Not not applicable. system return pipe is a dedicated return pipe or a cold water supply', Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [FI29]2 comply with IEEE 515.1 or UL ❑Does Not not applicable. 515.Controls automatically adjust the energy input to the [Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies Exception: Requirement is [F130]2 have recirculation pumps that ❑Does Not not applicable. pump water from a heated water supply pipe back to the heated ['Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. 403.5.4 Drain water heat recovery units DComplies !Exception: Requirement is [F131]2 tested in accordance with CSA ❑Does Not not applicable. B55.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units< 2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies Requirement will be met. [FI6]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. ['Not Observable Location on plans/spec:A- Does not apply to low-voltage 1 lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies Exception: Requirement is [FI23]3 no continuous pilot light. ElDoes Not not applicable. [Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [F17]2 ❑Does Not ['Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies Requirement will be met. [FI18]3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 LHigh Impact(Tier 1) L 2 FMedium Impact(Tier 2) f 3 I Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration -29 Mar 2019.rck Page 9 of10 (1jHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Renovations to the Bielak Residence Report date: 03/29/19 Data filename: Y:\Bielak Residence\Const Dwg's\Bielak-Alteration - 29 Mar 2019.rck Page 10 of10 i20 IE CI Efficie15ncyCC Energy Certificate Insulation Rating R-Value Above-Grade Wall 0.00 Below-Grade Wall 0.00 Floor 0.00 Ceiling / Roof 0.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.32 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments