ResCheck REScheck Software Version 4.5.0
cl�(J Compliance Certificate -
, 2Ui4
Project The Abele Residence
N D RUp O
Energy Code: 2010 New York Energy Conservation
Location: Warren County, New York
Construction Type: Single-family
Project Type: New Construction _ c�
Orientation: Bldg. faces 270 deg. from North
Conditioned Floor Area: 1,975 ft2
Glazing Area 20% o OFES
Climate Zane: 6 (7635 HDD)
Permit Date: 22 September, 2014
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
102 Rockhurst Road Abele Builders
Queensbury, NY 14 Corporate Drive
Clifton Park,NY 12065
�Compliance: Passes using UA trade-off
Compliance: 1.1%Better Than Code Maximum UA: 267 Your UA: 264
The%Better or Worse Than Code Index reflects how close to compliance the house is based an code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont. Glazing
Assembly or R-Value R-Value or Door UA
Perimeter U-Factor
Foundation Walls:Solid Concrete or Masonry 360 0.0 21.0 0.035 13
Orientation: Front
Wall height: 8.6'
Depth below grade: 7.6'
Insulation depth: 8.6'
Foundation Wall @ Walk-out:Wood Frame, 16" D.C. 353 21.0 0.0 0.057 14
Orientation: Back
1x Bed#2 (E): Wood Frame:Double Pane with Low-E 31 0.290 9
Orientation: Back
Living#5: Glass 53 0.300 16
Orientation: Back
1x Bed#3 (E):Wood Frame:Double Pane with Low-E 31 0.290 9
Orientation: Back
Foundation Walls: Solid Concrete or Masonry 361 0.0 21.0 0.035 13
Orientation: Left side
Wall height: 8.6'
Depth below grade: 7.6'
Insulation depth: 8.6'
Foundation Walls: Solid Concrete or Masonry 241 0.0 21.0 0.035 8
Orientation: Right side
Wall height: 8.6'
Depth below grade: 7.6'
Insulation depth: 8.6'
First Floor Walls:Wood Frame. 16" o.c. 420 21.0 0.0 0.057 18
Orientation: Front
Project Title:The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 1 of 8
Check\102 Rockhurst Road.rck
Gross Area Glazing
Assembly or avity ont. or Door UA
2x Mud(B):Wood Frame:Double Pane with Low-E 12 0.290 3
Orientation: Front
1x Stair(G):Wood Frame:Double Pane with Low-E 39 0.290 11
Orientation: Front
1x Powder(8):Wood Frame:Double Pane with Low-E 6 0.290 2
Orientation: Front
#1 Foyer: Solid 21 0.190 4
Orientation: Front
3x Master Bath (B):Wood Frame:Double Pane with Low-E 18 0.290 5
Orientation: Front
First Floor Walls:Wood Frame, 16" o.c. 440 21.0 0.0 0.057 18
Orientation: Back
1x Master Bed (F):Wood Frame:Double Pane with Low-E 35 0.290 10
Orientation: Back
1x Dining (F):Wood Frame:Double Pane with Low-E 35 0.290 10
Orientation: Back
1x Living (H): Wood Frame:Double Pane with Low-E 48 0.290 14
Orientation: Back
First Floor Walls:Wood Frame, 16"o.c. 422 21.0 0.0 0.057 21
Orientation: Left side
Dining #5: Glass 53 0.300 16
Orientation: Left side
First Floor Walls:Wood Frame,16"o.c. 280 21.0 0.0 0.057 15
Orientation: Right side
3x Master Bed (B):Wood Frame:Double Pane with Low-E 18 0.290 5
Orientation: Front
Ceiling: Raised or Energy Truss 1,209 38.0 0.0 0.025 30
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building as been designed to meet the 2010 New York Energy
Conservation Construction Code requirements in REScheck Version 4.5.0 to mply with the mandatory requirements listed in
the REScheck Inspection Checklist.
Name-TitleY
Sign atup Date
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 2 of 8
Check\102 Rockhurst Road.rck
REScheck Software Version 4.5.0
Inspection Checklist
Energy Code: 2010 New York Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value complies? Comments/Assumptions
&Reg.]
103.2 Construction drawings and ❑Complies
[PR1]1 documentation sufficiently ❑Does Not
0 demonstrates energy code
compliance for the building ❑Not Observable
envelope. ❑Not Applicable
103.2, Construction drawings and ❑Complies
403.7 documentation sufficiently ❑Does Not
[PR3]1 demonstrates energy code
g compliance for lighting and [:]Not Observable
mechanical systems.Systems ❑Not Applicable
serving multiple dwelling units
must demonstrate compliance
with the commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ❑Complies
[PR2]' sized per ACOA Manual S based Btu/hr Btu/hr ❑Does Not
on loads per ACOA Manual J or Cooling: Cooling:
other approved methods. Btu/hr Btu/hr ❑Not Observable
— ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 3 of 8
Check\102 Rockhurst Road.rck
2010 New
York Foundation Inspection Complies? Comments/Assumptions
Ener
303.2.1 Exposed foundation insulation ❑Complies
[F011]' protection. ❑Does Not
.dJ ❑Not Observable
❑Not Applicable
403.8 Snow melt controls. ❑Complies
[F012]' ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Ter 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 4 of 8
Check\102 Rockhurst Road.rck
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value
&Re .ID Value Complies? Comments/Assumptions
402.4.4 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ❑Does Not
Q' AAMA/WDMA/CSA 101/1.5.2/A440 ❑Not Observable
or has infiltration rates per NFRC ❑Not
400 that do not exceed code Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate&It;= 2.0
cfm leakage at 75 Pa. ❑Not Observable
❑Not Applicable
403.2.1 Supply ducts in attics are R- R-_ ❑Complies
[FR12]1 insulated to R-8.All other ducts R- R- []Does Not
10 in unconditioned spaces or —
outside the building envelope are ❑Not Observable
insulated to R-6.Not applicable if ❑Not Applicable
all systems are ductless.
403.2.2 All joints and seams of air ducts, ❑Complies
[FR13]1 air handlers,filter boxes, and ❑Does Not
building cavities used as return
ducts are sealed. []Not Observable
❑Not Applicable
403.2.3 Building cavities are not used as - - ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
U ',❑Not Observable
❑Not Applicable
403.3 HVAC piping conveying fluids R-- R-- ❑Complies
[FR17]2 above 105 QF or chilled fluids ❑Does Not
0 below 55 QF are insulated to R-3.
[]Not Observable
❑Not Applicable
403.4 Circulating service hot water R-- R-_ ❑Complies
[FR18]2 pipes are insulated to R-2. ❑Does Not
4 []Not Observable
❑Not Applicable
403.5 Automatic or gravity dampers are ;❑Complies
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(tier 3)
Project Title:The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 5 of 8
Check\102 Rockhurst Road.rck
2010 New
York Insulation Inspection Complies? Comments/Assumptions
Ener
303.1 All installed insulation labeled or ❑Complies
(IN13]2 installed R-values provided. ❑Does Not
5b ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 6 of B
Check\102 Rockhurst Road.rck
Section Plans Verified Field Verified
# Final Inspection Provisions
&R .10 Value Value Complies? Comments/Assumptions
402.4.2, Building envelope tightness ACH 50 =_ ACH 50 =_ ❑Complies
402.4.2.1 verified by blower door test result ❑Does Not
[FI17]1 of<7 ACH at 50 Pa.This
requirement may instead be met ❑Not Observable
via visual inspection,in which ❑Not Applicable
case verification may need to
occur during Insulation
Inspection.
402.4.3 Woad-burning fireplaces have ❑Complies
[FI8]' gasketed doors and outdoor ;❑Does Not
combustion air. - ?❑Not Observable
❑Not Applicable
403.2.2 Duct tightness via post- _cfm _cfm ❑Complies
[F14]1 construction with maximum ❑Does Not
leakage of 8 cfm to outdoors,or
12 cfm across systems.For ❑Not Observable
rough-in tests,verification may ❑Not Applicable
need to occur during Framing
Inspection,with maximum
leakage of 6 cfm across systems
and 4 cfm without air handler.
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed on forced air furnaces. ❑Does Not
10 .❑Not Observable
❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10]2 on heat pumps. ❑Does Not
U' ❑Not Observable
❑Not Applicable
403.4 Circulating service hot water ❑Complies
[Flll]z systems have automatic or ❑Does Not
0 accessible manual controls. ❑Not Observable
❑Not Applicable
403.9.1 Readily accessible switch on ❑Complies
[F11213 heaters for swimming pools. []Does Not
❑Not Observable
❑Not Applicable
403.9.2 Timer switches on pool heaters ❑Complies
[FI19]3 and pumps are present. ❑Does Not
❑Not Observable
❑Not Applicable
403.9.3 Heated swimming pools have a ❑Complies
[F120]3 cover.Covers on pools heated ❑Does Not
Q, over 90 9F are insulated to R-12. ❑Not Observable
❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
IFI712 ❑Does Not
�J
[]Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[F11813 mechanical and water heating ❑Does Not
equipment have been provided. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 1 2 Medium Impact(Tier 2) j 3 I Low Impact(Tier 3)
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 7 of 8
Check\102 Rockhurst Road.rck
II High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: The Abele Residence Report date: 09/30/14
Data filename: F:\Share\Drawings\Outside Design Projects\Abele Builders\Chris Lake House\Res- Page 8 of 8
Check\102 Rockhurst Road.rck
2010 New York
Energy Conservation
Construction Code
Energy Efficiency
Certificate
Insulation Rating R-Value
Wall 21.00
Floor 21.00
Ceiling / Roof 36.00
Ductwork (unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.29 0.25
Door 0.30 0.25
Heating&Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments