Loading...
proposedACE ENGINEERIN@SP.C.|169 Haviland Road,Queensbury,NY 12804 Phone -518-745-4400 Fax ~518-792-8511 June5,2006 Project #49219 Mr,Dave Hatin oor 7-1.39 Town of Queensbury ase s 742 Bay Road 716 Ri Andro 167.2999 Queensbury,NY 12801 Re:Replacement Septic System -Dommaschk Residence — 716 Ridge Road,Queensbury,NY Dear Dave: On May 26,2006,we performed a percolation test at the Andrew Dommaschk residence located at 716 Ridge Road in Queensbury.The test was performed to the northeast of the existing residence in the location where construction ofa replacement leach field is proposed.The residence has an existing failed septic system which will be decommissioned upon completion and certification of the replacement system.TOWN OF ¢i ‘The results of the testing are as follows: Test Pit 0 —11”?Medium Fine Sand w/Gravel 11-16 Topsoil 16-27"Loamy Medium Fine Sifty,Sand .27-52”Fine Silty Sand____BUILDING DEBAATNEAY :°»Based on our limited examination,complianMottlingobservedat30”*with our commenis shal ol be Sonate oOWaterobserved@48°"2 ¢atng thelane and spactcatans se JRy | mn with t ic de ~E / Newton cree the Building Codes of 3 | PercolationTestStabilizationpercolationrate-1”in 14 minute,47 seconds The hole was presoaked and the test was run 7 times until it stabilized with three consecutive runs of 14:37,14:43 and 14:47 respectively. ‘The design flow for this 3 bedroom residence at 110 gpd per bedroom requires 550 sf of absorptive area.The replacement septic system should be a shallow absorption bed system no greater than 6”belowthe existing grade.Prior to installation of the absorption bed,the contractor must completely remove the buried topsoil layer. sist of a by ‘The replacement shallow absorption bed system for the proposed residence should co new 1,250 gallon septic tank located on the east side of the residence and a 20 foot foot long absorption bed with a distributi emaeaitharesicenee, FILE COPY J We have included a Standard Septic System Detail Sheet for your files and for use by the contractor during construction. Please call me if you have any questions. Sincerely, /grppmALLL “Thomas R.Center,PE 7 CC:Andrew Dommaschk