A190505 - Mechanical COMcheck-Web_compliance_report_20200505_121813_987COMcheck Software Version COMcheckWeb Mechanical Compliance Certificate Project Title: 2015 IECC Project Type:New Construction Location:Glens Falls, New York Climate Zone:6a Construction Site: 160 Aviation Road Queensbury, New York 12804 Owner/Agent: Tim Bartlett United Cerebral Palsy Association of the Tri-Counties, Inc. 22 Corporate Woods Blvd 5th Floor Albany, New York 12211 518-703-0549 t_bartlett@cfdsny.org Designer/Contractor: Fusion Systems Engineering, DPC 634 Plank Road, Suite 203B Clifton Park, New York 12065 5186210533 Project Information Energy Code: New Respite Care Facility 160 Aviation Road Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Mechanical Systems List Quantity System Type & Description Heating: 1 each - Central Furnace, Gas, Capacity = 40 kBtu/h Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Split System, Capacity = 24 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-1 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Single-Zone VAV, 805 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade 1 HVAC System (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 60 kBtu/h Proposed Efficiency = 96.30% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Split System, Capacity = 42 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-2 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes Fans: F-2 SUPPLY FAN Supply, Single-Zone VAV, 1415 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade 1 HVAC System (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 40 kBtu/h Proposed Efficiency = 96.50% Et, Required Efficiency: 80.00 % Et or 78% AFUE Cooling: 1 each - Split System, Capacity = 30 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception: None Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: F-3 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes Fans: F-3 SUPPLY FAN Supply, Single-Zone VAV, 1015 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade 1 HVAC System (Single Zone): Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 101ofPage Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 102ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2015 IECC Section Req.ID Plan Review Complies?Comments/Assumptions C103.2 PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 103ofPage Section Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C403.2.4. 5, C403.2.4. 6 FO9]3 Snow/ice melting system sensors for future connection to controls. Freeze protection systems have automatic controls installed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 104ofPage Section Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.6.3 PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.7 PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 105ofPage Section Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.7 PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 106ofPage Section Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.2.6 ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable C403.2.13 ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable C403.2.3 ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.6. 1 ME59]1 Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow 3,000 cfm. Complies Does Not Not Observable Not Applicable C403.2.6. 2 ME115]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable C403.2.7 ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). Complies Does Not Not Observable Not Applicable C403.2.8 ME116]3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Complies Does Not Not Observable Not Applicable C403.2.9 ME60]2 HVAC ducts and plenums insulated. Where ducts or plenums are installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C403.2.9 ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 107ofPage Section Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.4.4. 6 ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C408.2.2. 1 ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable C403.5, C403.5.1, C403.5.2 ME123]3 Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 108ofPage Section Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 3 FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C403.2.2 FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable C403.2.4. 1 FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1.2 FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable C403.2.4. 1.3 FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable C403.2.4. 2 FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable C403.2.4. 2.1, C403.2.4. 2.2 FI40]3 Automatic Controls: Setback to 55°F heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable C403.2.4. 2.3 FI41]3 Systems include optimum start controls. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 109ofPage Section Req.ID Final Inspection Complies?Comments/Assumptions C408.2.1 FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.3. 1 FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable C408.2.3. 2 FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable C408.2.4 FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.5. 1 FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.2.5. 3 FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable C408.2.5. 4 FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: New Respite Care Facility 160 Aviation Road 05/05/20Reportdate: 1010ofPage