A190505 - Mechanical COMcheck-Web_compliance_report_20200505_121813_987COMcheck Software Version COMcheckWeb
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Glens Falls, New York
Climate Zone:6a
Construction Site:
160 Aviation Road
Queensbury, New York 12804
Owner/Agent:
Tim Bartlett
United Cerebral Palsy Association of
the Tri-Counties, Inc.
22 Corporate Woods Blvd 5th Floor
Albany, New York 12211
518-703-0549
t_bartlett@cfdsny.org
Designer/Contractor:
Fusion Systems Engineering, DPC
634 Plank Road, Suite 203B
Clifton Park, New York 12065
5186210533
Project Information
Energy Code:
New Respite Care Facility 160 Aviation Road
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Central Furnace, Gas, Capacity = 40 kBtu/h
Proposed Efficiency = 96.00% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Split System, Capacity = 24 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception:
None
Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER
Fan System: F-1 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Single-Zone VAV, 805 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade
1 HVAC System (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 60 kBtu/h
Proposed Efficiency = 96.30% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Split System, Capacity = 42 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception:
None
Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER
Fan System: F-2 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes
Fans:
F-2 SUPPLY FAN Supply, Single-Zone VAV, 1415 CFM, 0.8 motor nameplate hp, 0.0 fan efficiency grade
1 HVAC System (Single Zone):
Heating: 1 each - Central Furnace, Gas, Capacity = 40 kBtu/h
Proposed Efficiency = 96.50% Et, Required Efficiency: 80.00 % Et or 78% AFUE
Cooling: 1 each - Split System, Capacity = 30 kBtu/h, Air-Cooled Condenser, No Economizer, Economizer exception:
None
Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER
Fan System: F-3 SUPPLY FAN -- Compliance (Motor nameplate HP method) : Passes
Fans:
F-3 SUPPLY FAN Supply, Single-Zone VAV, 1015 CFM, 0.5 motor nameplate hp, 0.0 fan efficiency grade
1 HVAC System (Single Zone):
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
101ofPage
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
102ofPage
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version COMcheckWeb
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
103ofPage
Section
Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C403.2.4.
5,
C403.2.4.
6
FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
104ofPage
Section
Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.7
PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
C404.7
PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
105ofPage
Section
Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.7
PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
106ofPage
Section
Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C403.2.13
ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
C403.2.3
ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.6.
1
ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
C403.2.6.
2
ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
C403.2.7
ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
C403.2.8
ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9
ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9
ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.3
ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.3
ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.3
ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
107ofPage
Section
Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.4.4.
6
ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.4.4.
6
ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.4.4.
6
ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C408.2.2.
1
ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
C403.5,
C403.5.1,
C403.5.2
ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
108ofPage
Section
Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
3
FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C403.2.2
FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.2
FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.3
FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2
FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.1,
C403.2.4.
2.2
FI40]3
Automatic Controls: Setback to 55°F
heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.3
FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.3
FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.3
FI41]3
Systems include optimum start
controls.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
109ofPage
Section
Req.ID
Final Inspection Complies?Comments/Assumptions
C408.2.1
FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
1
FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
2
FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
C408.2.4
FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
3
FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
4
FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
New Respite Care Facility 160 Aviation Road 05/05/20Reportdate:
1010ofPage