ResCheck 0 GComplianceenerated by REScheck-Web Software
Certificate
Project Cerrone Builders Inc
Energy Code: 2018 IECC
Location: Glens Falls, New York O �` Q
C�
Construction Type: Single-family - 2Q Z
Project Type: / lIUT'
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
5 Apres Circle Daniel W. Ryan P.E.
Queensbury, NY 12804 PO Box 596
Glens Falls, NY 12801
dryan@dwrpe.com
Compliance: Passes using UA trade-off
Compliance: 0.8%Better Than Code Maximum UA: 255 Your UA: 253
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or R-Value R-Value U-Factor UA
Perimeter
Ceiling: Raised or Energy Truss 1,632 49.0 0.0 0.020 33
Wall: Wood Frame, 16" o.c. 1,557 21.0 0.0 0.057 76
Door: Solid Door(under 50%glazing) 18 0.140 3
Door 1: Solid Door(under 50%glazing) 20 0.240 5
Door 2: Glass Door(over 50%glazing) 40 0.290 12
Window: Vinyl Frame 152 0.290 44
Floor: All-Wood Joist/Truss 12 30.0 0.0 0.033 0
Basement 2: Solid Concrete or Masonry 1,065 0.0 13.0 0.049 52
Wall height: 8.8'
Depth below grade: 7.8'
Insulation depth: 8.8'
Window 2: Vinyl Frame 6 0.400 2
Basement 1: Solid Concrete or Masonry 413 19.0 0.0 0.044 17
Wall height: 8.8'
Depth below grade: 7.8'
Insulation depth: 8.8'
Door: Solid Door(under 50%glazing) 18 0.240 4
Window 1: Vinyl Frame 16 0.290 5
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 1 of10
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandat uire n listed in the REScheck Inspection Checklist.
Daniel W. Ryan P.E. ` I 6/5/20
Name-Title Signat e Date
ENGINEERS STAMP:
1 ��p NEt,V�`
...
*c9 c), , 1 1-*
0
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 2 of10
REScheck Software VersionChecklist: REScheck-Web
0
Energy Code: 2018 [ECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, Construction drawings and ❑Complies
103.2 documentation demonstrate ❑Does Not
[PR1]1 energy code compliance for the
building envelope.Thermal ['Not Observable
envelope represented on ENot Applicable
construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ❑Not Observable
V Systems serving multiple ❑Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: EComplies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
[PR2]z on loads calculated per ACCA Cooling: Cooling: [Not Observable
,, Manual J or other methods Btu/hr Btu/hr
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 3 of10
Section Plans Verified Field Verified
# Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies
[FO4]1 insulation R-value.Where interior R- R- ❑Does Not table for values.
insulation is used,verification
may need to occur during ❑Not Observable
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[FO5]1 insulation installed per ❑Does Not
manufacturer's instructions.
['Not Observable
❑Not Applicable
402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies
[FO6]1 insulation depth of burial or ❑Does Not table for values.
distance from top of wall. ❑Not Observable
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies
[FO11]2 to protect exposed exterior ❑Does Not
insulation and extends a
minimum of 6 in. below grade. ❑Not Observable
❑Not Applicable
403.9 Snow-and ice-melting system ❑Complies
[FO12]2 controls installed. EDoes Not
r ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 4 of10
•
Section Plans Verified Field Verified
# Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ['Not Observable
❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ElDoes Not table for values.
402.3.3,
402.5 [Not Observable
[FR2]1 ❑Not Applicable
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑Does Not
with the NFRC test procedure or [Not Observable
taken from the default table.
❑Not Applicable
402.4.1.1 Air barrier and thermal barrier EComplies
[FR23]1 installed per manufacturer's ❑Does Not
instructions. ❑Not Observable
❑Not Applicable
402.4.3 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish ❑Does Not
and labeled to indicate <_2.0 cfm
leakage at 75 Pa. ['Not Observable
❑Not Applicable
403.3.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is ❑Does Not
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and ❑Not Observable
return ducts in other portions of ENot Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter.
403.3.2 Ducts, air handlers and filter OComplies
[FR13]1 boxes are sealed with ❑Does Not
joints/seams compliant with
International Mechanical Code or ['Not Observable
International Residential Code, as ❑Not Applicable
applicable.
403.3.5 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
['Not Observable
• ❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 5 of10
Section Plans Verified Field Verified
# Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
403.3.7 Ducts declared to be within the EComplies
[FR28]3 conditioned space are either 1) ❑Does Not
completely within the continuous
air barrier and within the building ❑Not Observable
thermal envelope, 2) buried ❑Not Applicable
within ceiling insulation in
accordance with Section
R403.3.6 and the air handler is
located completely within the
continuous air barrier and within the building thermal envelope
and the duct leakage is <= 1.5
cfm/100 square feet of
conditioned floor area served by
the duct system, or 3)the ceiling
insulation R-value installed
against and above the insulated
duct >= to the proposed ceiling
insulation R-value, less the R-
value of the insulation on the
403.4 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 4F or chilled fluids ❑Does Not
below 55°F are insulated to
3 ['Not Observable
❑Not Applicable
403.4.1 Protection of insulation on HVAC ❑Complies
[FR24]' piping. ❑Does Not
❑Not Observable
[Not Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
❑Not Observable
❑Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]2 installed on all outdoor air ❑Does Not
intakes and exhausts.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 6 of10
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 All installed insulation is labeled ❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided.
sj [Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
['Nip ❑ Steel ❑ Steel ❑Not Observable
4 ❑Not Applicable
303.2, Floor insulation installed per ❑Complies
402.2.7 manufacturer's instructions and ❑Does Not
[IN2]1 in substantial contact with the
4underside of the subfloor, or floor ❑Not Observable
framing cavity insulation is in ❑Not Applicable
contact with the top side of
sheathing, or continuous
insulation is installed on the
underside of floor framing and
extends from the bottom to the
top of all perimeter floor framing
members.
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ['Not Observable
[IN3]1 exterior,the exterior insulation
d requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
['Not Observable
ENot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 7 of10
•
Section Plans Verified Field Verified
Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel ❑ Steel ❑Not Observable
402.2.E[FI1]1 DNot Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. ❑Does Not
[FI2]1 Blown insulation marked every
300 ft2. ❑Not Observable
❑Not Applicable
402.2.3 Vented attics with air permeable ❑Complies
[FI22]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
extends over insulation. ❑Not Observable
❑Not Applicable
402.2.4 Attic access hatch and door R- R- ❑Complies
[FI3]1 insulation >_R-value of the ❑Does Not
adjacent assembly.
[Not Observable
ONot Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = DComplies
[FI17]1 ach in Climate Zones 1-2, and ❑Does Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
❑Not Applicable
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[FI27]1 determine air leakage with ft2 ft2 EDoes Not
either: Rough-in test: Total
leakage measured with a ENot Observable
pressure differential of 0.1 inch ENot Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g.across the entire system
including the manufacturer's air
handler enclosure.
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[F1411 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in ['Not Observable
tests, verification may need to ENot Applicable
occur during Framing Inspection.
403.3.2.1 Air handler leakage designated ❑Complies
[FI24]1 by manufacturer at <=2%of ❑Does Not
design air flow.
['Not Observable
ENot Applicable
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed for control of primary ❑Does Not
heating and cooling systems and
initially set by manufacturer to ['Not Observable
code specifications. ❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[F110]2 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
403.5.1 Circulating service hot water ❑Complies
[F1ll]2 systems have automatic or ❑Does Not
accessible manual controls.
❑Not Observable
ENot Applicable
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 8 of10
Section Plans Verified Field Verified
Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
403.6.1 All mechanical ventilation system ❑Complies
[FI25]2 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy
and air flow limits per Table [Not Observable
R403.6.1. ❑Not Applicable
403.2 Hot water boilers supplying heat ❑Complies
[F126]2 through one-or two-pipe heating ❑Does Not
systems have outdoor setback
control to lower boiler water ['Not Observable
temperature based on outdoor ❑Not Applicable
temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply ❑Not Observable
pipe.Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 Electric heat trace systems ❑Complies
[F129]2 comply with IEEE 515.1 or UL ❑Does Not
515.Controls automatically
adjust the energy input to the ['Not Observable
heat tracing to maintain the ❑Not Applicable
desired water temperature in the
piping.
403.5.2 Demand recirculation water ❑Complies
[F130]2 systems have controls that ❑Does Not
manage operation of the pump
and limit the temperature of the ❑Not Observable
water entering the cold water ❑Not Applicable
piping to <= 1044F.
403.5.4 Drain water heat recovery units ❑Complies
[F131]2 tested in accordance with CSA ❑Does Not
B55.1. Potable water-side
pressure loss of drain water heat ❑Not Observable
recovery units < 3 psi for ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
404.1 90%or more of permanent ❑Complies
(FI6]' fixtures have high efficacy lamps. ❑Does Not
❑Not Observable
❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[F123]3 no continuous pilot light. ❑Does Not
[Not Observable
❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
[FI7]2 ❑Does Not
['Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact (Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 9 of10
•
Section Plans Verified Field Verified
Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
systems have been provided.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Cerrone Builders Inc Report date: 06/05/20
Data filename: Page 10 of10
• .
2018 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 13.00
Floor 30.00
Ceiling / Roof 49.00
Ductwork (unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.29
Door 0.29
Heating&Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments