Loading...
BINS-006709-2018 09182018INSPECTION WORKSHEET (BINS-006709-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:Case Module: RC-0182-2018Permit Inspection Date:Inspection Status: 09/18/2018Partial Pass Inspector:Inspection Type: John O'BrienBuilding Foundation Job Address:Parcel Number: 10 WOOD POINT LN239.18-1-21 Lake George, NY 12845 Contact TypeCompany NameName ApplicantBonacio Construction, Inc., Primary OwnerMAGICAL SHORE ACRES LLC, Granted PermissionCrasto, Anil ContractorBonacio Construction, Inc., Primary OwnerCrasto, Anil Checklist ItemPassedComments Building Inspector NotesNOPartial footings only. Need to provide updated specs. Partial footing approved 8 17 18. 8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) 9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. FootingsNO PiersNO Monolithic SlabNO Reinforcement in PlaceNO Sep 18, 2018Page (1) INSPECTION WORKSHEET (BINS-006709-2018) Checklist ItemPassedComments Reinforcement in PlaceYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Foundation / WallpourYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Dowels or Keyway in placeYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls Foundation DampproofingNO Foundation WaterproofingYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) Footing Drain Daylight or SumpNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Drain Stone - 12 inch widthNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Sep 18, 2018Page (2) INSPECTION WORKSHEET (BINS-006709-2018) Checklist ItemPassedComments Footing Drain Stone - 6 inches above footingNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Drain stone - 6 mil polyNO9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Backfill ApprovalYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) 9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Plumbing Under SlabNO PVC / Cast / CopperNO Foundation Insulation Interior / ExteriorYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) Rough Grade 6 inch drop within 10 ft.NO Poly Under SlabNO O'Brien, John (Inspector) Sep 18, 2018Page (3)