BINS-008204-2018 11212018INSPECTION WORKSHEET (BINS-008204-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0182-2018Case Module:Permit
Inspection Date:Wed Nov 21, 2018Inspection Status:Partial Pass
Inspector:Charles DyerInspection Type:Building Foundation
Job Address:10 WOOD POINT LNParcel Number:239.18-1-21
Lake George, NY 12845
Contact TypeCompany NameName
Granted PermissionCrasto, Anil
ApplicantBonacio Construction, Inc.
ContractorBonacio Construction, Inc.
Primary OwnerCrasto, Anil
Primary OwnerMAGICAL SHORE ACRES LLC
Checklist ItemPassedComments
Nov 21, 2018Page (1)
INSPECTION WORKSHEET (BINS-008204-2018)
Checklist ItemPassedComments
Building Inspector NotesNOPartial footings only. Need to provide updated specs. Partial
footing approved 8 17 18.
8/23/18 Foundation Walls Partial Approval
-Kitchen Crawl Space Foundation Walls
9/5/18 Foundation Walls Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
9/12/18 Foundation Waterproofing, 1" Foam Board and
Backfill Approved
- New crawl space walls and mechanical and storage
foundation walls(2" Foam Board on Wall)
9/17/18 Foundation Drain Not Approved.
- Unable to verify drainage bank washed in due to water line
being hit above area to be backfilled. Clean out effected area
of all mud and rocks up against foundation wall and call for
recheck.
9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
9/28/18 Footings Partial Approval
-Sauna, whirlpool, gym, bathroom, and lower level living
room footings and interior haunches.
-Mechanical Rm, and New Crawl Space Floor(Poly & 2"
Foam Board)
10/5/18 Foundation Walls Partial Approval-Lower Living
Room Frost Walls
10/9/18 Foundation Frost Wall Insulation-2" Foam
-Lower living room frost walls.
10/18/18 Foundation Walls Partial Approval-Balance of
Lower Living Area Frost Walls.
10/18/18 Footings Partial Approval-Wine Cellar Area
10/23/18 Balance of Foundation Insulation, Dampproofing
and Backfill Approved-Lower Level Living Area Sauna Area
FootingsYES9/28/18 Footings Partial Approval
-Sauna, whirlpool, gym, bathroom, and lower level living
room footings and interior haunches.
-Mechanical Rm, and New Crawl Space Floor(Poly & 2"
Foam Board)
10/18/18 Footings Partial Approval-Wine Cellar Area
PiersNO
Nov 21, 2018Page (2)
INSPECTION WORKSHEET (BINS-008204-2018)
Checklist ItemPassedComments
Monolithic SlabNO
Reinforcement in PlaceYES8/23/18 Foundation Walls Partial Approval
-Kitchen Crawl Space Foundation Walls
9/5/18 Foundation Walls Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
10/5/18 Foundation Walls Partial Approval-Lower Living
Room Frost Walls
10/18/18 Foundation Walls Partial Approval-Balance of
Lower Living Area Frost Walls.
10/29/18 foundation wall prior to glass room, verified rebar as
per schedule
Foundation / WallpourYES8/23/18 Foundation Walls Partial Approval
-Kitchen Crawl Space Foundation Walls
9/5/18 Foundation Walls Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
10/5/18 Foundation Walls Partial Approval-Lower Living
Room Frost Walls
10/18/18 Foundation Walls Partial Approval-Balance of
Lower Living Area Frost Walls.
Reinforcement in PlaceYES9/28/18 Footings Partial Approval
-Sauna, whirlpool, gym, bathroom, and lower level living
room footings and interior haunches.
-Mechanical Rm, and New Crawl Space Floor(Poly & 2"
Foam Board)
10/18/18 Footings Partial Approval-Wine Cellar Area
Footing Dowels or Keyway in placeYES8/23/18 Foundation Walls Partial Approval
-Kitchen Crawl Space Foundation Walls
10/5/18 Foundation Walls Partial Approval-Lower Living
Room Frost Walls
Foundation DampproofingNO10/23/18 Balance of Foundation Insulation, Dampproofing
and Backfill Approved-Lower Level Living Area Sauna Area
Nov 21, 2018Page (3)
INSPECTION WORKSHEET (BINS-008204-2018)
Checklist ItemPassedComments
Foundation WaterproofingYES9/12/18 Foundation Waterproofing, 1" Foam Board and
Backfill Approved
- New crawl space walls and mechanical and storage
foundation walls(2" Foam Board on Wall)
Footing Drain Daylight or SumpNO9/17/18 Foundation Drain Not Approved.
- Unable to verify drainage bank washed in due to water line
being hit above area to be backfilled. Clean out effected area
of all mud and rocks up against foundation wall and call for
recheck.
9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
Footing Drain Stone - 12 inch widthNO9/17/18 Foundation Drain Not Approved.
- Unable to verify drainage bank washed in due to water line
being hit above area to be backfilled. Clean out effected area
of all mud and rocks up against foundation wall and call for
recheck.
9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
Footing Drain Stone - 6 inches above footingNO9/17/18 Foundation Drain Not Approved.
- Unable to verify drainage bank washed in due to water line
being hit above area to be backfilled. Clean out effected area
of all mud and rocks up against foundation wall and call for
recheck.
9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
Footing Drain stone - 6 mil polyNO9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
Nov 21, 2018Page (4)
INSPECTION WORKSHEET (BINS-008204-2018)
Checklist ItemPassedComments
Backfill ApprovalYES9/12/18 Foundation Waterproofing, 1" Foam Board and
Backfill Approved
- New crawl space walls and mechanical and storage
foundation walls(2" Foam Board on Wall)
9/17/18 Foundation Drain Not Approved.
- Unable to verify drainage bank washed in due to water line
being hit above area to be backfilled. Clean out effected area
of all mud and rocks up against foundation wall and call for
recheck.
9/18/18 Foundation Drain and Backfill Partial Approval
-tie in to existing foundation at Bedroom #2 Walk In Closet to
F7 at Powder Room.
10/9/18 Foundation Frost Wall Insulation-2" Foam
-Lower living room frost walls.
10/23/18 Balance of Foundation Insulation, Dampproofing
and Backfill Approved-Lower Level Living Area Sauna Area
Plumbing Under SlabYES11/8/18
PVC / Cast / CopperYESPVC
Foundation Insulation Interior / ExteriorYES9/12/18 Foundation Waterproofing, 1" Foam Board and
Backfill Approved
- New crawl space walls and mechanical and storage
foundation walls(2" Foam Board on Wall)
9/28/18 Footings Partial Approval
-Sauna, whirlpool, gym, bathroom, and lower level living
room footings and interior haunches.
-Mechanical Rm, and New Crawl Space Floor(Poly & 2"
Foam Board)
10/9/18 Foundation Frost Wall Insulation-2" Foam
-Lower living room frost walls.
10/23/18 Balance of Foundation Insulation, Dampproofing
and Backfill Approved-Lower Level Living Area Sauna Area
Rough Grade 6 inch drop within 10 ft.NO
Nov 21, 2018Page (5)
INSPECTION WORKSHEET (BINS-008204-2018)
Checklist ItemPassedComments
Poly Under SlabYES9/28/18 Footings Partial Approval
-Sauna, whirlpool, gym, bathroom, and lower level living
room footings and interior haunches.
-Mechanical Rm, and New Crawl Space Floor(Poly & 2"
Foam Board)
Lowest level lakeside with 2" foam
Dyer, Charles (Inspector)
Nov 21, 2018Page (6)