Loading...
BINS-008204-2018 11212018INSPECTION WORKSHEET (BINS-008204-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0182-2018Case Module:Permit Inspection Date:Wed Nov 21, 2018Inspection Status:Partial Pass Inspector:Charles DyerInspection Type:Building Foundation Job Address:10 WOOD POINT LNParcel Number:239.18-1-21 Lake George, NY 12845 Contact TypeCompany NameName Granted PermissionCrasto, Anil ApplicantBonacio Construction, Inc. ContractorBonacio Construction, Inc. Primary OwnerCrasto, Anil Primary OwnerMAGICAL SHORE ACRES LLC Checklist ItemPassedComments Nov 21, 2018Page (1) INSPECTION WORKSHEET (BINS-008204-2018) Checklist ItemPassedComments Building Inspector NotesNOPartial footings only. Need to provide updated specs. Partial footing approved 8 17 18. 8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) 9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 9/28/18 Footings Partial Approval -Sauna, whirlpool, gym, bathroom, and lower level living room footings and interior haunches. -Mechanical Rm, and New Crawl Space Floor(Poly & 2" Foam Board) 10/5/18 Foundation Walls Partial Approval-Lower Living Room Frost Walls 10/9/18 Foundation Frost Wall Insulation-2" Foam -Lower living room frost walls. 10/18/18 Foundation Walls Partial Approval-Balance of Lower Living Area Frost Walls. 10/18/18 Footings Partial Approval-Wine Cellar Area 10/23/18 Balance of Foundation Insulation, Dampproofing and Backfill Approved-Lower Level Living Area Sauna Area FootingsYES9/28/18 Footings Partial Approval -Sauna, whirlpool, gym, bathroom, and lower level living room footings and interior haunches. -Mechanical Rm, and New Crawl Space Floor(Poly & 2" Foam Board) 10/18/18 Footings Partial Approval-Wine Cellar Area PiersNO Nov 21, 2018Page (2) INSPECTION WORKSHEET (BINS-008204-2018) Checklist ItemPassedComments Monolithic SlabNO Reinforcement in PlaceYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 10/5/18 Foundation Walls Partial Approval-Lower Living Room Frost Walls 10/18/18 Foundation Walls Partial Approval-Balance of Lower Living Area Frost Walls. 10/29/18 foundation wall prior to glass room, verified rebar as per schedule Foundation / WallpourYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 9/5/18 Foundation Walls Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 10/5/18 Foundation Walls Partial Approval-Lower Living Room Frost Walls 10/18/18 Foundation Walls Partial Approval-Balance of Lower Living Area Frost Walls. Reinforcement in PlaceYES9/28/18 Footings Partial Approval -Sauna, whirlpool, gym, bathroom, and lower level living room footings and interior haunches. -Mechanical Rm, and New Crawl Space Floor(Poly & 2" Foam Board) 10/18/18 Footings Partial Approval-Wine Cellar Area Footing Dowels or Keyway in placeYES8/23/18 Foundation Walls Partial Approval -Kitchen Crawl Space Foundation Walls 10/5/18 Foundation Walls Partial Approval-Lower Living Room Frost Walls Foundation DampproofingNO10/23/18 Balance of Foundation Insulation, Dampproofing and Backfill Approved-Lower Level Living Area Sauna Area Nov 21, 2018Page (3) INSPECTION WORKSHEET (BINS-008204-2018) Checklist ItemPassedComments Foundation WaterproofingYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) Footing Drain Daylight or SumpNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Drain Stone - 12 inch widthNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Drain Stone - 6 inches above footingNO9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Footing Drain stone - 6 mil polyNO9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. Nov 21, 2018Page (4) INSPECTION WORKSHEET (BINS-008204-2018) Checklist ItemPassedComments Backfill ApprovalYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) 9/17/18 Foundation Drain Not Approved. - Unable to verify drainage bank washed in due to water line being hit above area to be backfilled. Clean out effected area of all mud and rocks up against foundation wall and call for recheck. 9/18/18 Foundation Drain and Backfill Partial Approval -tie in to existing foundation at Bedroom #2 Walk In Closet to F7 at Powder Room. 10/9/18 Foundation Frost Wall Insulation-2" Foam -Lower living room frost walls. 10/23/18 Balance of Foundation Insulation, Dampproofing and Backfill Approved-Lower Level Living Area Sauna Area Plumbing Under SlabYES11/8/18 PVC / Cast / CopperYESPVC Foundation Insulation Interior / ExteriorYES9/12/18 Foundation Waterproofing, 1" Foam Board and Backfill Approved - New crawl space walls and mechanical and storage foundation walls(2" Foam Board on Wall) 9/28/18 Footings Partial Approval -Sauna, whirlpool, gym, bathroom, and lower level living room footings and interior haunches. -Mechanical Rm, and New Crawl Space Floor(Poly & 2" Foam Board) 10/9/18 Foundation Frost Wall Insulation-2" Foam -Lower living room frost walls. 10/23/18 Balance of Foundation Insulation, Dampproofing and Backfill Approved-Lower Level Living Area Sauna Area Rough Grade 6 inch drop within 10 ft.NO Nov 21, 2018Page (5) INSPECTION WORKSHEET (BINS-008204-2018) Checklist ItemPassedComments Poly Under SlabYES9/28/18 Footings Partial Approval -Sauna, whirlpool, gym, bathroom, and lower level living room footings and interior haunches. -Mechanical Rm, and New Crawl Space Floor(Poly & 2" Foam Board) Lowest level lakeside with 2" foam Dyer, Charles (Inspector) Nov 21, 2018Page (6)