BINS-000975-2019 02152019INSPECTION WORKSHEET (BINS-000975-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0072-2018 Case Module:Permit
Inspection Date:Fri Feb 15, 2019 Inspection Status:Partial Pass
Inspector:Charles Dyer Inspection Type:Building Insulation
Job Address:Parcel Number:119 SEELYE RD
Queensbury, NY 12804
227.17-1-49
Contact Type Company Name Name
Architect Dybas, Curtis
Granted Permission Giordano, Victoria
Primary Owner Giordano, Victoria
Granted Permission Giordano, Ken
Primary Owner Giordano, Ken
Applicant Giordano, Ken
Engineer Environmental Design Partnership, LLC
Checklist Item Passed Comments
Feb 15, 2019 Page (1)
INSPECTION WORKSHEET (BINS-000975-2019)
Checklist Item Passed Comments
Building Inspector Notes NO 2/14/19 Insulation Not Approved
Remaining Items:
- Provide an updated REScheck for spray foam insulation.
- Seal all narrow stud bays or cracks between studs, around
receptacles and switches, ductwork and at the top and
bottom plates where foam is missing.
- Install Roxul Rock wool insulation equal to the ceiling R
value with a vapor barrier at fireplace chimney 2nd floor.
- Basement Insulation not done.
- Provide certified field report from foam insulation contractor
listing type of foam, R Values and thickness for ceilings, walls
and box sill areas.
- Accessible areas larger than 32 sf will need intumescent
coating applied to foam insulation not covered by 1/2"
sheetrock.
2/15/19 insulation approved
Rock wool and vapor barrier at chimney not installed at time
of inspection, please leave an area open so this can be
verified.
Basement partially insulated, call for inspection when ready.
Window Sealing NO
U Factors = .3 cfm for windows, .5 cfm for doors NO
Tyvek or Similar Exterior Sealant NO
Proper Vent, Attic Vent NO
Feb 15, 2019 Page (2)
INSPECTION WORKSHEET (BINS-000975-2019)
Checklist Item Passed Comments
Insulation Residential Check Commercial Check NO 2/14/19 Insulation Not Approved
Remaining Items:
- Provide an updated REScheck for spray foam insulation.
- Seal all narrow stud bays or cracks between studs, around
receptacles and switches, ductwork and at the top and
bottom plates where foam is missing.
- Install Roxul Rock wool insulation equal to the ceiling R
value with a vapor barrier at fireplace chimney 2nd floor.
- Basement Insulation not done.
- Provide certified field report from foam insulation contractor
listing type of foam, R Values and thickness for ceilings, walls
and box sill areas.
- Accessible areas larger than 32 sf will need intumescent
coating applied to foam insulation not covered by 1/2"
sheetrock.
Blower Door Test NO
Combustion Air Supply for Furnace NO
Fresh air supply 3' from grade NO
Duct Insulation - if required in unheated spaces NO
Door / Window Sealed (No Insulation)NO
Air Barrier behind Knee Walls NO
Tub Shower R-20 with Vapor Barrier NO
All Ductwork Sealed Return and Supply NO
Duct Blaster Test for duct work, R-8 NO
All Return Air Hard Duct Work NO
Feb 15, 2019 Page (3)
INSPECTION WORKSHEET (BINS-000975-2019)
Checklist Item Passed Comments
House Wrap Taped at all Seams NO
Feb 15, 2019 Page (4)
Dyer, Charles (Inspector)