Loading...
BINS-000975-2019 02152019INSPECTION WORKSHEET (BINS-000975-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0072-2018 Case Module:Permit Inspection Date:Fri Feb 15, 2019 Inspection Status:Partial Pass Inspector:Charles Dyer Inspection Type:Building Insulation Job Address:Parcel Number:119 SEELYE RD Queensbury, NY 12804 227.17-1-49 Contact Type Company Name Name Architect Dybas, Curtis Granted Permission Giordano, Victoria Primary Owner Giordano, Victoria Granted Permission Giordano, Ken Primary Owner Giordano, Ken Applicant Giordano, Ken Engineer Environmental Design Partnership, LLC Checklist Item Passed Comments Feb 15, 2019 Page (1) INSPECTION WORKSHEET (BINS-000975-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/14/19 Insulation Not Approved Remaining Items: - Provide an updated REScheck for spray foam insulation. - Seal all narrow stud bays or cracks between studs, around receptacles and switches, ductwork and at the top and bottom plates where foam is missing. - Install Roxul Rock wool insulation equal to the ceiling R value with a vapor barrier at fireplace chimney 2nd floor. - Basement Insulation not done. - Provide certified field report from foam insulation contractor listing type of foam, R Values and thickness for ceilings, walls and box sill areas. - Accessible areas larger than 32 sf will need intumescent coating applied to foam insulation not covered by 1/2" sheetrock. 2/15/19 insulation approved Rock wool and vapor barrier at chimney not installed at time of inspection, please leave an area open so this can be verified. Basement partially insulated, call for inspection when ready. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Feb 15, 2019 Page (2) INSPECTION WORKSHEET (BINS-000975-2019) Checklist Item Passed Comments Insulation Residential Check Commercial Check NO 2/14/19 Insulation Not Approved Remaining Items: - Provide an updated REScheck for spray foam insulation. - Seal all narrow stud bays or cracks between studs, around receptacles and switches, ductwork and at the top and bottom plates where foam is missing. - Install Roxul Rock wool insulation equal to the ceiling R value with a vapor barrier at fireplace chimney 2nd floor. - Basement Insulation not done. - Provide certified field report from foam insulation contractor listing type of foam, R Values and thickness for ceilings, walls and box sill areas. - Accessible areas larger than 32 sf will need intumescent coating applied to foam insulation not covered by 1/2" sheetrock. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Air Barrier behind Knee Walls NO Tub Shower R-20 with Vapor Barrier NO All Ductwork Sealed Return and Supply NO Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO Feb 15, 2019 Page (3) INSPECTION WORKSHEET (BINS-000975-2019) Checklist Item Passed Comments House Wrap Taped at all Seams NO Feb 15, 2019 Page (4) Dyer, Charles (Inspector)