Loading...
2007-676 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 4E Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF COMPLIANCE Permit Number: P20070676 Date Issued: Monday, March 26, 2012 This is to certify that work requested to be done as shown by Permit Number P20070676 has been completed. Tax Map Number: 523400-309-009-0002-001-000-0000 Location: 200 LUZERNE Rd Owner: HOMESTEAD VILLAGE L P Applicant: HOMESTEAD VILLAGE L P This structure may be occupied as a: Septic Alteration Commercial By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the /f property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development- Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20070676 Application Number. A20070676 Tax Map No: 523400-309-009-0002-001-000-0000 Permission is hereby granted to: HOMESTEAD VILLAGE L P For property located at: 200 LUZERNE Rd in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: HOMESTEAD VILLAGE L P 4294 ROUTE 5 Septic Alteration Commercial CALEDONIA, NY 14423 Total value Contractor or Builder's Name/Address Electrical Inspection Agency SANITARY SEWER DAN DRELLOS PO BOX 224 GLENS FALLS NY Plans &Specifications 2007-676 septic alteration commercial (lots 7 & 8) $35.00 PERMIT FEE PAID- THIS PERMIT EXPIRES: Thursday,November 06, 2008 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Teens ry; pes ay,November 06,2007 r SIGNED BY ILf' ✓'' r'. for the Town of Queensbury. Director of Building Code nforcement .............................w...r...............ww:_wrwrr .....r:w..% r._...................., . OFFICE USE ONLY TAX MAP NO. PERMIT NO. ERMiT F 0 APPROVALS: ZONING TOWN CLERK APPLICATION FOR SEPTIC DISPOSAL SYSTEM PERMIT: A PERMIT M46T BE OBTAINED BEFORE WORK BEGINS.APPLICATION IS SUBJE TO REVIEW BEFORE ISSUANCE OF A VALID PERMIT. OWNER f � INSTALLER':" � �✓"z-� ADDRESS:Z ADDRESS: PHONE NOS. 2 q i6:' J PHONE NOS. LOCATION OF INSTALLATION: L-0 7- 7 f 1Y ....... .__......... .»........................................... .............................................................................................,....................................................................... RESIDE INFORMATION. g NO.OF ( _ ` TOTAL DAILY FLOW RESIDENCE YEAR BUILT BEDROOMS X COMPUTATION i . ....._..................-........„......................................................................................................................... ...._;........,........................................................................... GARBAGE GRINDER 1980 or older X 150 gallon per bedroom i 1 i INSTALLED? ...-1981--1991 .... .......... X.. .....i30�galion per,bedroom......�...........�....,..,..,.....,,................................................... SPA OR HOT TUB F ..a.....................................................................�.........;.........,.......,..,........,..............................,.,.......i INSTALLED? . 1992 present.._........................................X. ...,.1..0galion,pe..bedroom........f..=..<...., ...................................................... PARCEL INFORMATION: A'S ✓ TOPOGRAPHY: FLAT ROL NG STEEP SLOPE %SLOPE ✓ SOIL NATURE:SAND LOAM CLAY OTHER ✓ GROUNDWATER: AT WHAT DEPTH? BEDROCKIIMPERVIOUS MATERIAL: AT WHAT DEPTH? ✓ DOMESTIC TI WATER UPLY: MUNICIPAL ZELL (IF WELL:WATER SUPPLY FROM ANY SEPTIC-SYSTEM ABSORPTION IS FT. 1 ✓ PERCOLATION TEST: RATE IS PER MIINUTE PER INCH (TEST TO BE COMPLETED BY A LICENSED PROFESSIONAL ENGINEER OR ARCHITECT) PROPOSED SYSTEM FOR NEW CONSTRUCTION: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size of the septictank and leach field for each garbage grinder, spa or whirlpool tub. ✓ SEPTIC TANK: 1 v GALLON (MIN. SiZE IS 1,000 GAL.) TILE FIELD: EACH TRENCH FT. ✓ TOTAL SYSTEM LENGTH: Z�LFT. SEEPAGE PIT(S): HOW MANY? ✓ SIZE OF EACH FT. X FT. ✓ SIZE OF STONE TO BE USED: # /DEPTH OR THICKNESS !�y FT. ✓ BED SYSTEM SIZE: X ✓ ALTERNATIVE SYSTEM: LENGTH ANDIOR SIZE ✓ HOLDING TANK SYSTEM:(if required) NO. OF TANKS: —I SIZE OF EACH ✓ GALLONS.IITOTAL CAPACITY. GAL. ......................:.................:.........:.................................................................................:...................,.,.,.,.,.,....:......................,.:.:.:.......................,.:.,.:.,.:.,...,.:.,.,.:.,.,.,.,.:.:.,.:.:...:.:,,.:...:.:.:.,.,.:.:.,.......................................,................. ;: Irl NOTE: ALARM SYSTEM AND ASSOCIATED ELECTRICAL WORK MUST BE INSPECTED BY A TOWN i ll APPROVED ELECTRICAL INSPECTION AGENCY. PLEASE REVIEW LIST PROVIDED. J �,.,,,:,�, ,„•..............................:.:.:.:.:.:............................. ..:•:.,.,.:.,,,.:,:.:.;.,,:.,,:.,.,.,.,.:.,.:.,.,.,.:.:.,.,.:,:.,.,.:.:_::.:.:.:.:.:..:.:.:.:.:.:,:.:.:.:..:.:.:,.,.,.:.,.:.,.:.:,,.,.:.,.:.,.:.:•,•:.,..:•:.:..:.:,:.,.:.:.:.:.,,,,:.,.:.:.,.,.:.,.,,:.,.:.,.,,,.,.,.,.,.,.,.,. „.,,,.,.,.,.,.,. For your protection, please note that pursuant to Section 136-29 of the Code of the Town of Queensbury, any permit or approval granted Which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void. i have read the regulations with respect to this application and agree to abide by these and all requirements of the Town of QUESTIONS 7 CALL codes 6 aueenabureburY, OR EMAIL .net Queensbury Sanitary a age Disposal Ordinance. VISIT OUR WEBSITE FOR MORE iNFORMATIQN -�0 —0-7 www.aueensburv.net S nature of Per, Responsible Date '• Town of Queensbury ■ Community Development Office • 742 Bay Road, Queensbury, NY 12804 t Septic InspectioeRe Office No. (518) 761-8256 Date Ins Cn —�-�----�� Queensbury Building&Code Enforcement Arrive: = am742 Bay Rd., Queensbury, NY 12804 InspecWWs InNAME:LOCATION: RECHECK: Comn.on".saindLgr dWgram Soil Type: Sand/ Loam Clay Type of Water: Municipal Well WaterX' Waterline separation distance ft. Well separation distance ft. Other wells: ft. Well Casing Length 50' +/- Y N N/A 150'to well Legg red If NO Absor tion Field: Total lengthft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank Tank to Distribution Box Distribution Box to Field Pit Opening Sealed: Y N End Cap Y N Inlet/Outlet Pipes&Baffles Y N Manholes 12"or less below grade Y N [provide extension collar if Yes Y N Location Separations Foundation to tank ft. Foundation to absorption ft. Separation of Pits ft. Conforms as per Plot Plan N Engineer Report and As-Built Y N ETU Maintenance Contract Y_ N provided Location of System on Property: Front r Left Side Right Side Middle Front Middle Rear stem s S Approved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved UNPam Whiting\2010NWIlding Codes FormsVnspecdon Forms\septic Inspection Report_03 2910.doc gi i I� IIgg ��JJ EI!NiN1fElITAL DESIGN PARTNERSHIP,LLP March 23, 2012 Queensbury Building& Code Enforcement TpF ✓�vf\- 742 Bay Road * Queensbury,NY 12804 ' Attn: John O'Brien Re: Homestead Village Mobile Home Park Lots 7 & 8 Windsong Dear John: To complete some missing file information I have researched our installation records for the referenced Homestead Village property. The original design plan date was June 22, 2007 and the installation was conducted on November 2, 2007. In February of 2008 EDP prepared an existing conditions plan which reflected a revision to the original design plan made during the November 2007 installation. On November 2, 20071 visited the above referenced Homestead Village Mobile Home Park lot. The purpose of this visit was to observe the installation of the new septic system designed by EDP dated June 22, 2007. Based on my review of the plans and observation of the installation it is my opinion that the installation of the system is in compliance with the intent of the design plans. Note that a revision to the design plan was made with the addition of a new 1250 gallon septic tank replacing the existing tank. An `existing conditions plan' is attached which reflects the revised installation at the time of the construction Please contact me should you have any questions regarding this system. Sincerely, �EN}►�'� MA CE�—Z.l!DY Dennis J.MacElroy,PE Attachment Cc:Homestead Village g00 Route 146,Clifton Park,New York 12065 phone(518)371-7621 -fax(518)371-9540 11-7 Septic Inspection Report Office No. (518) 761-8256 Date Inspection req st ei Queensbury Building&Code Enforcement Arrive: a /p epart: am/pm 742 Bay Rd., Queensbury, NY 12804 nspector's Initial . NAME: 1 P IT NO.: 11/1-7 LOCATION: i7 PECT ON: -�J=Lzl RECHECK: t copJ'`.��'rc /�--- COMM ntsle%rdiagram Soil Type: Sand Loam Clay nge of Water: Municipal Well Water ,p I Waterline separation distance ft. 1 Well separation distance ft. Other wells: ft. 1/ —Well Casing Len th 50' + - Y N_N/A... `J Absorption Field: Total lengt h Length of each trench ft. Depth of trenches ft. Size of Stone Seeoge Pits: Number Size: x Stone Size: Piping Size T Building to tank Tank to Distribution Box Distribution Box to Field Pit Opening Sealed: Y N End Cap Y N Inlet/Outlet Pi s&Baffles Y N Location Separations Foundation to tank Foundation to absor tion tion of Pits ft. Conforms as per lot Plan En ineer Re rt and -Built Y L System on Property: Front Rear Left Side Right Side Middle Front Middle Rear SvstemS� Approved lease call the Building &Codes Office Partial Approved and needs to be re-inspected, p Disapproved Last revised 06118/07 L:\Building&Codes Forms-OLDWilding&Codes\Inspection Forms\Sepbc Inspection ReporLdoc Septic Inspection Report Office No. (518) 761-8256 Date In on est e' CJ d Queensbury Building&Code Enforcement Arrive: % rt: am 742 Bay Rd., Queensbury, NY 12804 Inspector's Inid ` NAME: ��) C S f lJ y, ( ((ac t�I MIT NO.: r V LOCATION: t y i S 7 �- I J�•��S SPECT ON: 26-7 RECHECK: Comments and/or diagram Sail T : Sand m Cla -Typeof units I/Well Water Waterline separation distance 1 ft. Well separation distance ft. Other wells: 141 Absorption Field: Total len ft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size Type Building to tank Tank to Distribution Box + Distribution Box to Feld Pit i Opening Sealed: Y N Partial 14 � End Ca In Outlet Pipes&Baffles Y N Location Separations Foundation to tank ft. Foundation to absorption ft. Separation of Pits ft. Conforms as per Plot Plan Y Engineer Report and As-Built Y N Location of System on Property: ��� Front Rear Left Side Right Side Middle Front Middle Rear System Use Status: ppro al Approved and needs to be re-inspected, please call the Building&Codes Office sapproved Last revised 021006 Last revised 1/6/05 INSPECTION REQUIREMENTS BORING AND PERCOLA TION TEST- ENGINEER OF RECORD TO INSPECT TRENCHES PRIOR TO BACKFILLING. TEST PERFORMED ON JUNE 18, 2007 0-1' TOPSOIL 1 '-6' DRY YELLOW SAND NO EVIDENCE OF WATER OR MOTTLING PERCOLATION RATE APPROXIMA TEL Y ONE MINUTE SEP TIC DESIGN: APPLICATION RATE = 1.2 GAL./SF/DAY 6 BEDROOMS TOTAL 6 BEDROOMS AT 100 GALLONS/BEDROOM =600 GALLONS USE 1250 GALLON PRECAST TANK USE 5 LINES A T 50 FT. EA CH (SPA CED 6 FT. ON—CEN TER) EXI.S77NG 1000 GALLON SEPTIC TANK CONSTRUCTION NOTES' 1) CONSTRUCTION OF ABSORPTION FACILITIES SHALL NOT OCCUR WHEN THE GROUND IS FROZEN OR PROPOSED 4" PVC SDR -35 THE SOIL MOISTURE CONTENT IS HIGH. IF A FRAGMENT OF SOIL FROM APPROXIMATELY NINE INCHES BELOW THE SURFACE CAN EASILY BE ROLLED INTO A RIBBON INSTEAD OF CRUMBLING, THE (GASKETED BELL) AT 1X MIN. MOISTURE CONTENT IS TOO HIGH FOR CONSTRUCTION PURPOSES. OBVIOUSLY, SOME SILT OR CLAY F E N C E MUST BE PRESENT FOR A RIBBON TO BE FORMED. 2) TRENCH LOCATIONS ANC DEPTHS SHOULD BE MARKED BY STAKES BEFORE TRENCHES ARE EXCAVATED. THE NATURAL SURFACE SHALL NOT BE SIGNIFICANTLY DISTURBED. IF THE SITE IS REGRADED OR SIMILARLY DISTURBED, THE SOIL SHALL BE ALLOWED TO STABILIZE O.E., SETTLE NATURALLY FOR A PERIOD OF AT LEAST SIX MONTHS, INCLUDING AT LEAST ONE FREEZE-THAW r^ }� CYCLE) AND NEW PERCOLATION AND DEEP HOLE TESTS CONDUCTED. HEAVY EQUIPMENT USE IN THE DESIGNATED ABSORPTION SYSTEM AREA SHOULD BE MINIMIZED TO PREVENT SOIL PERMEABILITY REDUCTION DUE TO COMPACTION PLUS POSSIBLE TRENCH CAVE-IN AND DISTRIBUTION PIPE MISALIGNMENT/BREAKAGE. I I I I 3) AFTER A FINAL GRADE CHECK, TRENCH EXCAVATION MAY BEGIN. TRENCH DEPTH SHALL BE .AS SHALLOW AS POSSIBLE, BUT NOT LESS THAN 18 INCHES. TRENCHES SHALL BE EXCAVATED TO EXISTING TREES TO BE REMOVED DESIGN DEPTH WITH BOTTOM' PRACTICALLY LEVEL. PROPOSED DISTRIBUTION BOX #2 o f I I I �^ 4) FOLLOWING EXCAVATION, THE TRENCH BOTTOMS SHOULD BE GRADED BY HAND. THE BOTTOMS OF (SEE DETAIL - SHEET 2) I I P.T. I I THE TRENCHES SHOULD BE CHECKED BY A TRANSIT, ENGINEER'S LEVEL, OR CARPENTER'S LEVEL TO ASSURE THAT EACH IS PRACTICALLY LEVEL. TRENCH BOTTOMS AND SIDEWALLS SHOULD BE 0 2 I I I I * IMMEDIA TEL Y RAKED AFTER FINAL GRADING AND A T LEAST SIX INCHES OF AGGREGA TE PLACED IN � O I I I THE TRENCHES. z W I i I I w 5) GRAVITY DISTRIBUTOR PIPE SHALL BE CAREFULLY INSTALLED AT A SLOPE OF %6 TO %32 INCH PER LOT 9 X m I I I I 2 z LOT 6 FOOT. PRESSURE OR DOSED DISTRIBUTOR PIPE SHALL BE INSTALLED LEVEL. GRADES SHALL BE w _ DETERMINED BY AN ENGINEER'S LEVEL, TRANSIT OR CARPENTER'S LEVEL. AN EASY METHOD OF M I I I W MEASURING THE 1iB INCH PER FOOT SLOPE FOR DISTRIBUTOR PIPE IS TO TAPE A Y4 INCH BLOCK TO PAD J I ONE END OF A STRAIGHT FOUR FOOT BOARD. BY PLACING THE BLOCKED END WITH THE BLOCK I I m O FACING DOWN ON THE DOWNSTREAM TOP OF THE DISTRIBUTOR PIPE, A CARPENTER'S LEVEL CAN BE I I p USED TO DETERMINE THE %6 INCH PER FOOT SLOPE. A %B INCH BLOCK SIMILARLY USED WOULD Z W RESULT IN A Y32 INCH PER FOOT SLOPE. ANOTHER METHOD USED TO ESTABLISH THE GRADE OF r I I I N M DISTRIBUTOR PIPE IS BY BATTER BOARDS. AGGREGATE SHALL Be INSTALLED IN THE TRENCHES TO _ w M A DEPTH OF AT LEAST TWO INCHES ABOVE THE TOP OF THE DISTRIBUTOR PIPES. ADDITIONAL L 1 AGGREGATE MAY BE REQUIRED TO BRING THE TOP OF THE AGGREGATE TO WITHIN SIX TO 12 INCHES OF FINAL GRADE. 6) AFTER THE UPPER AGGREGATE IS PLACED IN THE TRENCHES, THE GEOTEXTILE, UNTREATED BUILDING I PAPER, HAY OR STRAW IS TO BE IMMEDIATELY INSTALLED ON THE AGGREGATE AND THE TRENCH LOT 8 LOT 7 - BACKFlLLED WITH EXCAVATED SOIL. IF THE TRENCHES CANNOT BE IMMEDIA TEL Y BACKFILLED, THE "- TRENCHES SHOULD BE TEMPORARILY COVERED WITH AN IMPERVIOUS MATERIAL, SUCH AS TREATED W PARKING cWi BUILDING PAPER TO PREVENT SIDEWALL COLLAPSE AND SILTATION INTO THE AGGREGATE. AREA I _ I~ �I PROPOSED ABSORPTION FIELD 7) THE EARTH BACKFILL IS TO BE MOUNDED SLIGHTLY ABOVE THE ORIGINAL GROUND LEVEL O.E., NOT 3 w 4 LINES AT 63 FT. EA. r-- COMPACTED) TO ALLOW FOR SETTLING. FOLLOWING SETTLEMENT, THE ENTIRE AREA SHOULD BE 31 (SEE DETAIL - SHEET 2) GRADED WITHOUT THE USE OF HEAVY EQUIPMENT AND SEEDED WITH GRASS. HEAVY EQUIPMENT c SHALL NOT ENTER THE AN5gM0RIQ/STA7H�VgpRR '0X��ROPOSED EXPANSION AREA AFTER THE SUBSURFACE SEWAGE TREATMEjb[Ek0,(1€ft*fR�* UCTED. y.�.t WINDSONG DR/ TOWN OF QUEENSBURY Date lane for,7' � .°? VE !% BUILDING & CO p Car�.�t•�� SSE lb! Reviewed By � a / are hereby Approved by: A4 SHEE OF ,�pr the State Commissioner of Health 053 33� SEP TIC DESIGN PREPARED FO � L O T 7 & 8 WINDSONG DRI VE" HOMES TEA VILLA GE I TOWN OF QUEENSBUR Y WARREN COUNTY, NEW YORK NO TE: SCALE: 1 " = 20' JUNE 22, 2007 MOBILE HOME UNITS TO BE PLACED WITH A MIN/MU ENVIRONMENTAL DESIGN PARTNERSHIP LLP M 10 FT. HORIZONTAL SEPARATION. 900 ROUTE 146 CLIFTON PARK, N.Y. 12065 (518) 371-7621 ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING JAMES E. MI TCHELL P.E. 53,337 TOPSOIL FOR SETTLING I=1 1=� 11=1 I —II I I—III 1= -IIII-IIII= -IIII— -IIII—IIII, I I I—IIII—IIII TERRATEX NO. 2 NONWOVEN —IIII— CONSTRUCTION FABRIC OR -I I EARTH IIII: —IIII= EARTH I- UNTREATED BUILDING PAPER BACKFILL -IIII=I BACKFILL IIII OR STRAW I I-I 11=1 I I I I-IIII- III=1 I I t= =IIII= Jill = III=1 = = 1 TOP OF AGGREGATE 4" PVC MIN. TO BE WITHIN O OO O OO 670 C 6"-12" OF SURFACE 8 O RAKE ANY PERFORATIO OINT c 2 SMEARED TRENCH O� WALLS 0�00 O OC�j �[� CRUSHED STONE OR GROUNDWATER BEDROCK WASHED GRAVEL OR IMPERVIOUS LAYER -Y4" TO 1)/2" CROSS SECTIONAL VIEW LONGITUDINAL VIEW TERRATEX NO. 2 NONWOVEN CONSTRUCTION FABRIC NTREATED BUILDING PAPER OR PERMEABLE GEOTEXTILE OR 4" LAYER OF STRAW =IIII=IIII' IIII _IIII-11 III' �_ I= 0 0 O� OO o 0 0 0 0 FLOW PROVIDE CAPS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o ON LINE ENDS 13 0 6 00 O SLOPE PIPE Jf•"->z" PER FT. SPACING OF ABSORPTION TRENCH 6' O.C. TRENCH BOTTOM TO BE NEAR LEVEL AND RAKED TRENCH PROFILE ABSORPTION TRENCH DETAIL a: NOT TO SCALE r E r v GRADE NOTE: z I. PIPE JOINTS TO BE SEALED WITH ASPHALTIC MATERIALS OR EQUIVALENT. z 12' MIN REMOVABLE COVER -7 2. INVERT ELEVATIONS OF ALL a. OUTLET PIPES MUST BE EQUAL. 2 PAVEMENT OR J. THE SLOPE OF OUTLET PIPES ORIGINAL GROUND BETWEEN THE DISTRIBUTION BOX ' • AND THE DISTRIBUTOR LATERALS • • SHOULD BE 118" PER FOOT. __ WHERE TRENCH SHIELD IS USED Uzi i i—,; BAFFLE- WITH THE APPROVAL OF THE I— SELECTED GRANULAR FILL TO IIA.O.B.E. = AS ORDERED BY ENGINEER INVERTI ENGINEER, SHEETED TRENCH I BE PLACED UNDER PAVEMENT INLET 2"MIN ELEV. PAYMENT LIMITS WILL APPLY. NOTE: CONTRACTORS MUST COMPLY WITH ALL 1 1 LOCAL, STATE, & FEDERAL SAFETY REGULATIONS. ALL BACKFILL MATERIAL TO BE TRENCH SLOPES ARE GIVEN FOR (OSHA & N.Y.S. D.O.T.) O O O OUTLET CONTRACTOR TO USE SPEED LEVELERS PLACED IN 8" LIFTS AND MAX. PAYMENT LIMITS ONLY FOR BE COMPACTED TO 95% STANDARD 3 PEN CUT AND ARE NOT INTENDED 3 EQUALIZE SUPPLIED FORT MILLER TO � TO REPRESENT STABLE SLOPES NOT INTENDED TO REPRESENT :., a. PROCTOR (ASTM D698). I"-5 DEBRIS, FROZEN MATERIAL, LARGE I UNDER FIELD CONDITIONS. A SAFE SLOPE — CLODS OR STONES, ORGANIC MATTER, OR OTHER UNSUITABLE I _ 6" WIDE GREEN PLASTIC LOCATOR TAPE, o MATERIALS SHALL NOT BE - I MARKED "CAUTION SEWER BELOW" 12" MI N USED AS BACKFILL. CLEAN SAND OR PEA GRAVEL TRACER WIRE #8 THNN STRANDED COPPER OR STAINLESS STEEL SELECTED GRANULAR FILL PLACED IN 6" LIFTS AND MECHANICALLY TAMPED OR *'� `' "� : •'=` fig' * #2 DISTRIBUTION BOX ' A.O.B.E. SEE NOTES 1&2. �' ; `,�. `` er v RE 2" THICK RIGID POLYSTYRENE INSULATION 4 LOCATIONS WITH LESS THAN 4' COVER NOT TO SCALE CRUSHED STONE OR SELECT ' ) ENT OF t1EAL.TH GRANULAR MATERIAL AS ORDERED �� EXTEND TO MIN. 4' BELOW GRADE. NEW YOR(STATE DEPARTMENT c: BY ENGINEER (MECHANICALLY _ _ Gies Fella District TAMPED) OR A.O.B.E. SEE NOTE 2. 6" MIN. FOR PIPE 12" DIA. AND SMALLER roved date and slip llYtO. O a FOR UNSTABLE TRENCH BOTTOM USE flfat � �P J 33 ADDITIONAL DEPTH OF STONE AS 12" MIN. FOR PIPE 14" DIA. AND LARGER NECESSARY TO PROVIDE A FIRM FOUNDATION. WHERE A WATER TABLE CONDITION EXISTS SHEET 2 OF 2 STONE BEDDING SHALL BE WRAPPED IN A SA NI TAR Y DE TA IL S FOR ON-WOVEN CEO-TEXTILE ENVELOPE (FABRIC EQUIVALENT TO AMOCO 4545) Q' 1)TENATIVE EXCAVATED GRANULAR MATERIAL 2) CRUSHED STONE NOT TO EXCEED #2 IN LOT 7 & 8 WINDSONG DRI VE MAY BE USED IF APPROVED BY THE SIZE. GRANULAR FILL TO MEET THE HOMESTEAD VILLAGE ENGINEER. FOLLOWING REQUIREMENTS: o o IN EXCESS of 3" TOWN OF QUEENSBURY WARREN COUNTY, NEW YORK 25 %-75% PASSING #4 SIEVE 0 %-15% PASSING #200 SIEVE SCALE: 1 " = 20' JUNE 22, 2007 TRENCH DETAIL ENVIRONMENTAL DESIGN PARTNERSHIP, LLP NOT TO SCALE 900 ROUTE 146 CLI FTON PARK, N.Y. 12065 (518) 371-7621 ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING JAMES E. MI TCHELL P.E. 53.337