Loading...
pressurization calcs KOHRS LONNEMANN HEIL ENGINEERS,INC • FT.THOMAS,KENTUCKY LEXINGTON,KENTUCKY ENGINEERSLOUISVILLE,KENTUCKY COLUMBUS,OHIO NEW YORK,NEW YORK 800.354.9783 W W W.KLHENGRS.COM Date: 6/23/2020 John O'Brien Code Enforcement Officer Re: Permit Review#CC-0217-2020 FILE COPY Starbucks 1454 State Route 9 Lake George, NY KLH Job Number: 22219 To Whom It May Concern, In response to the plan review corrections pertaining to the application for permit for the project listed above, we respectfully submit the following responses (in blue italics): Plan Review Comments As per my discussion with David Hatin Director of Building & Codes the response regarding. the required make air for the 300 cfm of exhausted air may still create negative pressure. Please provide 300 cfm of make air for the exhausted air and provide an addendum showing how you will address. Response:Please refer chart below showing our building pressurization. Also note, the roof top units have code required pressure relief with power exhaust accessory on the unit. BUILDING PRESSURIZATION CALCULATION EQUIPMENT OUTSIDE AIR EXHAUST AIR TOTALS RTU-1 768 768 RTU-2 281 281 EF-1 -300 -300 Building Totals 1049 -300 749 If we can provide you any further information regarding the above, please contact us at your convenience. Respectfully, Adam Pulskamp Regional Director Kohrs Lonnemann Heil Engineers, Inc. Page 1 of 1