Loading...
359.92 RESOLUTION APPROVING VARIANCE FROM REQUIRED SEWER CONNECTIONS FOR DOROTHY C. CHARTIER RESOLUTION NO.: 359, 92 INTRODUCED BY: Mrs. Susan Goetz WHO MOVED ITS ADOPTION SECONDED BY: Mr. Nick Caimano WHEREAS, the Town Board of the Town of Queensbury is authorized, pursuant to § 136-44.1 of the Code of the Town of Queensbury, to, upon request, waive the sewer connection requirement of § 136-44 thereof or vary the time in which such connection must be made, provided that certain standards and criteria or conditions are met or demonstrated and provided that a certain procedure is followed, and WHEREAS, in granting a variance or waiver, the Town Board may consider one or all of the following circumstances: (a) The distance from the building to the town sewer pipeline to which connection is required. (b) The cost of the connection. (c) The existence or nonexistence of any physical obstructions. (d) The financial loss to be sustained by the property owner in the event of nonuse of the current system. (e) Whether the current sewage disposal system is properly functioning. (f) Whether any rights-of-way or easements are needed in order for the applicant to make the connection to the town sewer system. (g) Whether strict application of the connection requirement of § 136-44 would result in a specified difficulty to the applicant, for which the applicant has not been given a reasonable time to respond to or address, and whether the variance or waiver would be materially detrimental to the purposes of the sewer connection requirement or that the property and the district in which the property is located or otherwise conflict with the description or objections of the plan or policy of the town and that the interests of justice are served. and WHEREAS, if the Town Board finds any or all of the above circumstances or conditions, the Town Board may grant the following relief: (a) In the event that circumstances giving rise to the request are due to physical obstructions, costs significantly greater than the usual sewer connection costs, a distance greater than two hundred fifty (250) feet from the sewer pipeline to the building or structure to be connected or a documented inability to obtain an easement or right-of-way over which the sewer line must pass in order to connect to the town sewer system, the Town Board may grant a permanent waiver from the requirement that the applicant connect the subject property, provided that the sewage disposal system currently serving the property is operational, in accordance with the Town of Queensbury laws and regulations and appropriate New York State agency rules and regulations, and (b) In the event that the circumstances giving rise to the request are due to excessive costs of connection, the financial loss to be sustained by the property owner in the event of nonuse of the current system or any other specified difficulty which makes it difficult or impractical for the applicant to connect to the town sewer system and the applicant is willing to pay the full and usual sewer rents or taxes accruing against the property, the Town Board may grant an extension of time, not exceeding two (2) years, in which to connect to the town sewer system, provided that the sewage disposal system currently serving the property is operational, in accordance with the Town of Queensbury laws and regulations and appropriate New York State agency rules and regulations, and WHEREAS, Dorothy C. Chartier previously applied to the Town Board of the Town of Queensbury for a variance and relief from that part of the law requiring sewer connections upon the grounds that: In excess of 250 feet - house is on northern side of property - septic system is on north side of property and WHEREAS, the applicant previously indicated that: The septic system - 1,000 gallon plus leach has no problems - use has always been by one person - owner, and WHEREAS, a notice of public hearing was given in the official newspaper of the Town of Queensbury and a public hearing was held in connection with the variance request on July 6, 1992, and WHEREAS, the Town Board has received a report from Michael Shaw, Wastewater Superintendent, NOW, THEREFORE, BE IT RESOLVED, that the Town Board hereby grants a permanent variance, so long as the current sewage disposal system is properly functioning, and BE IT FURTHER RESOLVED, that the reasons the variance is granted are as follows: (a) The distance from the building to the town sewer pipeline to which connection is required. (b) The cost of the connection. (c) The existence or nonexistence of any physical obstructions. (d) The financial loss to be sustained by the property owner in the event of nonuse of the current system. (e) Whether the current sewage disposal system is properly functioning. (f) Whether any rights-of-way or easements are needed in order for the applicant to make the connection to the town sewer system. (g) Whether strict application of the connection requirement of § 136-44 would result in a specified difficulty to the applicant, for which the applicant has not been given a reasonable time to respond to or address, and whether the variance or waiver would be materially detrimental to the purposes of the sewer connection requirement or that the property and the district in which the property is located or otherwise conflict with the description or objections of the plan or policy of the town and that the interests of justice are served. Duly adopted this 6th day of July, 1992, by the following vote: AYES: Mr. Caimano, Mr. Tucker, Mrs. Monahan, Mrs. Goetz, Mr. Brandt NOES: None ABSENT:None