Loading...
SRA Field Observation Report 2Evergreen Professional Park 453 Dixon Road, Ste. 7, Bldg. 3 Queensbury, NY 12804 Tel. (518) 761-0417 Fax (518) 761-0513 DATE of VISIT: 7-17-20 PROJECT: South Queensbury Fire Department – Storage Building PROJECT NO.: 18-389 WEATHER: Cloudy 70’s PRESENT ON SITE: Shaun M. Rivers - Schoder Rivers Kevin Guilfoyle - Ridgewood Homes Inc. FIELD OBSERVATION REPORT NO. 2 ITEM NO. OBSERVATION ACTION TO BE TAKEN (BOLD TYPE) DATE COMPLETED 1.Rough framing is pretty much complete. Walls and roof are sheathed. Truss tie downs are installed. Modified fly rafter detail was installed. Remaining items are noted below and were reviewed with Kevin. NA 2.The two overhead door openings only have single king studs instead of the two specified.Talked to Kevin about this and this was being corrected as I left. Completed 7-14. 3.The gable end wall bracing at the approximate ¼ points of the wall length were not installed. The center bracing was installed. The bracing at the ¼ points does not require a strongback since it is shorter.Install the bracing at these locations per the detail on Drawing S-2. 4.The two hold-downs at the north shear wall need to be installed. 5.The web bracing installed on the two center truss diagonals need to be terminated.Install two diagonal 2x6’s equally spaced at each location per the Typical Diagonal Bracing Detail to Stabilize Truss Compression Members on Drawing S-3. Distribution: Via Email: John O’Brien – Town of Queensbury Marcus Young – Rozell Industries John Harrington – South Queensbury Fire Department