Loading...
Signed Inspection Report (07-28-2020) (19).pdfINSPECTION WORKSHEET (FRM-003879-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:AST-0211-2020 Case Module:Permit Inspection Date:Tue Jul 28, 2020 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Building Framing Job Address:Parcel Number:409 DIX AVE Queensbury, NY, 12804 303.16-1-6 Contact Type Company Name Name Framing Contractor Ridgewood Homes Applicant Schroder Rivers Associates Engineer Schroder Rivers Associates Granted Permission Rozell Industries Inc. Primary Owner South Queensbury Volunteer Fire Co Contractor Rozell Industries Inc. Electrical Contractor Sweet Electric Contractor O'Leary Overhead Door Contractor Precise Painting Insulation Contractor Snyder's Drywall Checklist Item Status Building Inspector Notes Passed 7/16/20 Framing Partial Approval - Ice & Water Shield Approved - Fly rafter detail approved(Verified straps and blocking nailing as per Shaun Rivers detail) 7/28/20 Framing Approved - Storage Building - Received Engineer's Final Framing Inspection Approval Jul 28, 2020 Page (1) INSPECTION WORKSHEET (FRM-003879-2020) Checklist Item Status Framing Passed 7/16/20 Framing Partial Approval - Ice & Water Shield Approved - Fly rafter detail approved(Verified straps and blocking nailing as per Shaun Rivers detail) 7/28/20 Framing Approved - Storage Building - Received Engineer's Final Framing Inspection Approval Attic Access 22 x 30 minimum Passed Jack Studs Headers Passed Truss Specification Provided Passed Bracing Bridging Passed Hurricane Clips/Uplift Screws/Nail Holes Filled Passed Exterior sheeting nailed properly Passed 12 O.C.Passed Anchor Bolts 6 ft. or less on center Passed Ice and water shield 24 inches from wall Passed 7/16/20 Framing Partial Approval - Ice & Water Shield Approved - Fly rafter detail approved(Verified straps and blocking nailing as per Shaun Rivers detail) Jul 28, 2020 Page (2) INSPECTION WORKSHEET (FRM-003879-2020) Checklist Item Status Design Professional Sign-off, if required Passed 7/28/20 Framing Approved - Storage Building - Received Engineer's Final Framing Inspection Approval Jul 28, 2020 Page (3) O'Brien, John