Loading...
Signed Inspection Report (08-10-2020) (3).pdfINSPECTION WORKSHEET (FDTN-004073-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0255-2020 Case Module:Permit Inspection Date:Mon Aug 10, 2020 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Building Foundation Job Address:Parcel Number:12 HALL RD EXT Queensbury, NY, 12804 289.11-1-17 Contact Type Company Name Name Applicant Leonardo, Adam Applicant Leonardo, Rebecca Contractor Rosewood Home Builders Engineer VanDeLoo, Walter Primary Owner Leonardo, Rebecca Granted Permission Rosewood Home Builders Primary Owner Leonardo, Adam Checklist Item Status Building Inspector Notes Failed 7/16/20 footings and 3 piers approved 7/20/20 frost walls approved, provide a stamped updated foundation plan showing the changes made at the frost walls. 7/27/20 foundation walls approved. Provide a stamped updated foundation plan showing the changes at the frost walls. 7/28/20 foundation damp proofing and footing drain approved 8/4/20 onsite for plumbing under slab, observed cracks in foundation walls, homeowner onsite at time of inspection and is aware of situation and has had engineer onsite for repairs, advised to submit details to building department. Footings Passed Aug 10, 2020 Page (1) INSPECTION WORKSHEET (FDTN-004073-2020) Checklist Item Status 8" x16" footings approved Piers Passed 24"x 24" x12" piers approved with 2 #4 rebar each direction Monolithic Slab Failed Reinforcement in Place Passed 2 rows of #4 rebar continuous, vertical dowels to be wet set Foundation / Wallpour Passed 7/20/20 frost walls approved, provide a stamped updated foundation plan showing the changes made at the frost walls. 7/27/20 foundation walls approved Reinforcement in Place Passed 7/20/20 frost walls only: one row of # 4 rebar continuous at top of wall. 2 rows of #4 rebar one at top, one at center of wall continuous Masonry Wall Failed Reinforcement in Place Failed Footing Dowels or Keyway in place Passed #4 rebar 48" on center Foundation Dampproofing Passed 7/28/20 Foundation Waterproofing Failed Aug 10, 2020 Page (2) INSPECTION WORKSHEET (FDTN-004073-2020) Checklist Item Status Footing Drain Stone - 6 inches above footing Passed Provide stone @ footings as discussed prior to applying footing drain 7/22/20 returned to verify placement of interior and exterior footing drains Footing Drain stone - 6 mil poly Failed Plumbing Under Slab Passed Holding with water PVC / Cast / Copper Passed PVC Foundation Insulation Interior / Exterior Passed Verified 2" foam @ interior of frost wall 7/22/20 Rough Grade 6 inch drop within 10 ft.Failed Poly Under Slab Passed With wire mesh approved 8/10/20 Aug 10, 2020 Page (3) Dyer, Charles