Loading...
2005-294 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development- Building &Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number. P20050294 Date Issued: Thursday, August 31, 2006 This is to certify that work requested to be done as shown by Permit Number P20050294 has been completed. Tax Map Number. 523400-301-009-0001-041-000-0000 Location: 19 WESTERN RESERVE Trl Owner. WESTERN RESERVE, LLC Applicant- WESTERN RESERVE, LLC This structure may be occupied as a: Garage - 3 Cars Attached By order of Town Board Single Family Dwelling TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code kLynforcent Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20050294 Application Number: A20050294 Tax Map No: 523400-301-009-0001-041-000-0000 Permission is hereby granted to: WESTERN RESERVE. LLC For property located at: WESTERN RESERVE Trl in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: WESTERN RESERVE, LLC 395 BIG BAY Rd Garage-3 Cars Attached QUEENSBURY NY 12804-0000 Single Family Dwelling $250,000.00 Total Value $250,000.00 Contractor or Builder's Name / Address Electrical Inspection Agency HAYES CONSTRUCTION GROUP LLC 395 BIG BAY Rd OiJEENSBITRY. NY 12804-0000 Plans&Specifications 2005-294 1880 SQ FT SINGLE FAMILY DWELLING WITH 3-CAR ATTACHED GARAGE $288.60 PERMIT FEE PAID -THIS PERMIT EXPIRES: Tuesday, August 08, 2006 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town o Quee bury 0 gust 08, 2005 SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement Check Residential Plan Review: One& Two Family Dwellings Y1NIN/A (2)Full sets of plans Over 1,500 sq. fl.—Stamped Design Loads On Plans:90 Wind Floor Loads 40 psf 70 Ground Snow Load Sleeping Areas and Attics 30 psf Calculations: Window Schedule With Glass Size Door Schedule/Main Entrance 36"Door Emergency Escape Or Bedrooms and Habitable Space Above/Below grade,5.7 sq.ft. / Grade,5.0 sq.ft. 24"(h)x 20"(w)min. ✓ 44"Max.Height above floor Residential Check Paperwork Compliance and Inspectors Checklist: OK Dampproofing/Waterproofing Materials On Plans Foundation Drainage On Plans,if required 6"Drop in 10'Exterior Grade Framing Cross Section For Each Roof Line,Vertical Fire Stopping Every 10'Where Required Ice and Snow shield 24"Inside Exterior Wall/24"Inside Knee Walls Platforms At Exterior Doors Stairway Headroom 6' 8'All Stairs 36"Width Stair Run and Rise Winder Run and Rise Spiral Not Allowed From 2d Story Smoke Detectors Battery Backup and Proper Location Bathroom Fixtures Proper Clearance Hall Width,36"min. Handrails More Than One Riser On Open Sides Railing and Guards>30"/Basement Stairs Included/Closed Risers More Than 4"in Ht. Safety Glazing Notes Foir Required Areas WN Garage Fire Separation Garage Floor Sloped Attic Access Roof over 30"—22"x 30"/Crawl Spaces 18"x 24"Access Carbon Monoxide Detector Lowest Sleeping Level Soil Test Results, if required Septic To Well Or Water Line Separation All Paperwork Signed Application for Permit—Septic Disposal System Town of Queensbury 742 Bay Road Queensbury,NY 12804 (518) �61-8256 1. OWNER INFORMATION: ................................ ...................................................... ................ Office Use Location of installation: L.O-r 1D #j e3ri—F)w 041 r. ac�o�— Tax Map No. 7W/ 1: File Permit N Owner's Name: C�J eT, 1 Fee Paid .......................... .......................................................................................... Address: qj- rpic- VAY- 0'A y 2. INSTALLER'S NAME 6,-035rr- PHONE NO. 7,12 11- 3. RESIDENCE INFORMATION: (circle year of dwelling,indicate#bedroom(s) and multiply#of bedrooms with applicable gallons per bedroom to equal total daily flow) Year of House: No. of Bedrooms x _Computation = Total Dail Flow 1980 or older x 150 gal/bdrm = 1980- 1991 x 130 gal/bdrm = 1991 —present x 110 gal/bdrm = Garbage Grinder Installed yes no Spa or Hot Tub Installed yes 7 no 4., PARCEL INFORMATION: (circle applicable information&indicate measurements) Tot)am--hy 5Aj�ture Ground Water Bedrock or Impervious Material D=estip Water Su ply ,la 'san' at wh - -> offing Z q4.depth at whatdepth munici loam _L3 feet 71S' feet well Steep slope clay if well; water supply slope other from any septic-system depth: absorption is_ft. other Percolation Test: (To be completed by licensed professional engineer or architect) Rate: minute per inch <� A-rhqCAW 5. PROPOSED SYSTEM: For New Construction: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size of the septic tank and leach field for each Garbage Grinder,Spa or Whirlpool Tub. Septic Tank: U5-0-gallon (min. size 1,000 gal) PcroJS Tile Field: each trench ft. Total System'Length: ft. 1d4 C'r Seepage Pit(s): number of + size of each: _ft. by Size of Stone to be used: # depth or thickness feet, Bed System Size: x Alternative System: length and/or size 6. HOLDING TANK SYSTEM: (if required) Number of tanks: Size of each:_gallons TOTAL Capacity: gallons Note: Alarm System and associated electrical work must be inspected by a Town approved electrical inspection agency. 7. SIGNATURE &INFORMATION FOR RESPONSIBLE PERSON(please read) For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury,any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant, shall be void., I have read the regulatM' s with respect to this application and agree to abide by these and all requirements of Queensbury Sanitary Sewage Disposal Ordinance. Lx� S- ilJ� Sig itat®r of responsible person Date ''i'awet Of tZueellsbui•y • � 111�.�t)IZ�''#'1�{z� IhI I;1.,1) fiI:I'/1'ILA'I'Ita�l ItFAIIJi IMINI it's MIS rPOND Yl�f.t. tN �i�►Tf'iZ• 't14+T1tt Clef 1�l�; ~ Gt u•.w . t.,1Z F ,1 Sc t•tic. ' 11�t tft Ut'►ftt�ta#lit ' �Y3+t7R1'lla� Rohr) 7. SION A►TURE &WORMATIQN Community Development Office Town of Queensbury - 742 Bay Road - Queensbury, New York - 04 ; AA (' ryy Marilyn Ryba, Executive Director•David Hatin,Director of Building&Codes ; ', Craig Brown,Zoning Administrator•Michael J. Palmer,Fire Marshal 00 APPLICATION FOR FUEL BURNING PP LANCE 6 CHIMNEYS Application is hereby made to the Building &Codes Office for the issuance of a Building & Use Permit pursuant to the New York State Fire Prevention & Building Code. The applicant or owner agrees to comply with all applicable laws, ordinances, regulations, and all conditions that are part of these requirements and also will allow all inspectors to enter premises to perform required inspections. IMPORTANT NOTE TO APPLICANT: ROUGH-IN AND FINAL INSPECTIONS ARE REQUIRED. OWNER: 1,46 Gy O INSTALLER/BUILDER: ADDRESS: ! A ADDRESS: PHONE NOS. ? _/ ! PHONE NOS. LOCATION OF PROPERTY: ��(-��(- SUBDIVISION NAME: LOCATION OF PROPOSED CONSTRUCTION AND/OR INSTALLATION- CONTACT PERSON FOR BUILDING&CODES COMPLIANCE PHONE: FUEL BURNING APPLIANCE WOOD COAL PELLET GAS OIL INFORMATION STOVE FIREPLACE INSERT FIREPLACE, FACTORY BUILT* FIREPLACE, MASONRY FURNACE (GARAGE ONLY) *IF FACTORY BUILT, PLEASE PROVIDE: MANUFACTURER NAME: MODEL NO. LISTED BY: NUMBER: QUESTIONS? CALL 761-8205 or 761-8206 CHIMNEY INFORMATION BLOCK BRICK STONE OR EMAIL: firemarshal @ gueensbury.net MASONRY** CHECK ONE ✓ VISIT OUR WEBSITE SIZE IN FOR MORE INFORMATION TILE STEEL INCHES www.gueensbury.net FLUE CHECK ONE ✓ DOUBLE TRIPLE WALL INSULATED DIRECT VENT CHIMNEY WALL LINER CHIMNEY MATERIAL CHECK ONE ✓ **IF NON-MASONRY, PLEASE PROVIDE: MANUFACTURER NAME: MODEL NO. ADDITIONAL NOTE: CONSTRUCTION/INSTALLATION MUST CONFORM TO NYS FIRE PREVENTION&BUILDING CODE AND/OR MANUFACTURERS REQUIREMENTS. CONSULT AVAILABLE TOWN OF QUEENSBURY HANDOUTS REGARDING REQUIRED INSPECTIONS. Permit No. ' Building&Codes Office-Department of Community Development-Town of Queensbury Fee Paid 742 Bay Road,Queensbury,NY 12804 Recreation Fee SbZ D- Dave Hatin,Director codes@aueensbury.net Phone: (518) 761-8256 FAX: (518) 745-4437 Principal Structure Building Permit Application Application & Plans subject to review before issuance of a valid permit for construction. ` Instructions: A permit must be obtained before beginning construction. No inspections will be made until the applicant has received a valid building permit. All applicants' spaces on this application must be completed and must appear on the application form. ) Applicant/Builder Owner: 45 AAr - Address: M ! 1 G Address: Q o Home Phone: 7�-j2��i j¢2 Home Phone: Email Address: Email Address: Cell Phone: Cell Phone: FAX Phone: 7 12- FAX Phone: Person responsible for supervision of work with respect to building and codes compliance: /P^-(" C"1,5;-( . Address: Phone 3(o Location of proposed construction: Lot No. Legal Address: TAD Tax Map Number: Sot - J Subdivision Name: 11IG51TW44 Ki=sellecue Estimated Cost of Construction: $ 250, o v o RECEIVED Proposed construction is for: Residential Use _Commercial Use Name of Business: WN OF C�UEtNSBURY D If proposed construction is an addition,what will use of new addition be gi !g MgroDE (D C) New Addition Alteration Proposed Construction 10 Floor 2nd floor Other Total Proposed structure (Occupancy Type) Sq.Ft. sq.ff. Sq.Ft. Square feet Height Ft.&in. Single-Family Dwelling b O _O Two-Family Dwelling Townhouse Multifamily Dwelling Number of Units: Office Mercantile Manufacturing Other: Attached Gara a 1, 243 Type of Heating System: Electric, Oil, 0GasWood, orced Hot Air Baseboard, Other: If a fireplace and/or woodstove are being installed, please refer to a separate.application. Applications are subject to Zoning Administrator, Code Compliance, and Structural Plan review. The Building and Codes Office will allow commencement of your proposed project only after issuance of your permit. Declaration: Please sign below after you have carefully read the statement: To the best of my knowledge, the statements contained in the application, together with the plans and specifications submitted, are a true and complete statement of all proposed work to be done on the described' premises and that all provisions of the Building Codes, the Zoning Ordinance, and all other laws pertaining to the proposed work shall be complied with,whether specified or noted, and that such work is authorized by the owner. Further, it is understood that I/we shall submit prior to a Certificate of Occupancy or Certificate of Compliance being issued, as requested by the Zoning Administrator or Director of Building and Codes,an As-Built Survey by a licensed surveyor, drawn to scale, showing actual location of all w co t ction. Date: Z �� Applicant/Builder Signature: The application of dated is hereby approved and permission granted for the construction, reconstruction or alteration of a building/and or accessory structure as set forth above. Date: Authorized Signature: L:\Sue Hemingway\Building.Permit.FORMS\Principal Structure Permit Application.doc V:12/14/04 Framing / Firestopping Inspection Report Office No. (518)761-8256 Date inspection request received: Queensbury Building&Code Enforcement Arrive: am/pm epart: f ' �, am/pog> 742 Bay Road,Queensbury,NY 12804 Inspector's Initials: NAME: nPERMIT#: 05 - LOCATION: - n . INSPECT ON: ( ;J TYPE OF STRUCTURE: Y N N/A COMMENTS Framing Attic Access 22"x 30"minimum Jack Studs/Headers ` Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12 O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %z w 16 gauge 8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anc or Bolts 6 ft.or less on center e and water shield 24 inches from wall �'Y Fire separation 1,2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade Septic Inspection Report Office No. (518) 761-8256 Date Inspection u iv : Queensbury Building&Code Enforcement Arrive: a part: a m 742 Bay Rd., Queensbury, NY 12804 Inspector's In' " — NAME: Rt6ab _ RM NO.: LOCATION: TV NSP CT ON: PA RECHECK: Comments andlor diagram Sal T : Sand Loam Clay Type of Water: Munid I/Well Water Waterline separation distance ft. Well separation distance ft. Other wells: ft, Absorption Field: Total length ft. Length of each trench ft. Depth of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: Piping Size T Building to tank Tank to Distribution Box Distribution Box to Field Pit Opening Sealed: Y N Partial End Ca Inlet/Outlet Pipes&Baffles Y N Location Se rations Foundation to tank Foundation to absorption ft. Separation.of Pits ft. Conforms as per Plot Plan N Engineer Report and As-Built Y N Location of System on Property: Front Rear Left Side Right Side Middle Front Middle Rear Use s: Approved Partial Approved and needs to be re-inspected, please call the Building &Codes Office Disapproved Last revised 021006 Last revised 1/6/05 Queensbury Building & Code Enforcement - Residen is In 1 Inspection Office No. (518)761-8256 Arrive: e : AU- ai Date Inspection request received: Inspector's Initia s: NAME: PE IT#: Z1 LOCATION: �} "�A ATE: TYPE OF STRUCTURE: Comments Yes No N/A Building Number/Address visible from road Chimney Height/"B"Vent/Direct Vent Location Fresh Air Intake 3 inch Plumbing Vent through roof minimum 6 inches Roof Complete/Exterior Finish Complete Platform at all exterior doors Guards at stairs,decks, atios more than 30 inches above grade Guard at stairwell at 34 inches or more Guard at deck,porches 36 inches or more Handrail Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches Interior Handrails @ stairs 2 or more risers Grade away from foundation 6 inches with 10 feet 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18 inches above grade Interior privacy!trim/doors/main entrance 36 inches Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing �� ` Interior Smoke Detectors: Every level: Every Bedroom: Outside every bedroom area: Inter Connected: Battery backup: Carbon Monoxide Detector Attic access 30 inches x 22 inches x 30 inches(height)in accessible area Crawl Spaces 18 inch x 24 inch access, 1 s .ft,150 s .ft.vents Bathroom Fans,if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 s .ft. Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed/Heat Trap/Water Temp 110 Enclosed Stairs Sheetrock Underside minimum''/z"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fire roofin /3/4 hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Final Electrical Final Survey Plot Plan As Built Se tic S steD Sewer Dept.Inspection Sticker Site Plan Variance Fe uired Flood Plain Certification,if required F-0kay to issue C/C or C/O[Tem or /Permanent L:\Building&Codes Forms\Building&Codes\Inspection Forms\Residential Final Inspection Form—revised—I 00405.doc Final Survey Inspection Dept. of Community Development Town of Queensbury 742 Bay Road Queensbury,NY 12804 Date received: �O NAME: �� � - C` LOCATION:vz,�.47Ll6 PERMIT#: Final Survey Plot Plan Apgroved Denied The attached final survey has been received by the Dept.of � Community Development. Upon revi e surve be : Craig rown, Zoning Administrator Notes: L:\SueHemingway\Building.Codes.lnspection.FORMS1Finat Survey Zoning Administrator.doc POND \ \ \ £ASEMev \ '� ` l G0 GP y'4 1 77 7 t �2 �16• �J► n 7 A5 2g LOT 10 \ AREA a \ 24,480 s,q. ft. MAP REFERENCE: 0.56 acres ASPHALT DRIVE y �j WESTERN RESERVE, LLC \ o\ r' DATED: JULY 15, 2003 \ �-�� r- �i �► IL LAST REVISED: OCTOBER 8, 2004rn BY. VAN DUSEN & STEVES c cog FILED IN THE WARREN COUNTY CLERK'S OFFICE: DECEMBER 13, 2004 \ 1,500 GAL \ SEPTIC TANK —� Irk, pc�D 2�' 1° c titi w �; Ot LOT 13 !, �° r� LANDS TO BE OWNED BY THE HOMEOWNER'S ASSOCIATION \\ rcn 00, 5 S�1°'►� a th \ �6 dp ABSORPTION DISTRIBUTION BOX TRENCHES 5 = TOTAL 245 LF \ LOT 11 0111111111jor IMP", SEPTIC SYSTEM - AS BUILT •• ,�,,,,.•• ��' ���'��rit rr�t�t�i1N ►►Q���. BY NACE ENGINEERING a ei • M ALTMAIM at AW7W 7°A SJRVEY •�'( a Dus IMAU7MtlRI YAP BEAFEG A LNUM LA SJRVEYM SM a A Map of a Survey made for Scale 1'=30' ID I W MW STALE MM710M LAW S teve s momImM ° "L"sww Y YAttKEO tttiM AY DIAL t1F lIE INID 97R1E1LR4 ry Ml SL&ttMALL K WM410 m ltl IE V"7"6°PEB.' �� 1 O' LA ADQPM WESTERN RESERVE, LLC 1 MO SURVEY W"P WPM St AOCMM=W7M IM Land Surveyors L„7MR.,M A>E "*=loI1ot""a y LAID SIIRVEY77R8.SAD C£AIRICAl10Y4 SHALL RLIII qiY 70 7W MOM FM OM IM SURVEY W PIE X%lk AID I OF al NS MD F 70 iME 7171E CMINIY.ODVFAtSFI & *NET 1 169 $aviland Road Queensbury, New York 12804 AM W "'� Town of Queensbury, Warren County, New York 0 8129106 SEP77C SYSTEM AS-BUILT WESTERN RESERVE LLC (518) 792-8474 New York Lie. No. 50135 1 NO. DATE DESCRIP77ON DWG. NO. 01191-10 301.9-1-41 Buildin & Code Enforcement - Resi tia 'nal Ins ectionWQueensbury � p Office No. (518)761-8256 O Arrive: art: Z ai m�� Date Inspection request ecceeiived: Inspector s Initials: — &A�A— NAME: e' �� P IT#: LOCATION: ATE: TYPE OF STRUCTURE: Comments Yes,,,/No /A Building Number/Address visible from road ] Chimney Height/"B"Vent/Direct Vent Location C� ( Fresh Air Intake VA 3 inch Plumbing Vent throu h roof minimum 6 inches ^ Roof Complete/Exterior Finish Complete F� Platform at all exterior doors � -- Guards at stairs,decks,patios more than 30 inches above grade Guard at stairwell at 34 inches or more Guard at deck,porcbes 36 inches or more Handrail Termination Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches ` Interior Handrails @ stairs 2 or more risers Grade away from foundation 6 inches with 10 feet 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18 inches above grade Interior privacy/trim/doors/main entrance 36 inches Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety&lazing Interior Smoke De ctors: Every level: V Every Bedroorp Outside every bedroo area: J / Inter Connected: Battery backup: V/ Carbon Monoxide Detector ' Attic access 30 inches x 22 inches x 30 inches(height)in accessible area Crawl Spaces 18 inch x 24 inch access, 1 s .ft,150 s .ft.vents Bathroom Fans,if no window FloAI- CRb FNq Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 s .ft. Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed/Heat Trap/Water Terri 110 Enclosed Stairs Sheetrock Underside minimum%"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/%hour fire door/door closer �Jt Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Final Electrical Final Survey Plot Plan As Built Septic System/Sewer Dept.Inspection Sticker Site Plan /Variance required Flood Plain Certification,if required Okay to issue C/C or C/O[Temporary/Permanent L:\Building&Codes Forms\Building&Codes\Inspection Forms\Residential Final Inspec ' Form revised 100405.doc io ti ti Queensbury Building & Code Enforcement - Res Inspection,- �1, Office No. (518)761-8256 Arrive: a P art: arumm V Date Inspection request eceivcd: Inspector's Initials ,-_ NAME: PERMIT#: LOCATION: -K 4 DATE: TYPE OF STRUCTURE: Z7 ,7 Comments Yes '-N/A Building Number Address visible from road Chimney Height/"B"Vent/Direct Vent Location —ILL Fresh Air Intake Aj 3 inch Plumbing Vent through roof minimum 6 inches Roof Complete/Exterior Finish Complete Platform at all exterior doors t Guards at stairs,decks,patios more than 30 inches above grade Guard at stairwell at 34 inches or more Guard at deck,porches 36 inches or more Handrail Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches Interior Handrails @ stairs 2 or more risers Grade away from foundation 6 inches with 10 feet A 6 inch clearance to sill plate Gas Valve shut-off exposed 11 regulator 18 inches above grade Interior privacy I trim/doors/main entrance 36 inches Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing 2- Interior Smoke DefIectors: Every level: y Every Bedroom: ` Outside every bedroom area: V/ Inter Connected: Battery backup: Carbon Monoxide Detector Attic access 30 inches x 22 inches x 30 inches(height)in accessible area V-/- Crawl Spaces 18 inch x 24 inch access, I sq.ft.-150 sq.ft.vents Bathroom Fans,if no window V// Plumbing fixtures Foundation insulation of Floor truss,draft stopping finished basement 1,000 sq.ft. ✓ Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed/Heat Trap/Water Temp 110 Enclosed Stairs Sheetrock Underside minimum V2"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/3/4 hour fire door door closer Duct work Sealed properly 7 Gas Logs in Sealed or Glass Enclosure Final Electrical f fY Final Survey Plot Plan As Built Septic System/Sewer Dept.Inspection Sticker Site Plan /Variance required Flood Plain Certification,if required Okay to issue C/C or C/0[Temporary/Permanent L:\Building&Codes Forms\Building&Codes\Inspection Forms\Residential Final Alnspec Form-revised-100405.doc ED N ES b Ay Septic Inspection Report Office No. (518) 761-8256 Date I n request received: ' Queensbury Building&Code Enforcement Arrive:l am/ part: am/pm 742 Bay Rd., Queensbury, NY 12804 Inspector's Initials: NAME: Ao-y4a< PERMIT NO.: LOCATION: Iq lk INSPECT ON: RECHECK: Comments and/or diagram Soil T San Loam la Type of Munici I Well Water Waterline se nce ft. Well separation distance ft. Other wells: ft. Abso tlon Field: Total len h ft. Length of each trench ft. Depth of trenches ft. Size of Stone See page Pits: Number Size: x Stone Size: Piping Size Type,/- Building to tank Tank to Distrib Box N Distribution Bo id Pit Opening Sea!A: Y I NJ Partial End Ca Inlet/Outlet Pipes&Baffles Y N Location Separations Foundation to tank ft. Foundation to absorption ft. Se ration of Pits Conforms as per Plot Plan Y Engineer Report and As-Built Y N v�(,.��j 5 . u l�.( Gv (5A,)G. Location of System on Prope Front Rear Left Side Right Side Middle Front Mi a Rear System Use Stat . G K -1'6 Approved Partial Approved Disapproved Last revised 021006 Last revised 1/6/05 Town of Queensbury Fire Marshal 742 Bay Road Queensbury,NY 12804 761-8205/761-8206 fax 745-4437 Factory Built Gas Fireulace/Stove Inspection Report Notice:New York State requires that all UL Listed,factory built appliances be installed according to the instructions specifications contained in the Installation Manual accompanying the appliance.No deviation from the manuf r°s instructions or specifications is allowed. Permit# � , — Schedule 3-0&jime am pm anytime Inspector Name ` � w_ � _Address U" \© U� Flfrough final__ Appliance Manuaa carer s�; �� —� Model# Direct Vent Factory built Chimney Flue Size Double Wall ._ Triple Wall -. Insulated Yes No N/A Comments Floor Protection Clearances to Combustibles (all sides) Firestop(s) Vertical Chase �:� Wall Penetration Vent Clearances to Combustibles �. V70 Vent/ChimneyTermination Chimney height must be 3 feet above roof penetration;2 feet above any combustible construction within 10 feet \ Gas Shut-Off Valve Combustion Air Hearth Extension(if any) Mantel Height above f/p opening. Witness Operation Tank Placement(if LP) White—BuNing Dept. Yellow r Pink—Fare Marshal / —�) (— r`) IC J 1 C' — Ut) Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection requI!, v : C` ` Queensbury Building & Code Enforcement Arrive: a art: Z.- am,�� 742 Bay Road, Queensbury, NY 12804 Inspector's Initial -- NAME: ��I�fl PERM LOCATION: %y_ yf�� ;, c �� INSPECT ON: �; TYPE OF STRUCTURE: Y N N/A Rough Plumbing Nail Plates Plumbing Vent/ Vents in Place 1 1/2 inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet change of direction Pressure Test Drain / Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air / Head for 15 minutes ('Insulationj Residential Check Commercial Check +� _ .� nt Attic Vent - Duct/ Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Buiiding&CodeslInspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doc Revised February 15,2005 D/I"*-/ 6 -")-"C)-CYO Foundation Inspection Report Office No. (518)761-8256 Date Inspection i es re c v _ Queensbury Building&Code Enforcement Arrive: _ Depart: n 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initia NAME: I z PERMIT#: LOCATION: JA .. . `,�INSPECT ON: , TYPE OF STRUCTURE: Comments Y N N/A Footings `e` Piers'' Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this pjirppse on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building&Codes\lnspection Forms\Foundation Inspection Report.doc Last printed 12/20/2005 9:24:00 AM Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspe on re�q�Ciest received: Queensbury Building & Code Enforcement Arrive: amjp epart: amjpm 742 Bay Road, Queensbury, NY 12804 Inspect is Initials: NAME: 96�4 PERMIT #: C ' Z LOCATION: INSPECT ON: Lle TYPE OF STRUCTURE: Y N N/A Rough Plumbing / Nail Plates Plumbing Vent/ Vents in Place ►��- ' 1 1 1/2 inch minimum Drain Size — Washing Machine Drain 2 inch minimum Cleanout every 100 feet / chars a of direction Pressure Test Drain / Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air / Head 50 P.S.I for 15 minutes Insulation / Residential Check/ Commercial Check Proper Vent Attic Vent Duct/ Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/ No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doc Revised February 15,2005 6 - 23 - OG Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection vequest received: e 22—c�ig Queensbury Building & Code Enforcement Arrive: am/ part: am/pm 742 Bay Road, Queensbury, NY 12804 Inspect isInitials: Id I NAME: I .,,e- <4 7 . PERMIT #: -Z i LOCATION: /y I 5'{efh ReWVC- INSPECT ON: TYPE OF STRUCTURE: Y N N/A Rough Plumbing / Nail Plates Plumbing Vent / Vents in Place 1 1/2 inch minimum Drain Size Washing Machine Drain 2 inch minimum I Cleanout every 100 feet change of direction Imo, Pressure Test Drain / Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/ Head .I for 15 minutes Insulation esidential Check/ Commercial Check Proper ent Attic Vent Duct/ Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doc Revised February 15,2005 Framing/ Firestopping Inspection Report Office No. (518) 761-8256 Date Inspec on quest received: Queensbury Building&Code Enforcement Arrive: ,. am/ epart: am/pm 742 Bay Road,Queensbury,NY 12804 Inspector's I itials: � Cr NAME: kit, PERMIT#: � l q LOCATION: -r r INSPECT ON: 4F-)—f la T E OF STRUCTURE: Y N N/A CD NTS Ring �" � Attic Access 22"x 30"minimum Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 '/z w 16 gauge 8 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and water shield 24 inches from wall Fire separation 1, 2,3 hour ire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side 'h inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade 2 -V (AJCL)N(:�1-3 Y b -ZI -vAb Framing /Firestopping Inspection Report Office No.(518) 761-8256 Date Inspetctioil quest received: �-2/-Q4' Queensbury Building&Code Enforcement Arrive:�ic } am/\inDepart: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector s I itials. NAME: 2 f` PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: Y N N/A Frag COMMENTS Attic Access 22"x 30"minimum Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 'h w) 16 gau a(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall Fire separation 1,2, 3 hour Fire wall 2, 3, 4 hour Firestopping fir- ���i�C��U Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side 'h inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade Z -q WLUNLI-�)Lfl y 6 -1/ 1-cyc> Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: 6 --21 -06 Queensbury Building & Code Enforcement Arrive: am/ ep rt: am/pm 742 Bay Road, Queensbury, NY 12804 Inspector's Initials. NAME: e PERMIT #: OS -Z LOCATION: e.r INSPECT ON: 6 2 Ot/ TYPE OF STRUCTURE: Y N N/A Ro& Nobing Nail Plates Plumbing Vent/Vents in Place 1 1/2 inch minimum Drain Size � ) Washing Machine Drain 2 inch minimum / v Cleanout every 100 feet / change of direction J ,pressure Test Drairt/Vent Air / Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping j Air/ Head t/ 50 P.S.I for 15 minutes Insulation / Residential Check / Commercial Check Proper Vent Attic Vent Duct / Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doc Revised February 15,2005 Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building & Code Enforcement Arrive: am/p part: am/pm 742 Bay Road, Queensbury, NY 12804 Inspector's Initials: \_ NAME: PERMIT #: LOCATION: c INSPECT ON: TYPE OF STRUCTURE: Y N/A Plumbing J Nail Plates Plumbing Vent/ Vents in Place 1 112 inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/ change of direction ftssure Test an / Vent Air / Head .S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping At/ S.I Head for 15 minutes Insulation / Residential Check / Commercial Check Proper Vent Attic Vent Duct/ Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doe Revised February 15,2005 Framing / Firestopping Inspection Report Office No.(518) 761-8256 Date Inspection request received: -� D Queensbury Building&Code Enforcement Arrive: am/ m Depart: 1,Aek, am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: PERMIT#: LOCATION: E? z INSPECT ON: oe TYPE OF STRUCTURE: Y N /a COMMENTS Framing -;lthe Access 22"x 30"minimum Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly ✓� �. 12"O.C. Headroom 6 ft. 8 in. Stairwelis 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 '/z w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses �� Anchor Bolts 6 ft. or less on center Ice and water shieldY4 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3,4 hour Firestopping w Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side /z inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall z Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above I below grade 5.0 sf grade Framing / Firestopping Inspection Report 1 > ' 'jelce No. (518) 761-8256 Date Ins ecru n request received: Queensbury Building&Code Enforcement Arrive: a ,,Depart: am/pm 742 Bay Road,Queensbury,NY 12804 Inspe or's I itials _ NAME: ' i C ' ' G C°tom PPE�RMIT#: � 2. / V LOCATION: C ✓ '2 E. v� i"1 \!—INSPECT ON: l L' TYPE OF STRUCT Framing Y N N/A COMMENTS Attic Access 22"x 30"minimum Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in.or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 '/s w 16 gauge(8) 16D nails each side i Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center �� Ice and water shield 24 inches from wall Fire separation 1,2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed 1 16 inch insulation in cavity min. Garage Fire Separation House side '/2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date::ris ction Wiest received: Queensbury Building&Code Enforcement Arrive: p art: am/pm 742 Bay Road, Queensbury,NY 12804 InspectI's nit a1%,� NAME: G PERMIT#: � z� LOCATION: — C INSPECT ON: !� TYPE OF STRUCTURE: el Y N N/A COMMENTS Framing Attic Access 22"x 30"minimum , Jack Studs/Headers i Bracing/Bridging ( ��(i�� —d V Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly c 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 'h w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and water shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side % inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade Foundation Inspection Report Office No.(518)761-8256 Date In do request received: Queensbury Building&Code Enforcement Arrive: pm Depart: am/pm 742 Bay Rd.,Queensbury,NY 12804 Inspect 's Ini ials: NAME: PERMIT#: / LOCATION: SPECT ON: TYPE OF STRUCTURE. Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofmg Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing it poly for wet areas under slab kfill`Approval Plumbing Under Slab PVC/Cast/Copper Foundation sulation Interior Exterio R- Rough Giade 6 inch drop withi ft. L:\Building&Codes Forms\Building&Codes\Inspection Farms\Foundation Inspection Report.doc Last printed 12/20/2005 9:24:00 AM Foundation Inspection Report Office No. (518) 761-8256 Date In�ecti equest received: Queensbury Building&Code Enforcement Arrive: anvpDepart: am/pm 742 Bay Rd., Queensbury, NY 12804 Inspector's Initials: I NAME: �7 PERMIT# e����1�. LOCATION: /`,� T _- I SPECT ON: _ TYPE OF STRUCTURE: Comments Footings ------------- _T__ Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing;Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: _ 12 inch width I 6 inches above footing j 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab VC/Cast/Copper Foundation ation terior Exterior R- _ Rough Grade 6 inch drop within 10 ft. I L:\SueHcniingway'8uilding.Codes.InspectionlFORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report I Office No. (518) 761-8256 Date Ins ct. n�uest r ceived: Queensbury Building& Code Enforcement Arrive: O am/p .Depart: Y am/pm 742 Bay Rd.; Queensbury,NY 12804 Inspector's Initials. , NAME: _`-- ' � PERMIT##: 1 LOCATION: G /�—�� _ INSPECT ON: S_ 06— TYPE OF STRUCTURE: Comments --------- Y N N/A Footings -------- v.--------— — Piers Monolithic Slab I Reinforcement in Place` The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. L.Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampprooting Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: _- 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfrll Approval` _ Plumbing Under Slab PVC/Cast i Copper Foundation Insulation Interior/Exterior R- _ Rough Grade 6 inch drop within 10 ft. LASueHemingwayBuiIding.Codes.Inspection.FORM S\Foundati on Inspection Report.doe January 28,2003 Foundation Inspection Report Office No.(518)761-8256 Date Inspeoiio�request received: !t Queensbury Building&Code Enforcement Arrive: am/p Depart: am/pm 742 Bay Rd.,Queensbury,NY 12804 Inspector's i ials: NAME: ` ` PERMIT#: o�" LOCATION: INSPECT ON: ! fv TYPE OF STRUCTURE: Comments Y N NIA Footin s Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofmg Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LABuilding&Codes FormsWilding&Codes\lnspection FormsVoundation Inspection Report.doc Last printed 12/20/2005 9:24:00 AM VISION ENGINEERING AND CONSTRUCTION, LLC 10 Kimberly Lane Phone:(518)792-9264 Queensbury,NY 12804 Cell: (518) 361-2618 Percolation Rate Test Results Project: s Date: ` h Ir't Time: Weather: C LZ Oy '[ Temperature: f5 Tested By: Daniel W. Ryan RESULTS: Test#1: Location: 1 `� Test Depth: (Z ?:�t inches Pre-soak:X f Yes ❑ No Soil Properties: ElClean gravel (little fines) ❑ Gravel with fines Clean sand (little fines) ❑ Sand with fines ❑ Silt and/or clay ❑ Other: Percolation Rate: _min. J sec. per inch Test#2: Location: L-C;T C> Test Depth: — Inches Pre-soak:k Yes ❑ No Soil Properties: ❑ Clean gravel (little fines) ❑ Gravel with fines Clean sand (little fines) ❑ Sand with fines ❑ Silt and/or clay ❑ Other: Percolation Rate: _min. sec. per inch f ­ ., i r-) /,it �r r t Cr i f ro essiona ea Foundation Inspection Report Office No. (518) 761-8256 Date Ins ection quest received: Queensbury Building& Code Enforcement Arrive: f1 anv Depart: v am/pm. 742 Bay Rd.,Queensbury, NY 12804 Inspecto s itialZV_ NAME: l PERMIT#: LOCATION: _ —j--�_ INSPECT ON: TYPE OF STRUCTURE: n Comments --------- Y N N/A kFoo—tings -------- ---------_ — Piers Monolithic Slab Reinforcement in Place — The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. _ Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump w Footing Drain Stone: ^� — 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfiil Approval Plumbing Under Slab — PVC/Cast/Copper— Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. l L:\SuMcrningway\Building.Codes.Inspection TORMSToundation Inspection Report.doc January 28,2003 �r J �a� A O y 4 , .�3 NACE ENGINEERING, P.C. 169 Haviland Road, Queensbury,NY 12804 Phone-518-745-4400 Fax -518-792-8511 August 30, 2006 Job # 47320 New York State Dept. of Health 77 Mohican Street Glens Falls,NY 12801 RE: Western Reserve Subdivision - Queensbury(T) 19 Western Reserve Trail (Lot# 10) Septic System Dear Sir/Ma'am: This letter is to inform you that we inspected the completed septic system for the house at 19 Western Reserve Trail (Lot#10) in the Western Reserve Subdivision on August 9, 2006. The septic system as installed was for a four bedroom house and consisted of a 1,500 gallon septic tank and 245 lineal feet of absorption trench constructed with stone and perforated pipe. The system conforms to the requirements of the approved subdivision design drawings. Please call me if you have any questions or concerns. Sincerely, Thomas R. Center Jr., P.E. cc: 'Dave Hatin, Town of Queensbury Hayes Construction AUG-17-2006 05:22A FROM:VISION ENGINEERING L 7708817102 TO:15187454437 P.1 WO-9TRY44 (SIC Sr`LVC fa4 WALIV-our &66G)t10,JT- Permit# Permit Date IL REScheck Software Version 3.7.3 Compliance Certificate Project Title: The Duncan -Walkout Basement A4114C Cam/ALL 0 Report Date:08/17/06 H-po'AC75 Co�rST�• Data filename:F:1ResCheckslduncanwo.rck Energy Code: New York State Energy ConservationM Construction Code Location: Warren County,New York Construction Type: Detached 1 or 2 Family Heating Type: Non-Electric TVW I,) a,ec-X6 eure—1 Glazing Area Percentage: 160/9 1 Heating Degree Days: 763S IUD 6 060- Construction Site: Owner/Agent: Designer/Contractor. Permit Date:2006 Pass-es— 410 14.40,,. Better Than Code (UA) M��M��w mm Ceiling 1:Fiat Ceding or Scissor Truss: 1080 30.0 0.0 38 Wall 1:Wood Frame,16"o.c.: 1152 19.0 0.0 58 Window 1:Vinyl Frame:Double Pane with Low-E: 104 0.360 37 Door 1:Glass: 34 0,360 12 Door 2:Solid: 20 0.140 3 Door 3:Solid: 20 0.280 6 Wall 2:Wood Frame,16"o.c.: 1188 19.0 0.0 61 Window 2:Vinyl Frame:Double Pane with Low-E: 130 0.360 47 Door 4:Glass: 34 0.340 12 Wall 3 Walkout:Wood Frame,16"o.c.: 250 19.0 0.0 6 Window 3:Vinyl Frame:Double Pane with Low-E: 80 0.360 29 Door 5:Glass: 34 0.360 12 Basement Wall 1:Solid Concrete or Masonry: 760 0.0 10.0 62 Floor 1:AJI-Wood Joist/Truss:Over Outside Air. 72 30.0 0.0 2 Floor 2:Slab-On-Grade:Unheeted:,insulation Depth:4.0' 32 6.0 23 Furnace 1:Forced Hot Air:92 AFUE The proposed building represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed systems have been designed to meet the New York State Energy Conservation Co struction Code requirements.When a Registered Design Professkmal has stamped and signed this page,they are attesting that the of I or knowledge,belief,and professional Judgment,such plans or specifications are in compliance with this Code. Bul er/Desfgn Company Name Da Project Notes: O` W� 1- OP Previously saved project infomration: Two-Story Colonial Hayes Construction Group ikr 395 Big Ray Road Pee 1 of 6 The Duncan-Walkout Basement 2 = 9 1P��.o �0, 079C 9pFF RUG-17-2006 05:22A FROM:VISION ENGINEERING L 7708817102 TO:15187454437 P.2 Queensbury,NY 12804 The Duncan-Walkout Basement Page 2 of 6 HUG-17-2006 05:22A FROM:VISION ENGINEERING L 7708817102 TO:15187454437 P.3 REScheck Software Version 3.7.3 Inspection Checklist Date:08/17/06 Ceilings: Q Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity insulation Comments: Above-Orade Walls: ❑ Wall 1:Wood Frame, 16'o.c.,R-19.0 cavity Insulation Comments: ❑ Well 2:Wood Frame,16"o.c.,R-19.0 cavity Insulation Comments: Q Wall 3 Walkout:Wood Frame,16"o.c.,R-19.0 cavity Insulation Comments: Basement Walls: Q Basement Wall 1:Solid Concrete or Masonry,7.8'ht/6.8'bg/4.0'Insul,R-10.0 continuous insulation Comments: Exterior insulation must have a rigid,opaque,weatherieststant protective covering that covers the exposed(above-grade) insulation and extends at least 6 in.below grade. Windows: ❑ Window 1:Vinyl Frame:Double Pane with Low-E.U-factor:0.380 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Q Window 2:Vinyl Frame:Double Pane with Low-E,U-factor:0.350 For windows without labeled U-factors,describe features: Wanes Frame Type Thermal Break? Yes No Comments: ❑ Window 3:Vinyl Frame:Doubie Pane with Low-E,U-factor:0.360 For wkxkms without labeled U-factors,describe features: *Panes Frame Type Thermal Break? Yes No Comments: Doors: Q Door 1:Glass,U-factor.0.360 Comments: Q Door 2:Solid,U-factor.0.140 Comments: ❑ Door 3:Sotid,U-tactor.0.280 Comments: ❑ Door 4:Glass,U-factor.0.340 Comments: ❑ Door 5:Glass,U-tactor:0.360 Comments: Floors: Q Floor 1:Ail-Woof Joist/rruss:Over Outside Air,R-30.0 cavity insulation The Duncan-Walkout Basement Page 3 of 6 -1 -cerr�o uZ>:CfC:H t-HUM:VISION ENGINEERING L 7708817102 TO:15187454437 P.4 b Comments: ❑ Floor 2:Slab-On-Grade:Unheated,4AY insulation depth,R-6.0 continuous insulation Comments: Slab insulation to extend down from the top of the slab to at least 4.0 R.OR down to at least the bottom of the slab then horizontally for a total distance of 4.0 ft. Exterior insulation must have a rigid,opaque,weather-resistant protective covering that covers the exposed(above-grade) Insulation and extends at least 6 in.below grade. Heating and Cooling Equlpmettt: ❑ Furnace 1:Forced Hot Air.92 AFUE or higher Make and Model Number: Air Leskags: Q Joints,penetrations,and all other such openings In the building envelope that are sources of air leakage must be sealed. ❑ Recessed lights must be 1)Type IC rated,or 2)Installed Inside an appropriate eir-tight assembly with a 0.5'clearance from combustible materials.If non-IC rated,the fixture must be Installed with a 3'clearance from Insulation. Vapor Retarder: ❑ Required on the wane-in-wither side of all non-vented framed ceilings,walls,and floors. Materials identification: ❑ Materials and equipment must be installed In accordance with the manufaciuret's Installation Instructions. ❑ Materials and equipment must be Identified so that compliance can be determined. ❑ Manufacturer manuals for all Installed heating and cooling equipment and service water heating equipment must be provided. Q Insulation R-values,glazing U-factors,and heating equipment efficiency must be dearly marked on the building plans or specittcallm. Duct Insulation: ❑ Supply ducts in unconditioned attics or outside the building must be insulated to R-11. ❑ Return ducts In unconditioned attics or outside the building must be Insulated to R-6. ❑ Supply ducts in unconditioned spaces must be insulated to R-11. ❑ Return duds in unconditioned spaces(except basements)must be insulated to R- ❑ Return duds In unconditioned spaces(except basements)must be Insulated to R-2. .Insulation is not required on return duds in basements. Dud Construction: ❑ All Joints,seams,and connections must be securely fastened with welds,gaskets,mastics(adhesives), mostio-plus-embedded-fabric,or tapes_Tapes and mastics must be rated UL 181A or UL 181 B. Exception:Continuously welded and locking-type longlfudinal joints and seams on duds operating at less than 2 in.w.g.(SW Pa). Q The HVAC system must provide a means for balancing air and water systems. Temperature Controls: ❑ Each dwelling unit has at leaat one thermostat capable of automatically adjusting the space temperature set point of the largest zone. Electric Systems: L] Separate electric meters are required for each dwelling unit. Fireplaces: ❑ Fireplaces must be installed with tight filling non-combusUcte fireplace doors. 0 Fireplaces must be provided with a source of combustion air,as required by the Fireplace construction provisions of the BWiding Code of New York State,the Residential Code of New York State or the New York City Building Code,as applicable. Service Water Heating: ❑ Water heaters with vertical pipe risers must have a heat trap on both the Inlet and outlet unless the water heater has an Integral heat trap or is part of a circulating system. ❑ insulate circulating hot water pipes to the levels In Table 1. The Duncan-Walkout Basement Page 4 of 6 HLAa-1r-i-2006 O5:23A FROM:VISION ENGINEERING L 7708817102 TO:15187454437 P.5 a Circulating Not Water Systems: Q Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: Q An heated swimming pools must have an on/off heater switch and require a cover unless over 20%of the heating energy is from non-depletable sources.Pod pumps require a time dock. Heating and Cooling Piping Insulation: Q HVAC piping conveying fluids above 105 degrees F or chlded fluids below 55 degrees F must be insulated to the levels In Table 2. The Duncan-Walkout Basement Page 5 of 6 AUG-17-2006 05:23A FROM:VISION ENGINEERING L 7708817102 TO:15187454437 P.6 Table 1:Minimum Insulation Thickness for Circulating Hot Water Pipes Insulation Thickness In Inches by Pipe Sizes Heated Water Non-Circulating Runouts Circulating Mains and Runouts Temperature(*F) Up to 1' Up to 1.25' 1.5'to 2.0' Over 2' 170-180 0.5 1.0 1.5 2.0 140-169 0.5 0.5 1.0 1.5 100-139 0.5 0.5 0.5 1.0 Table 2.Minimum Insulation Thickness for HVAC Pipes Fluid Temp, Insulation Thickness In Inches by Pipe Sizes Piping System Dp5 Range('F) 2'Runouts V and Less 1.25'to 2.0" 2.5'to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.6 1.0 1.0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water.Refrigerant and 40-55 0.5 0.5 0.75 1.0 Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD:(Building Department Use Only) The Duncan-Walkout Basement Page 6 of 6 q c� 4CPe 't Nu REScheck Compliance CertificateChecked By/Da New York State Energy Conservation Construction C6fie REScheckSoftware Version 3.5 Release lc Data filename: C:\Program Files\Check\REScheck\duncan.rck TITLE: The Duncan COUNTY: Warren STATE:New York HDD: 7635 CONSTRUCTION TYPE: Detached 1 or 2 Family HEATING TYPE:Non-Electric DATE: 05/07/05 DATE OF PLANS: 511/05 PROJECT INFORMATION: All COMPANY INFORMATION: Hayes Construction Group 395 Big Bay Road Queensbury,NY 12804 792-9142 COMPLIANCE: Passes Maximum UA=440 Your Home UA=359 18.4%Better Than Code(UA) Gross Glazing Area or Cavity Cont. or Door Perimeter R-Value R-Value U-Factor UA Ceiling 1: Flat Ceiling or Scissor Truss 1080 30.0 0.0 38 Wall 1: Wood Frame, 16" o.c. 1152 19.0 0.0 58 Window 1:Vinyl Frame:Double Pane with Low-E 104 0.360 37 Door 1: Glass 34 0.360 12 Door 2: Solid 20 0.140 3 Door 3: Solid 20 0.280 6 Wall 2: Wood Frame, 16" o.c. 1188 19.0 0.0 61 Window 2:Vinyl Frame:Double Pane with Low-E 130 0.360 47 Door 4: Glass 34 0.340 12 Basement Wall 1: Solid Concrete or Masonry 1000 0.0 10.0 83 Wall height: 7.8' Depth below grade: 6.8' Insulation depth:4.0' Floor 1: All-Wood Joist/Truss:Over Outside Air 72 30.0 0.0 2 Furnace 1: Forced Hot Air,92 AFUE COMPLIANCE STATEMENT: The proposed building represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application. The proposed systems have been designed to meet the New York State Energy Conservation Construction Code requirements. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment, such plans or specifications are in complia e with s Code. Builder/Designer Date �oF NEW O DEL Ry�20� A LU 2 Fi* Z ROFESSI0NP REScheck Inspection Checklist • New York State Energy Conservation Construction Code REScheckSoftware Version 3.5 Release lc DATE: 05/07/05 TITLE: The Duncan Bldg. Dept. Use Ceilings: [ ] 1. Ceiling l: Flat Ceiling or Scissor Truss,R-30.0 cavity insulation Comments: Above-Grade Walls: [ ] 1. Wall 1:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: [ ] 2. Wall 2:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: Basement Walls: [ ] 1. Basement Wall 1: Solid Concrete or Masonry,7.8'ht/6.8'bg/4.0'insul, R-10.0 continuous insulation Comments: Exterior insulation must have a rigid,opaque,weather-resistant protective covering that covers the exposed(above-grade)insulation and extends at least 6 in.below grade. Windows: [ ] 1. Window 1: Vinyl Frame:Double Pane with Low-E,U-factor: 0.360 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? [ ] Yes [ ]No Comments: [ ] 2. Window 2:Vinyl Frame:Double Pane with Low-E,U-factor:0.360 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? [ ]Yes [ ]No Comments: Doors: [ ] 1. Door 1: Glass,U-factor:0.360 Comments: [ ] 2. Door 2: Solid,U-factor:0.140 Comments: [ ] 3. Door 3: Solid,U-factor:0.280 Comments: [ ] 4. Door 4: Glass,U-factor: 0.340 Comments: Floors: [ ] 1. Floor 1: All-Wood Joist/Truss:Over Outside Air,R-30.0 cavity insulation Comments: Heating and Cooling Equipment: [ ] 1. Furnace 1: Forced Hot Air,92 AFUE or higher Make and Model Number Air Leakage: [ ] Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed. [ ] Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a 0.5"clearance from combustible materials.If non-IC rated,the fixture must be installed with a { 3"clearance from insulation. Vapor Retarder: [ ] Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. Materials Identification: [ ] { Materials and equipment must be installed in accordance with the manufacturer's installation instructions. [ ] Materials and equipment must be identified so that compliance can be determined. [ ] Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. [ ] Insulation R-values,glazing U-factors,and heating equipment efficiency must be clearly marked on the building plans or specifications. Duct Insulation: [ ] Supply ducts in unconditioned attics or outside the building must be insulated to R-11. [ ] Return ducts in unconditioned attics or outside the building must be insulated to R-6. ( ] ( Supply ducts in unconditioned spaces must be insulated to R-11. [ ] Return ducts in unconditioned spaces(except basements)must be insulated to R-2. Insulation is not required on return ducts in basements. Duct Construction: [ ] I All joints, seams,and connections must be securely fastened with welds,gaskets,mastics (adhesives),mastic-plus-embedded-fabric,or tapes. Duct tape is not permitted. Exception:Continuously welded and locking-type longitudinal joints and seams on ducts ( operating at less than 2 in.w.g.(500 Pa). [ ] ( Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. [ ] Cooling ducts with exterior insulation must be covered with a vapor retarder. [ ] Air filters are required in the return air system. [ ] The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] Each dwelling unit has at lesat one thermostat capable of automatically adjusting the space temperature set point of the largest zone. Electric Systems: [ ] Separate electric meters are required for each dwelling unit. Fireplaces: [ ] Fireplaces must be installed with tight fitting non-combustible fireplace doors. [ ] Fireplaces must be provided with a source of combustion air,as required by the Fireplace construction provisions of the Building Code of New York State ,the Residential Code of New York State or { the New York City Building Code ,as applicable. Service Water Heating: [ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. [ ] Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: [ ] Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: [ ] i All heated swimming pools must have an onloff heater switch and require a cover unless over 20% of the heating energy is from non-depletable sources. Pool pumps require a time clock. { Heating and Cooling Piping Insulation: Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes. Insulation Thickness in Inches by Pipe Sizes Heated Water Non-Circulating Runouts Circulating Mains and Runouts Temperature(F) Up to 1„ Up to 1.25" 1.5"to 2.0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-160 0.5 0.5 1.0 1.5 100-130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for HVAC Pipes. Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range F 2"Runouts 1"and Less 1.25"to 2" 2.5"to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 1.0 and Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD (Building Department Use Only)