Loading...
2005-334 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 (Z)w Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: P20050334 Date Issued: Wednesday, April 26, 2006 This is to certify that work requested to be done as shown by Permit Number P20050334 has been completed. Tax Map Number: 523400-289-008-0001-072-000-0000 Location: 4 FIELDVIEW Rd Owner: CHRISTINE PURDY Applicant: CHRISTINE PURDY This structure may be occupied as a: Residential Addition By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building& Code Enforcement Planning Board or Zoning Board of Appeals. Permit No. Building&Codes Office-Department of Community Development-Town of Queensbury Fee Paid 742 Bay Road,Queensbury,NY 12804 Dave Hatin,Director !2odes@aueensbury.net Recreation Fee Phone: (518) 761-8256 FAX: (518) 745-4437 Principal Structure Bui inni 'p K��q� � t Application Application & Plans subject to review before issuancd`c i'valid permit for construction TOWN o Qu Instructions: A permit must be obtained before begilim NXE %%�o inspections will be made until the applicant has received a valid building permit. All app scan s this application must be completed and must appear on the application form. r Applicant/Builder ✓Li li ;G f'` �y:�, ,y� Owner: Address: Address: o� 0-e :. Home Phone: 3is- Home Phone: �5�- d t° — Email Address: o��s Email Address: _ _ ZLA- Cell Phone: 7 y</- © Cell Phone: _ ',a/ so2 5--8 FAX Phone: FAX Phone: IKI,* Person responsible for supervision of work with respect to building and codes compliance: Name: Address: a �r �, Phone 4131S Location of proposed construction: Lot No. Legal Address: Tax Map Number: `,2 31 461'g" -,41,12 Subdivision Name: Estimated Cost of Construction: $ ® ecge c� Proposed construction is for: Residential Use _Commercial Use Name of Business: a(/A If proposed construction is an addition, what will use of new addition be? �a`n New Addition Alteration Proposed Construction V Floor 2^d floor Other Total Proposed structure (Occupancy Type) Sq. Ft. sq.ff. Sq. Ft. Square feet Height Ft.&in. Single-Family Dwelling it Two-Family Dwelling Townhouse Multifamily Dwelling Number of Units: Office Mercantile Manufacturing Other: Attached Garage 1, 2, 3 Type of Heating System: Electric, Qil, Gas, Wood, Forced Hot Air, Baseboard, Cher: � ___. ../ Is a fireplace and/or woodstove being installed, please refer to a separate application. _Yes _�'No Applications are subject to Zoning Administrator, Code Compliance, and Structural Plan review. The Building and Codes Office will allow commencement of your proposed project only after issuance of your permit. Declaration: Please sign below after you have carefully read the statement: To the best of my knowledge, the statements contained in the application, together with the plans and Job Site Address: �Iy'ey,-5 Al 61 Date: —�—� Owner: / eo Application No. File No. Building Permit — Calculation Sheet Natural Light, Ventilation & Emergency Egress Requirements Habitable Area of Req. Light Actual Req.Vent Actual Sq.Ft. Remarks Room Room 8%of Room Light 4%of Room Vent Opening for in Area Square Area Square Egress Square Footage Footage Feet Y.cC, L:\SueHemingway\Building.Pem-dt.FORMS\Nat.Light.V entil.Calculation.Sheet.doc Job Site Address: 4 J11ticJ 90,f-f4 r Date: o — x Owner: Application No. File No. O S 3 WINDOW SCHEDULE Window Window Mfg. Window Unit or S € wear Gear Special Hardware or Number or Name Model Stock i rC� t> g rlas � b" g y { ear �ng r He 61 Instructions Letter on Or Type Number _ z " S '� In`n�k�es Plan Call Size g' I .r.. .,. ,. ... . ..r C°335- �03 3 3 / p,`b' `,�r1� 1`� ��L ct57 - r5 THIS LINE HAS EXAMPLES OF SAMPLE ENTRIES Tempere,d'r ,.t �! A& •� �.' as &F e F� • ..<a ` - ,:�"a CTI3Zing '3 Yz 'L 3 u- L:\SueHemingway\Building.Permit.FORMS\Window Schedule.doc nn ter' 7 9q-oq7s FCheck Residential Plan Review: One c& Two Family Dwellings YININIA (2)Full sets of plans Over 1,500 sq. ft.—Stamped Design Loads On Plans: 90 Wind Floor Loads 40 psf 70 Ground Snow Load Sleeping Areas and Attics 30 psf Calculations: Window Schedule With Glass Size Y / Door Schedule/Main Entrance 36"Door 1/ Emergency Escape Or Bedrooms and Habitable Space Above/Below grade,5.7 sq. ft. Grade,5.0 sq.ft. 24"(h)x 20"(w)min. 44"Max.Height above Boor Residential Check Paperwork Compliance and Inspectors Checklist: OK =. Dampproofmg/Waterproofing Materials On Plans Foundation Drainage On Plans,if required " 6"Drop in 10'Exterior Grade Framing Cross Section For Each Roof Line,Vertical Fire Stopping Every 10'Where Required Ice and Snow shield 24"Inside Exterior Wall/24"Inside Knee Walls Platforms At Exterior Doors Stairway Headroom 6' 8'All Stairs 36"Widt Stair Run and Rise Winder Run and Rise Spiral Not Allowed From 2Dd Story _ --;- Smoke Detectors Battery Backup and Proper Location B throom Fixtures Proper Clearance Hall Width, 36"nun. �y Handrails More Than One Riser On Open Sides Railing and Guards>30"I Basement Stairs Included/Closed Risers More Than 4"in Ht. hL Safety Glazing Notes Foi Required Areas Garage Fire Separation Garage Floor Sloped Attic Access Roof over 30"—22"x 30"/Crawl Spaces 18"x 24"Access Carbon Monoxide Detector Lowest Sleeping Level S Test Results, if required Septic To Well Or Water Line Separation All Paperwork Signed Check Residential Plan Review: One&Two Family Dwellings YIN/N1 (2)Full sets of plans Over 1,500 sq. ft.—Stamped Design Loads On Plans:90 Wind Floor Loads 40 psf --�- 70 Ground Snow Load Sleeping Areas and Attics 30 psf Calculations: Window Schedule With Glass Size / Door Schedule/Main Entrance 36"Door v Emergency Escape Or Bedrooms and Habitable Space Above/Below grade,5.7 sq.ft. Grade,5.0 sq.ft. 24"(h)x 20"(w)min. 44"Max.Height above floor Residential Check Paperwork Compliance and Inspectors Checklist: OK Dampproofing/Waterproofing Materials On Plans _ Foundation Drainage On Plans,if required —� 6"Drop in 10' Exterior Grade VIFraming Cross Section For Each Roof Line,Vertical Fire Stopping Every 10'Where A Required Ice and Snow shield 24"Inside Exterior Wall/24"Inside Knee Walls Platforms At Exterior Doors Stairway Headroom 6' 8'All Stairs 36"Width rc Stair Run and Rise Winder Run and Rise Spiral Not Allowed From 2m Story Smoke Detectors Battery Backup and Proper Location Bathroom Fixtures Proper Clearance Hall Width,36"min. j Handrails More Than One Riser On Open Sides Railing and Guards>30"/Basement Stairs Included/Closed Risers More Than 4"in Ht. —� Safety Glazing Notes Fojr Required Areas Garage Fire Separation Garage Floor Sloped Attic Access f� Roof over 30"—22"x 30"/Crawl Spaces 18"x 24"Access Carbon Monoxide Detector Lowest Sleeping Level T Soil Test Results, if required- Septic To Well Or Water Line Separation All Paperwork Signed ueensbu Building _Q ry u lding & Code Enforcement Residential Final Inspection Office No. (518)761-8256 Arrive: am/pm Depart: -1 =. .""rpm Date Inspection request received: Inspector's Initials: A(A e� NAME: YA PERMIT LOCATION: TYPE OF STRUCTURE: / Comment 1' Yes No N/A s ,� Building Number/Address visible from road Chimney Height/"B"Vent/Direct Vent Location / Fresh Air Intake 3 inch Plumbing Vent through roof minimum 6 inches Roof Complete/Exterior Finish Complete Platform at all exterior doors Guards at stairs,decks,patios more than 30 inches above grade Guard at stairwell at 34 inches or more Guard at deck,porches 36 inches or more Handrail Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches Interior Handrails @ stairs 2 or more risers Grade away from foundation 6 inches with 10 feet 6 inch clearance to sill plate Gas Valve Valve shut-off exposed/regulator 18 inches above grade Interior privacy/trim/doors/main entrance 36 inches Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors: Every level: Every Bedroom: Outside every bedroom area: Inter Connected: Battery backup: Carbon Monoxide Detector Attic access 30 inches x 22 inches x 30 inches(height)in accessible area Crawl Spaces 18 inch x 24 inch access, 1 s .ft.-150 s .ft.vents Bathroom Fans,if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 s . ft. Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site Oil Furnace shut-off at entrance to furnace area Fumace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed/Heat Trap/Water Tern 110 Enclosed Stairs Sheetrock Underside minimum''/z"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/%hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure _ Final Electrical Final Survey Plot Plan As Built Septic System/Sewer Dept.Inspection Sticker Site Plan /Variance re u' Flood Plain Certifc n re wire Oka t ary/Permanent L:\Building&Codes Forms\Buiiding&Codes\Inspection Forms\Residential Final Inspection Form—revised—I 00405.doc COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC. Main Office 176 Doe Run Road-Manheim,PA 17545 MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL ' Permit No........................................Cert. N2 93959 Cut-in Card No.......................... .. Owner.......................................... ...................................... . ..)...j✓a.............�.................`....7.....L....L....T...�................�.....�.j. �..................... .. Location.. ...F/C.Ga T .......... .s Installation Consisti ng of ................................t................................I..,........................... ....................................................................................................................................................a. ... .o ....... ......VG?.Tc ..+c....a A"tU0r'7L? InstalledBy...........................................................................................Lic.No................................................... The conditions following governed the issuance of this certificate,and any certificate previously issued is cancelled:- This certificate only covers the electrical equipment and installation conditions as of date. Upon the introduction of additional equipment or alterations,application shall be promptly made for inspection. Inspectors of this Company shall have the privilege of making pections at any time, and if its rules are fviolated,tthe Company shall have the right to e✓ e t is scat 7 Date.....2..� sl: .............. INSPECTOR... ........... ............................................. Memher N_RP A..I_A_F._I_ Queensbury Building & Code Enforcement - Residential Final Inspection Office No. (518)761-8256 Arrive: am/mu D art;Gam. -Lt)tV m Date Inspection request received: oZ/13 ep Inspector's Initials: t NAME: ( eA ,. PERMIT#: � iN LOCATION: >'i DATE: e k7bTYPE OF STRUCTURE: T _fi Co e sYes No N/A Buildin Number/Address visible from road Chimne Hei ht/"B"Vent/Direct Vent Location Fresh Air Intake 3 inch PlumbingVent through roof minimum 6 inches Roof Complete/Exterior Finish Com lete Platform at all exterior doors Guards at stairs,decks,patios more than 30 inches above grade Guard at stairwell at 34 inches or more Guard at deck,porches 36 inches or more Handrail Termination at Newell Post or Wall Interior/Exterior Railings 34 inches to 38 inches Interior Handrails @ stairs 2 or more risers Grade away from foundation 6 inches with 10 feet 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18 inches above grade Interior privacy!trim/doors/main entrance 36 inches Bathroom/Kitchen watertight Safe Pzin /Window in stairwells safety glazing Interior Smoke Detectors: Every level: Every Bedroom: Outside every bedroom area: Inter Connected: Battery backup: Carbon Monoxide Detector Attic access 30 inches x 22 inches x 30 inches(height)in accessible area Crawl Spaces 18 inch x 24 inch access, 1 s .ft.-150 s .ft.vents Bathroom Fans,if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 s .ft. 1 r FF Emergency egress below grade Gas Furnace shut-off within 30 feet or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valve(s)installed/Heat Trap/Water Temp 110 Enclosed Stairs Sheetrock Underside minimum''/2"Gypsum Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/3/4 hour fire door/door closer Duct work Sealed properly Y Gas Logs in Sealed or Glass Enclosure Final Electrical Final Survey Plot Plan or As Built Septic System/Sewer Dept.Inspection Sticker Site Plan /Variance required ` Flood Plain Certification,if required Okay to issue C/C or C/O[Temporary/Permanent L:\Building&Codes Forms\Building&Codes\Inspection Forms\Residential Final Inspection Form revised 100405.doc Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building & Code Enforcement Arrive: am/pKn Depart: am/ m 742 Bay Road, Queensbury, NY 12804 Inspector's Initials: .1_ 7-� -z_ n� NAME: PERMIT #: 05 3 LOCATION: :e J INSPECT ON: TYPE OF STR CTURE: �r Y N N/A Rough Plumbing / Nail Plates 9 / AM Plumbing Vent Vents in Place /1 1 1/2 inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/ change of direction Pressure Test Drain / Vent Air / Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test CZ--j (,/Nb � Water Supply Piping �j Air/ Head 5 P.S.I for 15 minutes ulation Residential Check/ Commercial Check Proper Vent Attic Vent Duct / Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doc Revised February 15,2005 F 10 Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Inspection request received: S p Queensbury Building& Code Enforcement Arrive: _am/p epart: a pm 742 Bay Road, Queensbury, NY 12804 Inspector's Initials€y�—F=� � NAME: PERMIT PERMIT#: LOCATION:( INSPECT ON: (J � TYPE OF STRUCTURE: Y N N/A Framing COMMENTS Jac Studs/Headers racing/Bridging µ L,¢� @ f4-,2 -5Y6 Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly `� i 12"O.C. �U V I PZ lt7l Headroom 6 ft. 8 in. J aGK Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %z (w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour L�irestopin Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %s inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 ?-- /U cam.--- Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received' Queensbury Building & Code Enforcement Arrive: am/ epart: am pm 742 Bay Road, Queensbury, NY 12804 Inspector's Initials: ^J� NAME: 9-1, PERMIT #: aO-X�'- 33 5Z LOCATION: INSPECT ON: 5 Z&ZO5 �. TY E OF STRUCTURE: �-- Y N N/A Rough Plumbing / Nail Plates Plumbing Vent/ Vents in Place 1 1/2 inch minimum Drain Size r Washing Machine Drain 2 inch minimum Cleanout every 100 feet / change of direction Pressure Test Drain / Vent Air/ Head 5 P.S.I. or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air / Head 50 P.S.I for 15 minutes Insulation Residential Check Commercial Check E per Vent is Vent Duct o ater Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly / No duct tape COMMENTS: LAPam Whiting\Building&Codes\Inspection Forms\Rough Plumbing Insulation Report.revised Nov 17 2003.doe Revised February 15,2005 Framing / Firestopping Inspection Report 3 Office No. (518) 761-8256 Date Inspection re est re iv d: Queensbury Building&Code Enforcement Arrive: art:-J�J14;�a�Un m 742 Bay Road, Queensbury, NY 12804 Inspector's In' als C NAME: PERMIT#: 33q LOCATION: 1 INSPECT ON: TYPE OF STRUCT RE: Y N N/A aming COMMENTS Jack Studs/Headers R% L �R�� �D Bracing/Bridging 6 Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls _ Metal Strapping for Notches Top Plate 1 %2 (w) 16 gauge (8) 16D nails each sidean —r t Draft stopping 1,000 sq. ft. floor trusses +1�� Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall �— Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour ��� Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side % inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASueHemingway\Building.Codes.Inspection.FORM S\Framing Firestopping Inspection Report.doc January 28,2003 Septic Inspection Report Office No. (518) 761-8256 Date Inspection re st rece' e . Queensbury Building&Code Enforcement Arrive: m/ art: c 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initi NAME: P,ul( PE Fr NO.: LOCATION: I _E l_D mix') IN PECT ON: (0 —7-1� RECHECK: Comments and/or dia r` Soil Type: Sand/Loam/Clay -Type of Water: Municipal/Well Water Waterline separation distance ft. Well separation distance ft. Other wells: ft. Abso tion Field: Total length ft. -Length of each trench ft. D th of trenches ft. Size of Stone Seepage Pits: Number Size: x Stone Size: -Piping Size -Type -Building to tank Tank to Distribution Box Distribution Box to Field/Pit ening Sealed: Y/N/Partial Location/Separations Foundation to tank ft. Foundation to absorption ft. -Separation of Pits ft. Conforms as per Plot Plan Y N Location of System on Property: Front Rear Left Side Right Side Midd/FroMiddle Rear S stem Use roved Partial Approved and needs to be re-inspected,please call the Building&Codes Office Disapproved L:1SueHemingway\Building.Codes.Inspection.FORMS\Septic Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive: am/VL, Depart. in742 Bay Rd., Qu nsbu NY 12804 Inspector PU ry, s Initi U NAME: _ PERMIT #: LOCATION: �� (!>�ll� ) INSPECT ON: TYPE OF STRUCTURE: Comments V N N/A Footings Piers R Monolithic Slab Reinforcement in Place~ The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour � inforcement in Place Foundafien Dampproofing T Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing mil poly for wet areas under slab _ Bac�"t�A�roval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. I,\StleHemingway\i3uilding.C:'odes.lnspection.FORMS\Foundation Inspection Repod.doc January 28,2003 r Foundation Inspection Report rn` _ Office No. (518) 761-8256 Date Inspection req S r eiv Queensbury Building&Code Enforcement Arrive: a p Depart: TZ anI 742 Bay Rd., Queensbury, NY 12804 Inspector's Initia NAME: — 's� PERMIT#: 0 LOCATION: INSPECT ON: TYPE OF STRUCTURE: Comments Y N N/A L,Fd otings Q> Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- __ Rough Grade 6 inch drop within 10 ft. 1.ASueHemingway\Building.Codes.Inspec tion.FORMSToundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection r rPECTIO&: Queensbury Building &Code Enforcement Arrive: mDepart: a m 742 Bay Rd., Queensbury.NY 12804 Inspector's Initi s NAME: ` �(� P S Z LOCATION: 1 0 13 TYPE OF STRUCTURE: RQ= ^ Comments 4 --�— Y N N/A oting—s Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump j Footing Drain Stone: ` 12 inch width v 6 inches above footing �J'' 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes.InspectionTORMSToundation Inspection Report.doc January 28,2003 e t N ber e V� MECcheck Compliance Report ticked By/Date New York State Energy Conservation Construction Cod MECcheck Software Version 3.3 Release I Data filename:Untitled TITLE: moiler addition inglee COUNTY: Warren RECEIVED STATE:New York HDD: 7635 CONSTRUCTION TYPE:Detached 1 or 2 Family HEATING TYPE:Non-Electric TOWN OF QUEENSBURY DATE: 06/02/05 BUILDING AND CODE DATE OF PLANS: 5/7/05 COMPLIANCE: Passes Maximum UA= 110 Your Home=72 34.5%Better Than Code Gross Glazing Area or Cavity Cont. or Door Perimeter R-Value R-Value U-Factor UA Ceiling 1: Cathedral Ceiling(no attic) 348 38.0 0.0 9 Wall 1:Wood Frame, 16" o.c. 618 21.0 0.0 32 Window 1:Wood Frame,Double Pane with Low-E 42 0.340 14 Window 2:Wood Frame,Double Pane with Low-E 23 0.280 6 Basement Wall 1: Solid Concrete or Masonry,7.0'ht/6.0'bg/7.0'insul 112 11.0 0.0 8 Basement Wall 2: Solid Concrete or Masonry, 1.0'ht/l.0'bg/l.0'insul 38 11.0 0.0 3 Boiler 1: Gas-Fired Steam, 89 AFUE COMPLIANCE STATEMENT: The proposed building represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application. The proposed systems have been designed to meet the New York State Energy Conservation Construction Code requirements. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief, and professional judgment,such plans or specifications are in compliance with this Code. Builder/Designer Date � �/ B MECcheck Inspection Checklist New York State Energy Conservation Construction Code MECcheck Software Version 3.3 Release lc DATE: 06/02/05 TITLE:moller addition inglee Bldg. Dept. Use Ceilings: [ ] 1. Ceiling 1: Cathedral Ceiling(no attic),R-38.0 cavity insulation Comments: Above-Grade Walls: [ ] 1. Wall 1:Wood Frame, 16" o.c.,R-21.0 cavity insulation Comments: Basement Walls: [ ] 1. Basement Wall 1: Solid Concrete or Masonry,7.0'ht/6.0'bg/7.0'insul, R-11.0 cavity insulation Comments: [ ] 2. Basement Wall 2: Solid Concrete or Masonry, 1.0'ht/l.0'bg/1.0'insul, R-11.0 cavity insulation Comments: Windows: [ ] 1. Window 1:Wood Frame,Double Pane with Low-E,U-factor: 0.340 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? [ ]Yes[ ]No Comments: [ ] 2. Window 2:Wood Frame,Double Pane with Low-E,U-factor: 0.280 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? [ ]Yes [ ]No Comments: Heating and Cooling Equipment: [ ] 1. Boiler 1:Gas-Fired Steam,89 AFUE or higher Make and Model Number Air Leakage: [ ] Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed. [ ] Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly with a 0.5" clearance from combustible materials. If non-IC rated,the fixture must be installed with a 3" clearance from insulation. Vapor Retarder: [ ] Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. Materials Identification: [ ] Materials and equipment must be installed in accordance with the manufacturer's installation instructions. [ ] Materials and equipment must be identified so that compliance can be determined. [ ] Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided. [ ] Insulation R-values,glazing U-factors,and heating equipment efficiency must be clearly marked on the building plans or specifications. Duct Insulation: [ ] Supply ducts in unconditioned attics or outside the building must be insulated to R-11. [ ] Return ducts in unconditioned attics or outside the building must be insulated to R-6. [ ] Supply ducts in unconditioned spaces must be insulated to R-11. [ ] Return ducts in unconditioned spaces(except basements)must be insulated to R-2. Insulation is not required on return ducts in basements. Duct Construction: [ ] I All joints,seams,and connections must be securely fastened with welds,gaskets,mastics (adhesives),mastic-plus-embedded-fabric,or tapes. Duct tape is not permitted. Exception: Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g. (500 Pa). [ ] Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. [ ] Cooling ducts with exterior insulation must be covered with a vapor retarder. [ ] Air filters are required in the return air system. [ ] The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] Each dwelling unit has at lesat one thermostat capable of automatically adjusting the space temperature set point of the largest zone. Electric Systems: [ ] Separate electric meters are required for each dwelling unit. Fireplaces: [ ] Fireplaces must be installed with tight fitting non-combustible fireplace doors. [ ] Fireplaces must be provided with a source of combustion air,as required by the Fireplace construction provisions of the Building Code of New York State,the Residential Code of New York State or the New York City Building Code,as applicable. Service Water Heating: [ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. [ ] Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: [ ] Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: [ ] All heated swimming pools must have an on/offheater switch and require a cover unless over 20% of the heating energy is from non-depletable sources. Pool pumps require a time clock. Heating and Cooling Piping Insulation: [ ] HVAC piping conveying fluids above 105'F or chilled fluids below 55 OF must be insulated to the levels in Table 2. Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes. Insulation Thickness in Inches by Pipe Sizes Heated Water Non-Circulating Runouts Circulating Mains and Runouts Temperature(F) Up to 1" Up to 1.25" 1.5" to 2.0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-160 0.5 0.5 1.0 1.5 100-130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for HVAC Pipes. Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range F 2"Runouts 1" and Less 1.25" to 2" 2.5" to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 1.0 and Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD(Building Department Use Only) 4 i JFIFA �. � PY a4NEt� Y t�I�N OF pUEENSBURY BUitDING DEPAR�`PAENr -\ — - used on our limif ., ;�, Ant If our comments shal-!---- laps s �stNed as indicating the coand cruLM—m— m Lance wi the Boil In lull ill � A a RECEIVED 0 I � MAY 2 3 2005 I TOWN OF QUEENSBURY BUILDING AND CODE e y, IlI..� 33-g'� 33!0 I L% /VIf O 4 41 '� "I hart seer or observed, or el eve I sa i oviden,c? of A�NO �� �' all obi `ts slljicri las i„Sses, `S I n - �• 3 ?.� °r�a,[z �3 '`' O � 7 f ,r,tLi 0d' • s