Loading...
PTI-004658-2020 08312020INSPECTION WORKSHEET (PTI-004658-2020) Case Number:PT-0472-2020Case Module:Permit Management Inspection Date:08/31/2020Inspection Status:Partial Pass Inspector:Dave HatinInspection Type:Property Transfer Inspections Job Address:5 Antigua Rd Parcel Number:239.17-1-2 Lake George, NY 12845 Contact TypeCompany NameName AgentLittle, O'Connor & Borie, P.C. Primary OwnerMarilyn Breyo Checklist ItemPassedComments WatertightFalse Building Inspector NotesFalse Weather/lack of information/inaccessibilityFalse Service contract (required)False Holding tank (if yes, include capacity)False Capacity in gallonsTrue1000 System/components indicate unacceptableFalse Is there a high water alarm?FalseAlarm not working 8/31/20 recieved Mahoney alarm certification Roof gutters don't discharge over leach fieldFalse Concrete tankTrue Temperature (Fahrenheit)True65 D-box materialFalse Apparent structural damageTrueNo Visible scum layerTrueNo Septic tank (include # of tanks)True1000 gallons Number of tank compartmentsFalseNeed to verify 8/31/20 verified Plumbing fixtures tested & confirmedTrue Evidence of a pipe bypassing tankTrueNo Holding Tank:verify level risescap. w/in 250 galFalse Metal septic or leech tank or cesspoolFalse Whirlpool tub add 250 galFalse System appears undersized/undersized componentsFalse Foundation drain(s)False Verify 50% & 90% floatsFalse Is there evidence of surface water infiltratingTrue O StormwaterFalse Is septic tank sized for bdrms+whirlpool+grinderTrue Garbage grinder add 250 galFalse Tank coverTrue System appears to have functioned adequatelyTrue System passes all function testingTrue Outlet pipe (automatic failure, if yes)False Metal tank (automatic failure)False September 01, 2020Page 1 of 3 INSPECTION WORKSHEET (PTI-004658-2020) Checklist ItemPassedComments Does the pump(s) appear to be operating properly?True Surface discharge? (if yes, to where?)False Roof runoffFalse System needs repairsTrueNo Sump pump not connected to septic systemFalse Sand filterFalse Leaching bedFalse Outflow line invert above leach line invert(s)?False Overflow pipe (automatic failure)False Depth below grade to top of tankTrue6" to 12" Evidence of prolonged high liquid levelTrueNo Access riser? (if yes, depth to cover)TrueInstall access riser on pump station 8/31/20 installed CesspoolFalse Inlet baffleTrue Water softener not hooked to septic systemFalse OtherFalse Seepage Pits: NumberFalse Cracked, corroded or deformed?TrueNo WeatherTrueSunny No treatment tank/other critical component(s)False Raised systemTrueNo failure Cracked, corroded or deformed?False Excavate 18" around,no leach field connectedFalse OtherFalse ManufacturerFalse OtherFalse Sump pump(s)False ModelFalse TypeFalse Liquid level AT/ABOVE/BELOW (one) discharge invertTrueNo OtherFalse Is tank pumped more than 4x/year?TrueNo Are both switch and alarm operable?TrueSubmit certification from Mahoney Alarms 8/31/20 recieved Recommend upgrade/expand/replace 1+ componentsFalse Main tank cleanout size and locationTrue12" Mound systemFalse Absorption fieldFalse Water tight tankTrue Ejector or grinder pump sealedTrue Are there any obvious electrical shortcomings?TrueNo Test each fixture flow to septic tankTrue Outlet baffleTrueNeed to verify 8/31/20 verified September 01, 2020Page 2 of 3 INSPECTION WORKSHEET (PTI-004658-2020) Checklist ItemPassedComments Leaking water fixturesTrueNo Aerobic systemFalse Solids in D-boxFalse As-built provided is accurateFalseProvide as built for tank cover locations Dosing or pump tank sealedTrue Evidence of liquid above outlet inverts?False Number of drop box(es)False Plastic tankFalse On-site as-built req'd before insp is completeFalseYes September 01, 2020Page 3 of 3