blower door test Ryan Wild 518.832.9213 ryan@clearvuinspections.com Silverberg Classic Cars 240 Lockhart Mountain Road Lake George, NY 12845 518.744.2064 Don Beagle donbeagle02@gmail.com We, ClearVU Inspections, performed a one-point air tightness, blower door test on the single family dwelling at ​240 Lockhart Mountain Road, Lake George, NY​ to determine the air changes per hour on September 10, 2020. The dwelling was depressurized and the testing procedure performed as per ​IECC – R402.4.1.2​. Test conditions were as follows: Fan location - Front door 640’ above sea level 1,203 CFM50 66°F outside air temperature 66°F inside air temperature Pre-Test Baseline Building Pressure -0.1 Pa -50.0 Pa testing pressure TEC DG-1000 & Model 3 Fan Altitude Correction Factor = (1+(.000006 x altitude)) x CFM50 = n/a Results:​ ( 1,203 CFM75) / ( 5,475 cubic feet) = 0.220 ACH50 IECC – C402.5 - ​The ​thermal envelope​ of buildings shall comply with Sections C402.5.1 through C402.5.8, or the building ​thermal envelope​ shall be tested in accordance with ASTM E 779 at a pressure differential of 0.3 inch water gague (75 Pa) or an equivalent method approved by the code official and deemed to comply with the provisions of this section when the tested air leakage rate of the building thermal envelope is not greater than 0.40 cfm/ft²(2.0 L/s m²). Where compliance is based on such testing, the building shall also comply with Sections C402.5.5, C402.5.6 and C402.5.7. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstrippingor other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open; 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. Ryan Wild HERS Rater/BPI - 5063518 ClearVU Inspections www.clearvuinspections.com